Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD14-01126
StatusFinaled
Name CROCKER BUILDING CO
Site Address 2235 N PLEASANT HILL WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI Zone A, Class a Roof, Permit for the construction of a new 3487 sq. ft. two story with basement (first story 1856 sq. ft., second story 1631, unfinished basement is 675 sq. ft.) with 4 bedrooms, 3 1/2 bathrooms, approximately 3122 sq. ft. of covered patio/porch and a 2000 sq. ft. detached garage. All work to be done per the approved plans, plan review report and any notations. A letter from the applicant's geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. A-1 zoning and setbacks per planning. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/16/20153/17/20153/17/2015APASS
DetailsTony Young
Phone #: 2088506700 >> Inspection requested via mobile web by Chad crocker
DOC - Permit Finaled3/17/20153/17/20153/17/2015PPASS
DetailsTony Young
c of o issued
BLD-Final3/16/20153/16/20153/16/2015PPASS
DetailsTony Young
Phone #: 2088506700 >> Inspection requested via mobile web by Chad crocker
PubWorks Occupancy Approval3/16/20153/16/20153/16/2015 DONE
DetailsBrian Murphy
BLD-Grading Inspection3/11/20153/12/20153/12/2015APEND
DetailsTony Young
Chad Phone #: ###-####
BLD-Conference12/11/201412/11/201412/11/2014PPASS
DetailsTony Young
Chad Phone #: ###-####,, soffit can light protection
BLD-Framing/Rough-in11/7/201411/10/201411/10/2014APASS
DetailsJim Sly
Chad Phone #: ###-####
BLD-Framing/Rough-in11/6/201411/7/201411/7/2014APART
DetailsTony Young
Chad Phone #: ###-####,, need to redo shear per plan,, need sprinkler full pass (they are ok with wall insulation), other minor corrections, straps on plates, etc,, went over these with framer,, ok to insulate walls if needed
Plan Modification Accepted  10/1/2014 DONE
new manual j report
Routing - MECHANICAL10/1/2014 10/1/2014 PASS
DetailsTroy James
resubmitted manual j report
BLD-Foundation7/15/20147/16/20147/16/2014APASS
DetailsPhil Shearer
Ryan Phone #: ###-####
BLD-Footing7/8/20147/9/20147/9/2014APASS
DetailsTony Young
Ryan Phone #: ###-####
PubWorks Subgrade Approval7/9/20147/9/20147/9/2014 DONE
DetailsJason C. Taylor
*ALL FOOTINGS* A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
BLD-Footing7/8/20147/8/20147/8/2014PNR
DetailsTony Young
Ryan Phone #: ###-####,, need soils report 1st
BLD-Other6/17/20146/18/20146/18/2014PPART
DetailsTony Young
basement rebar - Ryan Phone #: ###-####
BLD-Footing6/11/20146/12/20146/12/2014APART
DetailsTony Young
the approved plans are in the outhouse if no one is there // Ryan Phone #: ###-####,, basement ftgs ok
PubWorks Subgrade Approval6/12/20146/12/20146/12/2014 DONE
DetailsJason C. Taylor
*BASEMENT FOOTINGS ONLY**A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  5/28/2014 DONE
DetailsChristina Prado
OVERRIDE  5/27/2014  
Plan assigned to (JG)5/6/20145/6/20145/27/2014 PASS
DetailsJavier Guzman
1st review completed, Due 5/22 TH L2 Hillside**
Application received 5/2/20145/27/2014 DONE
Telephone call  5/27/2014 DONE
DetailsTisha Gallop
called Chad and left vm permit is ready and fee due.
Routing - PLAN CHECK5/21/2014 5/27/2014 PASS
DetailsJavier Guzman
Case Summary (BLD)  5/27/2014 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  5/27/2014 DONE
Inspection Record Card- Bld  5/27/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  5/27/2014 DONE
DetailsTisha Gallop
Routing - FIRE5/23/20145/23/20145/23/2014 PASS
DetailsScott Arellano
Approved. Attached plan review report to Tidemark case.
Telephone call  5/23/2014 DONE
DetailsJavier Guzman
spoke with Jake the engineer about items needed and for clarification/location of beams called on plans
Telephone call  5/21/2014 DONE
DetailsJavier Guzman
Jake an engineer called regarding engineering that was not sent to me which is why the 2nd plan review failed.
Routing PW Grading-Hillside5/21/2014 5/21/2014 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Plan resubmittals received  5/21/2014 DONE
DetailsChristina Prado
received two sets of revised plans sheets marked S, 1, 2, 3, 4, 5, 6, 7, 8 & 9. Various shets are duplicates showing only the engineers stamp as the change;Plans taken back to Javier for further review
Routing - PLAN CHECK5/21/2014 5/21/2014 FAIL
DetailsJavier Guzman
some items on review report not addressed
1st review completed  5/16/2014 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK  5/16/2014 FAIL
DetailsJavier Guzman
sent review report to applicant
Routing - FIRE5/12/2014 5/14/2014 FAIL
DetailsScott Arellano
Emailed applicant Fire Code comments with correction items. Attached plan review report to case.
Routing - MECHANICAL5/12/2014 5/12/2014 PASS
DetailsTroy James
Routing - MECHANICAL5/6/2014 5/12/2014 FAIL
DetailsTroy James
emailed correction to teds heating
Routing - Erosion and Sediment5/12/2014 5/12/2014 PASS
DetailsAndy J. Long
ESC site map and narrative submitted. Valid PD and RP designated. Approved. Site prep inspection required.
Route to Impact Fee Review5/5/20145/8/20145/9/2014 PASS
DetailsCindy M. Gould
Route to Impact Fee Review5/2/20145/7/20145/9/2014 PASS
DetailsCindy M. Gould
Routing - Addressing5/5/2014 5/6/2014 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS5/6/2014 5/6/2014 PASS
DetailsJennifer Bruner
Routing - PLANNING5/6/2014 5/6/2014 PASS
DetailsDavid Moser
Approval as redlined, move interior garage wall back one foot to provide 20 foot deep parking space and remove shower in garage as noted. Ok as per CFH14-00020 and CZC14-00137
Routing PW Grading-Hillside  5/6/2014 FAIL
DetailsJason C. Taylor
Need copies of the Geotechnical Report submitted for approval. Jason Taylor ###-####.
Plan resubmittals received  5/6/2014 DONE
DetailsTisha Gallop
received two copies of Geotech report; put with plans currently in planning
Plans ACCEPTED BY PLAN TECH  5/5/2014 DONE
DetailsCandy A. Nichols
Override - Parcel Holds  5/5/2014  
Recd Pcfee & Taken To Pln CK  5/5/2014  
DetailsCandy A. Nichols
today is the 10th day after City Zoning Ordinance
Intake Approval  5/5/2014 PASS
DetailsCandy A. Nichols