Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD14-01106
StatusFinaled
Name SUMMIT DEVELOPMENT INC
Site Address 8721 W HACKAMORE DR
Project NameLANDMARK APARTMENTS
Customer Number 
ePlanReviewNo
Description
(Landmark Apartments - BLDG 4) To construct a new 3,668 sq. ft., two story, Four unit, apartment building. Units 'A' have one bedroom, one den, and two bathrooms. Units 'B' have two bedrooms, and two bathrooms. All 4 dwelling units have their own independent exit. All construction per the approved plans, attached plan review report, and all other reviewing agencies approvals. One hour fire-partition separations are required between dwelling units. This building is required to be fire sprinklered. The fire sprinkler system shall be per NFPA 13R as regulated by the fire department. DRH14-00070 & CUP14-00008 Per Planning and Zoning. **SRZ**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Zoning Approval12/31/201412/31/201412/31/2014 PASS
DetailsSarah Schafer
Permanent Occupancy  12/31/2014 DONE
Temporary Occupancy12/29/20143/29/201512/29/2014 DONE
DetailsChristina Prado
BLD-Final12/11/201412/12/201412/12/2014APART
DetailsMike Jordan
Tyler Phone #: ###-####. Temp occ. Will be ok for perm occ. once zoning signs perm.
BLD-Final12/9/201412/10/201412/10/2014PNR
DetailsMike Jordan
Tylor Phone #: ###-####
FIRE-Final Inspection12/9/201412/10/201412/10/2014APASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection12/5/201412/5/201412/5/2014PFAIL
DetailsTroy Cobbley
Not ready for a final yet but I did verify smoke alarms functioned.
BLD-Framing/Rough-in10/16/201410/16/201410/16/2014PPASS
DetailsMike Jordan
BLD-Wall Bracing9/18/20149/18/20149/18/2014PPASS
DetailsMike Jordan
Ken Phone #: ###-####. Floor to floor straps, 1st floor shear walls ok.
BLD-Wall Bracing9/16/20149/17/20149/17/2014ANR
DetailsJim Storey
Ken-exterior shear nailing Phone #: ###-####
BLD-Wall Bracing9/5/20149/8/20149/8/2014APASS
DetailsMike Jordan
Ken-2nd floor Phone #: ###-####
BLD-Other8/20/20148/21/20148/21/2014PPASS
DetailsMike Jordan
Rebar - Ken Phone #: ###-####. INterior thickend footings.
BLD-Foundation8/4/20148/5/20148/5/2014ACANC
DetailsMike Jordan
Ashley Phone #: ###-####
BLD-Energy code compliance8/5/20148/5/20148/5/2014APASS
DetailsMike Jordan
Ashley Phone #: ###-####. Rigid insulation, stemwall under slab on grade.
BLD-Foundation7/31/20148/1/20148/1/2014APASS
DetailsPhil Shearer
Manuel Phone #: ###-####
BLD-Footing7/29/20147/30/20147/30/2014APASS
DetailsPhil Shearer
Jerry Phone #: ###-####
BLD-Footing7/28/20147/29/20147/29/2014PCANC
DetailsPhil Shearer
Jerry Phone #: ###-####
Issue PAID IN FULL permit  7/18/2014 DONE
DetailsTisha Gallop
OVERRIDE  7/17/2014  
Route to Impact Fee Review7/17/20147/22/20147/17/2014 PASS
DetailsJames McMahon
Routing - FIRE7/16/20147/16/20147/17/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review 07-17-14
Plan assigned to (SRZ)5/2/20145/2/20147/17/2014 PASS
DetailsSam Zahorka
Pending others to PASS
Case Summary (BLD)  7/17/2014 DONE
DetailsSam Zahorka
Routing - PLAN CHECK7/17/2014 7/17/2014 PASS
DetailsSam Zahorka
Print Occupancy Form  7/17/2014 DONE
DetailsChristina Prado
Telephone call  7/17/2014 DONE
DetailsChristina Prado
called Darren to advise permit is ready pending GC & RP and gave fees due
Permit Ready to Issue  7/17/2014 DONE
DetailsChristina Prado
PLANS/APPL TAKEN TO FRONT DESK  7/17/2014 DONE
DetailsSam Zahorka
Routing - PLAN CHECK6/26/2014 7/16/2014 PASS
DetailsSam Zahorka
Routed to Fire Review
Routing - FIRE6/24/20146/24/20146/26/2014 FAIL
DetailsCraig D. Hanson
Routing PW Drainage6/18/2014 6/23/2014 PASS
DetailsBrian Murphy
Routing PW Sewer Design6/23/2014 6/23/2014 PASS
DetailsMike Sheppard
Routing - PLAN CHECK6/10/2014 6/18/2014 PEND
DetailsSam Zahorka
Pending others to PASS
Plan resubmittals received  6/18/2014 DONE
DetailsChristina Prado
Received five sets of revised plan sheets marked C1, C2, C3, C4 & C5 as well as one transmittal sheet and one revised Storm Drainage Calcs packet; Plans taken to Sam for review
Routing - PLUMBING5/14/2014 6/18/2014 PASS
DetailsDaryl Spivey
Routing - PLAN CHECK6/3/2014 6/6/2014 PASS
DetailsSam Zahorka
Plan resubmittals received  6/3/2014 DONE
DetailsChristina Prado
Received two revised sets of plans marked G1.0 & G2.0 as well as one response letter; Plans inserted by arch rep and returned to Sam for review
1st review completed  6/3/2014 DONE
DetailsSam Zahorka
Routing - FIRE5/29/2014 6/3/2014 FAIL
DetailsCraig D. Hanson
See Fire Plan Review 06-03-14
Routing - PLAN CHECK  5/29/2014 FAIL
DetailsSam Zahorka
Routing - PLANNING5/16/2014 5/19/2014 PASS
DetailsJosh Wilson
Redline on sheet A1.0- fence required on north and east property lines
Routing - PLANNING5/16/2014 5/19/2014 PASS
Details
Redline on sheet A1.0- fence required on north and east property lines
Routing - Erosion and Sediment5/12/2014 5/14/2014 PASS
DetailsAndy J. Long
ESC site map and narrative submitted and approved. Valid RP and PD designated.
Routing - PUBLIC WORKS5/5/2014 5/12/2014 FAIL
DetailsConnie Baumgartner
Failed by Kyle Rosenmeyer for sewer design and Brian Murphy for drainage issues.
Routing PW Solid Waste  5/12/2014 PASS
DetailsPeter J. McCullough
Routing PW Sewer Design5/6/2014 5/12/2014 FAIL
DetailsKyle S. Rosenmeyer
Contract Note – “Contractor shall contact Boise Public Works 48 hours prior to construction and obtain tap permit for sewer connection.”
Contract Note – “Contractor shall CCTV existing sewer line segments immediately up and downstream of new manhole and submit records to Boise Public Works.”
Please add callout to plan and profile at intersection of the sewer extension and the westerly property line. Reading in effect “End public sewer, begin private sewer”.
Please add to profile callout for MH SW2105A1: “Manhole base shall be precast per SD-501A”
Routing PW Street Lights5/6/2014 5/6/2014 PASS
DetailsMike D Hedge
No street lighting required.
Routing PW Sewer Rating5/6/2014 5/6/2014 PASS
DetailsJennifer Bruner
Routing - Addressing5/2/2014 5/5/2014 PASS
DetailsJason C. Taylor
Pending Assignment by JCM5/2/2014 5/2/2014 DONE
DetailsJohn Menard
Routing - PLANNING Land Div5/2/2014 5/2/2014 PASS
DetailsDave Abo
Application received 5/1/20145/1/2014 DONE
DetailsBarbara Stitt
Intake Approval  5/1/2014 PASS
DetailsSam Zahorka
Plans ACCEPTED BY PLAN TECH  5/1/2014 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  5/1/2014 DONE
DetailsBarbara Stitt
First Notice 1/10/2015   
Zoning Approval Temp12/11/201412/11/2014  PASS
DetailsSarah Schafer
Bond placed for sod.
Routing PW Drainage5/6/2014   FAIL
DetailsBrian McGowan
Routing - PUBLIC WORKS6/18/2014    
DetailsConnie Baumgartner
Resubmittals not inserted into set yet.