Permit Information
Permit NumberBLD14-01057
StatusFinaled
Name VAN AUKER CONSTRUCTION
Site Address 8455 W EMERALD ST
Project NamePHARMEASE
Customer Number 
ePlanReviewYes
Description
(PHARMEASE) - To remodel an existing 10,080 square foot office building for a new administrative and long-term care pharmacy tenant. Work to include: Demolition work per plans; construction of new interior partitions to create: new offices, storage rooms, break/delivery room, break room, and conference room; new storefront doors; new door hardware on select doors; modify the existing men's restroom and upgrade for accessibility; new suspended ceiling grid system installed per CISCA guidelines in select locations; relocate existing emergency lights and light switches; new emergency lights and exit signs; new concrete slab at the new entry location; new exterior cast in place concrete retaining wall; new floor finishes in select areas; related interior finishes in compliance with chapter 8 of the 2012 IBC; new reception counter; and electrical, mechanical, and plumbing work. All work shall comply with the approved drawings, the plan review report, and all applicable codes. A new Certificate of Occupancy with the new occupant load total is required to be obtained after all work has been inspected and approved and prior to tenant occupying this space. This builidng is not fire sprinklerd. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 1/7/20151/15/2015 DONE
Third Notice 12/7/20141/2/2015 DONE
Sent with a letter
Third Notice 11/17/201412/2/2014 DONE
Third Notice 10/11/201411/12/2014 DONE
faxed to Van Auker
Second Notice 9/7/201410/6/2014 DONE
DetailsChristina Prado
mailed 10-7-14
First Notice 8/15/20148/28/2014 DONE
BLD-Final8/1/20148/5/20148/5/2014PPASS
DetailsJim Storey
Ron Phone #: ###-####
FIRE-Final Inspection8/5/20148/5/20148/5/2014PPASS
DetailsTroy Cobbley
life safety passed
Permanent Occupancy  8/5/2014 DONE
DetailsTisha Gallop
FIRE-Final Inspection8/1/20148/4/20148/4/2014AFAIL
DetailsTroy Cobbley
Need to repair the emergency light and get a final inspection on the Alarmco fire alarm permit.
FIRE-Supply Line Hydro7/31/20148/1/20148/1/2014ACANC
DetailsTroy Cobbley
Need the project related fire alarm permits finaled, fire extinguishers tagged and exit signs repaired. No life safety inspection was performed.
BLD-Framing/Rough-in6/19/20146/20/20146/20/2014PPASS
DetailsMike Jordan
Ron-please do right after lunch Phone #: ###-####. Interior steel stud walls ok.
BLD-Footing6/13/20146/16/20146/16/2014APASS
DetailsMike Jordan
Ron-mid morning if possible Phone #: ###-####
OVERRIDE  6/12/2014  
Issue PAID IN FULL permit  6/12/2014 DONE
DetailsCandy A. Nichols
Print Occupancy Form  6/12/2014 DONE
DetailsCandy A. Nichols
Permit Ready to Issue  6/12/2014 DONE
DetailsTisha Gallop
Plan assigned to (SRZ)5/9/20145/9/20146/10/2014 PASS
DetailsSam Zahorka
Pending others to PASS.
PLANS/APPL TAKEN TO FRONT DESK  6/10/2014 DONE
DetailsSam Zahorka
Routing - FIRE6/4/20146/4/20146/6/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review Rev 1 06-06-14
Routing - PLAN CHECK6/5/2014 6/5/2014 PASS
DetailsSam Zahorka
Routing - FIRE5/9/20145/9/20146/2/2014 FAIL
DetailsCraig D. Hanson
See Fire Plan Review 06-02-14
1st review completed  6/2/2014 DONE
DetailsSam Zahorka
Routing - PLAN CHECK5/9/2014 5/30/2014 FAIL
DetailsSam Zahorka
Routing - Design Review5/9/2014 5/19/2014 PASS
DetailsJosh Wilson
Ok per CZC14-00154
Plan Reviewer's activity  5/13/2014 DONE
DetailsJason Blais
No ACHD impact fees due and no inspection required per email received from Christy Little of ACHD.
Routing PW Sewer Rating5/12/2014 5/12/2014 PASS
DetailsConnie Baumgartner
Routing - Erosion and Sediment5/9/2014 5/12/2014 PASS
DetailsEvan Jenkins
Routing - Addressing5/9/2014 5/12/2014 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS5/9/2014 5/12/2014 PASS
DetailsBeverly Mountain
Pending Assignment by JCB5/9/2014 5/9/2014 DONE
DetailsJason Blais
Plan Reviewer's activity  5/9/2014 DONE
DetailsJason Blais
Emailed Rob Thornton to have him contact ACHD for any impact fees due. Written verification is required to be provided to our Permit Counter prior to the building permit being issued.
Intake Approval  5/8/2014 PASS
DetailsAdele J Schaffeld-Griffin
Spoke with Sarah. The zoning certificate was submitted 5/7/14 she said to go ahead and approve the pre screen and she would route the review to Josh W.
Intake Approval  5/5/2014 FAIL
DetailsAdele J Schaffeld-Griffin
Rob, based off the floor plan you submitted this is a change in occupancy. The existing occupancy is "B" for office and only a small accessory portion of the floor plan will continue to be offices. Please revise the code analysis to reflect the storage and sales area that is also indicated on the floor plan.
Change in occupancy is a major TI. Please complete and upload the major TI check list and all additional documents required. You do not need to start a new e plan. Once we get the prescreen approved I will have Jason route as a Major.
Just some items I noticed but not a complete list- the stamping areas are not provided on the sheets, you will need at least an ESC waiver letter, you will need at least a zoning certificate but should check with planning as you are doing work on the outside of the building and changing the front door. We will need approval from ACHD at least by the time the permit is ready to issue indicating that there are no additional fee’s or that the fees have been paid or will be paid when the permit is picked up. There may be additional items once you complete the major check list.
Application received  4/28/2014 DONE
Application submitted via PDS Online on Apr 28 2014 2:09PM