Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD14-01034
StatusFinaled
Name ACTION STEEL BUILDERS
Site Address 6619 S SUPPLY WAY
Project NameTreasure Valley Steel Addition
Customer Number 
ePlanReviewYes
Description
Treasure Valley Steel - Storage Addition - Construction of a 40 x 125 x 16 pre-engineered steel building addition for the storage of steel coil, metal fasteners and metal roofing products.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 12/21/20141/2/2015 DONE
PubWorks Occupancy Approval12/11/201412/11/201412/11/2014 DONE
DetailsBrian Murphy
as per Brian Murphy final was done 12-10-14
BLD-Final12/11/201412/11/201412/11/2014ADONE
DetailsJim Storey
as per Jim Storey 301 final passed
Permanent Occupancy  12/11/2014 DONE
BLD-Final12/1/201412/2/201412/2/2014APART
DetailsJim Storey
steve Phone #: ###-#### final ok pending pw
FIRE-Final Inspection12/1/201412/1/201412/1/2014PPASS
DetailsForrest France
Life safety inspection passed.
BLD-Footing9/30/20149/30/20149/30/2014PFAIL
DetailsMike Jordan
Craig Phone #: ###-####. Install reinforcement per approved plans. Bottom reinforcement is required to be epoxied into existing footing and requires special inspection. Noted to contractor if he still wants to place concrete in the a.m. to have special inspector inspect and verify proper construction for column pad footings against existing building.
BLD-Foundation9/10/20149/11/20149/11/2014APASS
DetailsMike Jordan
Craig Phone #: ###-####
BLD-Footing9/8/20149/8/20149/8/2014PPASS
DetailsJim Storey
Craig Phone #: ###-####
OVERRIDE  8/6/2014  
Issue PAID IN FULL permit  8/6/2014 DONE
DetailsChristina Prado
Print Occupancy Form  8/6/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  8/6/2014 DONE
DetailsChristina Prado
Plan assigned to (CDM)6/25/2014 8/1/2014 PASS
DetailsCarl D Madsen
First review completed
Routing Off Site - STRUCTURAL8/1/2014 8/1/2014 PASS
DetailsCarl D Madsen
Passed with conditions for the new front door awning. Redlines added to the plans sheets to provide additional engineering to the field inspector. CDM
Routing - PLAN CHECK8/1/2014 8/1/2014 PASS
DetailsCarl D Madsen
Case Summary (BLD)  8/1/2014 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/1/2014 DONE
Routing Off Site - STRUCTURAL6/25/2014 7/16/2014 FAIL
DetailsCarl D Madsen
Routing - PLAN CHECK6/25/2014 7/16/2014 FAIL
DetailsCarl D Madsen
1st review completed  7/16/2014 FAIL
Routing PW Drainage6/25/2014 7/14/2014 PASS
DetailsBrian Murphy
Routing - PLANNING Land Div6/25/2014 7/1/2014 PASS
DetailsDave Abo
Parcel is a consolidation of two platted lots.
Route to Impact Fee Review6/25/20146/30/20146/30/2014 PASS
DetailsCindy M. Gould
Routing - FIRE6/25/20146/25/20146/30/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review 06-30-14
Routing - PUBLIC WORKS6/25/2014 6/25/2014 PASS
DetailsBeverly Mountain
Routing - Erosion and Sediment6/25/2014 6/25/2014 PASS
DetailsAndy J. Long
ESC site map and narrative submitted and approved. Valid RP and PD provided.
Routing - Design Review6/25/2014 6/25/2014 PASS
DetailsAndrea Tuning
Intake Approval  6/25/2014 PASS
DetailsJason Blais
Intake Approval  4/29/2014 FAIL
DetailsAdele J Schaffeld-Griffin
Prior to beginning the prescreen please re upload the approved documents in accordance with the electronic submittal standards.

All sheet size shall be a minimum of 18"x24".
All drawings shall be uploaded individually with conventional naming. A1.0 Cover Sheet
Please provide the required stamping areas. The cover sheet shall be provided with a blank space 4"x4" located 3" from the right edge in the bottom right corner. The additional drawings shall have a 4"X2" space in the same location as the cover.
The TV Steel Addition R &R Steel Company Calculations needs to be re uploaded to read left to right.
I have uploaded the electronic submittal standars and the ESC document stating additons over 600 sq feet require full ESC narrative and plans.
Please see mark ups on the check list for the additional information and plans needed to begin the pre screen.
Application received  4/26/2014 DONE
Application submitted via PDS Online on Apr 26 2014 7:06PM
Pending Assignment by JCM6/25/2014    
DetailsJohn Menard