Third Notice | | 3/8/2015 | 6/9/2015 | | DONE |
|
|
|
|
Third Notice | | 2/7/2015 | 3/3/2015 | | DONE |
|
|
|
Sent with letter
|
Third Notice | | 1/7/2015 | 2/2/2015 | | DONE |
|
|
|
|
Third Notice | | 12/6/2014 | 1/2/2015 | | DONE |
|
|
|
|
Permanent Occupancy | | | 12/24/2014 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 12/24/2014 | | DONE |
Sam Zahorka
|
|
|
Spoke with the architect and discussed the occupancy group S-1 being incorrect and that it needs to be an S-2. The architect agreed to get this changed on the plans and the certificate of occupancy. I red-lined the approved plans in project dox and mailed the updated/corrected certificate of occupancy to the owner.
|
Plan Reviewer's activity | | | 12/23/2014 | | DONE |
Sam Zahorka
|
|
|
Changed the occupancy group to S2 rather than S1. Corrected the occupancy card and mailed to the owner.
|
Second Notice | | 11/13/2014 | 12/1/2014 | | DONE |
Christina Prado
|
|
|
|
First Notice | | 10/17/2014 | 11/3/2014 | | DONE |
|
|
|
|
Zoning Approval | 10/7/2014 | 10/7/2014 | 10/7/2014 | | DONE |
Andrea Tuning
|
|
|
|
Print Occupancy Form | | | 10/7/2014 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 10/6/2014 | 10/6/2014 | 10/6/2014 | P | PASS |
Jim Storey
|
|
|
Russ Phone #: ###-####
|
DOC - Permit Finaled | 10/6/2014 | 10/6/2014 | 10/6/2014 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 10/2/2014 | 10/3/2014 | 10/3/2014 | P | PASS |
Forrest France
|
|
|
Life safety inspection passed. No signature card available on site.
|
BLD-Foundation | 8/5/2014 | 8/6/2014 | 8/6/2014 | A | PASS |
Phil Shearer
|
|
|
Russ Phone #: ###-#### Ground rod placed in footing
|
BLD-Foundation | 7/23/2014 | 7/24/2014 | 7/24/2014 | A | PASS |
Jim Storey
|
|
|
Russ Phone #: ###-####
|
Print Occupancy Form | | | 7/21/2014 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 7/21/2014 | | DONE |
Tisha Gallop
|
|
|
|
OVERRIDE | | | 6/2/2014 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/2/2014 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 6/2/2014 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Design Review | 5/30/2014 | | 5/30/2014 | | PASS |
Andrea Tuning
|
|
|
The plans have been redlined to require the bicycle rack to be relocated and all landscaping be installed with Phase I.
|
Routing - PLAN CHECK | 5/30/2014 | | 5/30/2014 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/30/2014 | | DONE |
Sam Zahorka
|
|
|
|
Plan assigned to (SRZ) | 5/2/2014 | | 5/30/2014 | | PASS |
Sam Zahorka
|
|
|
2nd review completed. Corrections requested.
|
Routing - PLANNING Land Div | 5/21/2014 | | 5/21/2014 | | PASS |
Dave Abo
|
|
|
|
Routing - Design Review | 5/21/2014 | | 5/21/2014 | | FAIL |
Andrea Tuning
|
|
|
The required landscaping is not shown on the site plan.
|
Routing - PLAN CHECK | 5/21/2014 | | 5/21/2014 | | FAIL |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 5/2/2014 | | 5/16/2014 | | FAIL |
Sam Zahorka
|
|
|
|
1st review completed | | | 5/16/2014 | | DONE |
Sam Zahorka
|
|
|
|
Route to Impact Fee Review | 5/2/2014 | 5/7/2014 | 5/9/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - FIRE | 5/2/2014 | 5/2/2014 | 5/8/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review 05-08-14
|
Routing PW Drainage | 5/5/2014 | | 5/8/2014 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Street Lights | 5/5/2014 | | 5/7/2014 | | PASS |
Mike D Hedge
|
|
|
No street lighting required for htis project.
|
Routing - Erosion and Sediment | 5/2/2014 | | 5/6/2014 | | PASS |
Evan Jenkins
|
|
|
|
Routing - PUBLIC WORKS | 5/2/2014 | | 5/5/2014 | | PASS |
Beverly Mountain
|
|
|
|
Plan resubmittals requested | | | 5/2/2014 | | |
Sam Zahorka
|
|
|
E-mailed the architect a requested for revised structural calculatioins and plans, designed using the 2012 IBC. The structural review will not begin until the revised documents have been received. JCM
|
Pending Assignment by JCM | 5/2/2014 | | 5/2/2014 | | DONE |
John Menard
|
|
|
|
Routing - Addressing | 5/2/2014 | | 5/2/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - Design Review | 5/2/2014 | | 5/2/2014 | | FAIL |
Andrea Tuning
|
|
|
|
Intake Approval | | | 4/29/2014 | | FAIL |
Tim L. Woodard
|
|
|
Tom,
Please reupload sheet S0.02 to be just that one sheet. Correct electrical / civil / ESC and other sheets that do not have the required stamping area in the bottom right hand corner of the plans. The last thing I need is the structural calculations and Plans for the metal building structure.
Best regards,
Tim Woodard
Plans Examiner II
City of Boise
###-####
|
Application received | | | 4/28/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 28 2014 11:19AM
|