BLD-Final | 6/9/2014 | 6/9/2014 | 6/10/2014 | P | NR |
Dave Hannah
|
|
|
Greg Phone #: ###-####
|
BLD-Footing | 5/15/2014 | 5/15/2014 | 5/15/2014 | P | PASS |
Tony Young
|
|
|
Heron Phone #: ###-####,, columns ok
|
PubWorks Subgrade Approval | 5/12/2014 | 5/12/2014 | 5/12/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Plan resubmittals received | | | 5/7/2014 | | DONE |
|
|
|
new heavy timber design approved
|
Routing Walk-In (BLD) | 4/30/2014 | 5/2/2014 | 5/2/2014 | P | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 5/2/2014 | 5/2/2014 | 5/2/2014 | | PASS |
Perry Paine
|
|
|
|
Application received | | 4/30/2014 | 5/2/2014 | | DONE |
|
|
|
|
Routing Walk-In (PW Hillside) | | | 5/2/2014 | A | PASS |
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
1st review completed | | | 5/2/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/2/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/2/2014 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/2/2014 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 5/2/2014 | | DONE |
Tisha Gallop
|
|
|
|
Routing Walk-In (Zoning) | 4/30/2014 | 4/30/2014 | 4/30/2014 | P | PASS |
Colleen T Carroll
|
|
|
|
BLD-Footing | 5/8/2014 | 5/9/2014 | | A | |
Dave Hannah
|
|
|
Heron Phone #: ###-####
|