Description
(FLORIDA TILE RACKING) Fire sprinklers used for building area increase. To install 16 foot tall steel storage racks (storage 20 foot tall maximum) within an existing 7,500 square foot warehouse located within an existing 10,410 square foot tenant space. This tenant space was created under permit BLD14-00305. Much of the interior tenant improvement work was done under permit BLD07-00535. The means of egress system is required to comply with the Building Code. The racks will be attached to the existing concrete floor using Powers Power-Stud+ SD1 1/2 inch anchors embedded 3.75 inches into the concrete floor. The racks and their installation are required to comply with RMI/ANSI MH 16.1-2008. Two (2) anchors per foot plate are required. Periodic Special Inspection is required during anchor installation. The provisions of ICC Evaluation Report ESR-2818 are required to be followed. The work is required to comply with the approved drawings, with the structural design, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 7/18/20147/22/2014 DONE
First Notice6/4/20146/4/20147/8/2014 DONE
DetailsCandy A. Nichols
Mailed 7-8-14
BLD-Final6/3/20146/4/20146/4/2014PPASS
DetailsMike Jordan
Wade Phone #: ###-####
DOC - Permit Finaled6/4/20146/4/20146/4/2014PPASS
DetailsMike Jordan
FIRE-Final Inspection6/3/20146/4/20146/4/2014APASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection6/2/20146/2/20146/2/2014PPART
DetailsTroy Cobbley
See the city approved plans for the racking that is complete and can be utilized.
BLD-Final5/30/20146/2/20146/2/2014APART
DetailsMike Jordan
Wade-partial so customer can put supplies in Phone #: ###-####
Issue PAID IN FULL permit  5/8/2014 DONE
DetailsChristina Prado
Plan assigned to (CJW)4/29/20144/29/20145/7/2014 PASS
DetailsCarl Westfall
FLORIDA TILE RACKING - Level 2 TI (9 days - May 8)
Application received 4/28/20145/7/2014 DONE
Routing - FIRE5/6/2014 5/7/2014 PASS
DetailsScott Arellano
See Fire Plan Review 05-07-14
1st review completed  5/7/2014 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/7/2014 DONE
Inspection Record Card- Bld  5/7/2014 DONE
DetailsTisha Gallop
Telephone call  5/7/2014 DONE
DetailsChristina Prado
called Wade to advise permit is ready and gave fees due
Permit Ready to Issue  5/7/2014 DONE
DetailsChristina Prado
Routing - PLAN CHECK4/29/2014 5/6/2014 PASS
DetailsCarl Westfall
Pending Assignment by JCB4/29/2014 4/29/2014 DONE
DetailsJason Blais
Intake Approval  4/28/2014 PASS
DetailsJason Blais
Prescreen approved by Adele Schaffeld-Griffin and plan review fees paid.