Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD14-01046
StatusFinaled
Name CLC TRUST
Site Address 5251 S APPLE ST
Project NameALL PURPOSE STORAGE
Customer Number 
ePlanReviewYes
Description
(All Purpose Storage)Parcel owner acting as GC-- RV and Boat Storage Building 'D' - To construct a new 13,800 square foot, one story, pre-engineered metal storage building and related site improvements. This building is typically not continuously occupied and is un-conditioned. This permit is for open storge building 'D' only. Separate building permits are required for the additional buildings. NOTE: This building is not fire sprinklered. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 3/8/20156/9/2015 DONE
Third Notice 2/7/20153/3/2015 DONE
Sent with letter
Third Notice 1/7/20152/2/2015 DONE
Third Notice 12/6/20141/2/2015 DONE
Permanent Occupancy  12/24/2014 DONE
DetailsChristina Prado
Telephone call  12/24/2014 DONE
DetailsSam Zahorka
Spoke with the architect and discussed the occupancy group S-1 being incorrect and that it needs to be an S-2. The architect agreed to get this changed on the plans and the certificate of occupancy. I red-lined the approved plans in project dox and mailed the updated/corrected certificate of occupancy to the owner.
Plan Reviewer's activity  12/23/2014 DONE
DetailsSam Zahorka
Changed the occupancy group to S2 rather than S1. Corrected the occupancy card and mailed to the owner.
Second Notice 11/13/201412/1/2014 DONE
DetailsChristina Prado
First Notice 10/17/201411/3/2014 DONE
Zoning Approval10/7/201410/7/201410/7/2014 DONE
DetailsAndrea Tuning
Print Occupancy Form  10/7/2014 DONE
DetailsTisha Gallop
BLD-Final10/6/201410/6/201410/6/2014PPASS
DetailsJim Storey
Russ Phone #: ###-####
DOC - Permit Finaled10/6/201410/6/201410/6/2014PPASS
DetailsJim Storey
FIRE-Final Inspection10/2/201410/3/201410/3/2014PPASS
DetailsForrest France
Life safety inspection passed. No signature card available on site.
BLD-Foundation8/5/20148/6/20148/6/2014APASS
DetailsPhil Shearer
Russ Phone #: ###-####
Ground rod placed in footing
BLD-Foundation7/23/20147/24/20147/24/2014APASS
DetailsJim Storey
Russ Phone #: ###-####
Print Occupancy Form  7/21/2014 DONE
DetailsTisha Gallop
Inspection Record Card- Bld  7/21/2014 DONE
DetailsTisha Gallop
OVERRIDE  6/2/2014  
Issue PAID IN FULL permit  6/2/2014 DONE
DetailsBarbara Stitt
Permit Ready to Issue  6/2/2014 DONE
DetailsBarbara Stitt
Routing - Design Review5/30/2014 5/30/2014 PASS
DetailsAndrea Tuning
The plans have been redlined to require the bicycle rack to be relocated and all landscaping be installed with Phase I.
Routing - PLAN CHECK5/30/2014 5/30/2014 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  5/30/2014 DONE
DetailsSam Zahorka
Plan assigned to (SRZ)5/2/2014 5/30/2014 PASS
DetailsSam Zahorka
2nd review completed. Corrections requested.
Routing - PLANNING Land Div5/21/2014 5/21/2014 PASS
DetailsDave Abo
Routing - Design Review5/21/2014 5/21/2014 FAIL
DetailsAndrea Tuning
The required landscaping is not shown on the site plan.
Routing - PLAN CHECK5/21/2014 5/21/2014 FAIL
DetailsSam Zahorka
Routing - PLAN CHECK5/2/2014 5/16/2014 FAIL
DetailsSam Zahorka
1st review completed  5/16/2014 DONE
DetailsSam Zahorka
Route to Impact Fee Review5/2/20145/7/20145/9/2014 PASS
DetailsCindy M. Gould
Routing - FIRE5/2/20145/2/20145/8/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review 05-08-14
Routing PW Drainage5/5/2014 5/8/2014 PASS
DetailsBrian Murphy
Routing PW Street Lights5/5/2014 5/7/2014 PASS
DetailsMike D Hedge
No street lighting required for htis project.
Routing - Erosion and Sediment5/2/2014 5/6/2014 PASS
DetailsEvan Jenkins
Routing - PUBLIC WORKS5/2/2014 5/5/2014 PASS
DetailsBeverly Mountain
Plan resubmittals requested  5/2/2014  
DetailsSam Zahorka
E-mailed the architect a requested for revised structural calculatioins and plans, designed using the 2012 IBC. The structural review will not begin until the revised documents have been received. JCM
Pending Assignment by JCM5/2/2014 5/2/2014 DONE
DetailsJohn Menard
Routing - Addressing5/2/2014 5/2/2014 PASS
DetailsEmily Dixon
Routing - Design Review5/2/2014 5/2/2014 FAIL
DetailsAndrea Tuning
Intake Approval  4/29/2014 FAIL
DetailsTim L. Woodard
Tom,

Please reupload sheet S0.02 to be just that one sheet. Correct electrical / civil / ESC and other sheets that do not have the required stamping area in the bottom right hand corner of the plans. The last thing I need is the structural calculations and Plans for the metal building structure.

Best regards,
Tim Woodard
Plans Examiner II
City of Boise
###-####
Application received  4/28/2014 DONE
Application submitted via PDS Online on Apr 28 2014 11:19AM