BLD-Final | 2/3/2015 | 2/4/2015 | 2/4/2015 | A | PASS |
Dave Hannah
|
|
|
Brett Phone #: ###-####
|
DOC - Permit Finaled | 2/4/2015 | 2/4/2015 | 2/4/2015 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 1/29/2015 | 1/30/2015 | 2/2/2015 | P | PEND |
Dave Hannah
|
|
|
Rick Phone #: ###-#### needs latters in window wells temp glass in garage bottom of stairs
|
BLD-Energy code compliance | 11/6/2014 | 11/7/2014 | 11/7/2014 | A | PASS |
Dave Hannah
|
|
|
Brett Phone #: ###-####
|
BLD-Framing/Rough-in | 11/6/2014 | 11/7/2014 | 11/7/2014 | A | PASS |
Dave Hannah
|
|
|
Brett Phone #: ###-####
|
Routing Walk-In (BLD) | 11/6/2014 | 11/6/2014 | 11/6/2014 | A | DONE |
Perry Paine
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/6/2014 | | |
|
|
|
|
Inspection Record Card- Bld | | | 11/6/2014 | | |
|
|
|
|
Case Summary (BLD) | | | 11/6/2014 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/6/2014 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 11/4/2014 | 11/5/2014 | 11/5/2014 | A | PEND |
Dave Hannah
|
|
|
for garage // Brett Phone #: ###-#### ok to insulate but needs to resubmit plans for garage
|
BLD-Energy code compliance | 9/4/2014 | 9/5/2014 | 9/5/2014 | A | PASS |
Phil Shearer
|
|
|
Brett Phone #: ###-####
|
BLD-Energy code compliance | 9/3/2014 | 9/4/2014 | 9/4/2014 | A | PART |
Dave Hannah
|
|
|
Brett Phone #: ###-#### ok to cover main level needs to fire block top plates
|
BLD-Energy code compliance | 8/28/2014 | 8/29/2014 | 8/29/2014 | A | PASS |
Phil Shearer
|
|
|
Brett Phone #: ###-####. Fome sealpackage only.
|
BLD-Framing/Rough-in | 8/26/2014 | 8/27/2014 | 8/29/2014 | A | PART |
Dave Hannah
|
|
|
Brett Phone #: ###-#### needs sealpackage fire blocking basement walls also needs to seal up old foundation wall
|
BLD-Foundation | 8/11/2014 | 8/12/2014 | 8/12/2014 | A | PASS |
Dave Hannah
|
|
|
Brett-cmu block wall Phone #: ###-####
|
BLD-Wall Bracing | 8/11/2014 | 8/12/2014 | 8/12/2014 | A | PASS |
Dave Hannah
|
|
|
Brett Phone #: ###-####
|
Routing - MECHANICAL | 8/8/2014 | | 8/8/2014 | | PASS |
Troy James
|
|
|
|
BLD-Foundation | 7/28/2014 | 7/28/2014 | 7/28/2014 | P | PASS |
Phil Shearer
|
|
|
BRETT Phone #: ###-#### CMU wall first 4' north west corner of the basement
|
BLD-Foundation | 7/22/2014 | 7/23/2014 | 7/23/2014 | A | PASS |
Phil Shearer
|
|
|
Brett Phone #: ###-#### Foundation for the garage.
|
BLD-Footing | 7/16/2014 | 7/16/2014 | 7/16/2014 | P | PASS |
Phil Shearer
|
|
|
Tyler Phone #: ###-#### Footings for the garage.
|
BLD-Foundation | 6/23/2014 | 6/23/2014 | 6/23/2014 | P | PASS |
Dave Hannah
|
|
|
Eric Phone #: ###-#### garage
|
BLD-Footing | 6/17/2014 | 6/18/2014 | 6/18/2014 | A | PASS |
Mike Jordan
|
|
|
Eric Phone #: ###-####
|
BLD-Conference | 6/16/2014 | 6/17/2014 | 6/17/2014 | A | DONE |
Mike Jordan
|
|
|
Eric Phone #: ###-####. No one on site, no plans on site. Footing work appeared incomplete. Attempted to call eric, could not leave voice mail, mail box was full. Will need to reschedule. Went back to meet concrete subcontractor. Concerns about condition of existing wall. From engineers details, it appeears that new footing and wall is going to support existing floor. Noted to contractor if he still has concerns, he needs to contact the engineer for further investigation on existing concrete wall.
|
Routing Walk-In (BLD) | 6/12/2014 | 6/12/2014 | 6/12/2014 | P | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/12/2014 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/12/2014 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/12/2014 | | DONE |
Barbara Stitt
|
|
|
|
(F) Reprint permit | | | 6/12/2014 | | DONE |
Barbara Stitt
|
|
|
|
Routing Walk-In (BLD) | 6/11/2014 | 6/11/2014 | 6/11/2014 | P | FAIL |
Javier Guzman
|
|
|
applicant needs to provide stamped and signed engineered calculatrions to match the submitted modified plans of the basement footing
|
OVERRIDE | | | 4/21/2014 | | |
|
|
|
|
Routing Walk-In (Zoning) | 4/21/2014 | 4/21/2014 | 4/21/2014 | P | DONE |
Susan Riggs
|
|
|
|
Routing Walk-In (Zoning) | 4/21/2014 | 4/21/2014 | 4/21/2014 | P | DONE |
Susan Riggs
|
|
|
|
Routing Walk-In (BLD) | 4/21/2014 | 4/21/2014 | 4/21/2014 | P | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 4/21/2014 | 4/21/2014 | 4/21/2014 | | PASS |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 4/21/2014 | | |
|
|
|
|
1st review completed | | | 4/21/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/21/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/21/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Issue PAID IN FULL permit | | | 4/21/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Application received | | 4/21/2014 | | | |
|
|
|
|