BLD-Final | 10/30/2014 | 10/31/2014 | 10/31/2014 | P | PASS |
Dave Hannah
|
|
|
Hey Jim...Robert....call me when your heading over....###-####. Phone #: ###-#### Inspection requested via web by robert campbell
|
FIRE-Final Inspection | 10/30/2014 | 10/31/2014 | 10/31/2014 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Permanent Occupancy | | | 10/31/2014 | | DONE |
|
|
|
|
PubWorks Occupancy Approval | 10/30/2014 | 10/30/2014 | 10/30/2014 | | DONE |
Brian Murphy
|
|
|
|
Zoning Approval | 10/30/2014 | 10/30/2014 | 10/30/2014 | | PASS |
Josh Wilson
|
|
|
|
BLD-Conference | 10/23/2014 | 10/23/2014 | 10/23/2014 | A | PASS |
Jim Sly
|
|
|
Hey Jim....I need to meet out at my job I need to go over a few things with you. I have a issue that came up and need to show you out at job...call me when your heading over....####-####. Phone #: ###-#### Inspection requested via web by robert campbell Interior Shear.........OK.
|
BLD-Energy code compliance | 9/3/2014 | 9/4/2014 | 9/4/2014 | P | PASS |
Jim Sly
|
|
|
Hey Jim call me when your headed over to go over it with you....thanks Robert ###-####. Make it a later afternoon inspection if you could. Phone #: ###-#### Inspection requested via web by robert campbell
|
BLD-Framing/Rough-in | 9/3/2014 | 9/3/2014 | 9/3/2014 | P | PASS |
Jim Sly
|
|
|
Hey Jim, can you give me a call when your heading over there to do the inspection. I would like to meet you there.....Robert - ###-####. Phone #: ###-#### Inspection requested via web by robert campbell
|
BLD-Conference | 8/13/2014 | 8/13/2014 | 8/13/2014 | A | DONE |
Jim Sly
|
|
|
Hey Jim,
Can you call me when your on your way over thete. I''m just will probably be on other jobs....call me at ###-####. ..thanks Phone #: ###-#### Inspection requested via web by robert campbell
|
BLD-Wall Bracing | 8/12/2014 | 8/12/2014 | 8/12/2014 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by robert campbell
|
BLD-Foundation | 7/9/2014 | 7/10/2014 | 7/10/2014 | P | PASS |
Jim Sly
|
|
|
Jerry Phone #: ###-####
|
BLD-Footing | 7/7/2014 | 7/8/2014 | 7/8/2014 | P | PASS |
Jim Sly
|
|
|
Wes Phone #: ###-####
|
Issue PAID IN FULL permit | | | 7/2/2014 | | DONE |
Christina Prado
|
|
|
|
(F) Reprint permit | | | 7/2/2014 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 6/11/2014 | | |
|
|
|
|
Telephone call | | | 6/11/2014 | | DONE |
Tisha Gallop
|
|
|
called Robert and told him permit fees, need ACHD and GC form signed when he picks up permit.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/11/2014 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/11/2014 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 6/11/2014 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (CDM) | 5/6/2014 | | 6/11/2014 | | PASS |
Carl D Madsen
|
|
|
First review completed
|
Routing - FIRE | 6/9/2014 | 6/9/2014 | 6/10/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review 06-10-14
|
Case Summary (BLD) | | | 6/9/2014 | | DONE |
|
|
|
|
1st review completed | | | 6/9/2014 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 6/3/2014 | | 6/9/2014 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 5/7/2014 | | 6/9/2014 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLANNING Land Div | 5/6/2014 | | 6/9/2014 | | PASS |
Sue Cummings
|
|
|
|
Routing - PLUMBING | 6/3/2014 | | 6/5/2014 | | PASS |
Bill VanDegrift
|
|
|
routed plans to plumbing per resubs received per plans and ISPC
|
Route to Impact Fee Review | 5/30/2014 | 6/4/2014 | 6/3/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - FIRE | 5/30/2014 | 5/30/2013 | 6/3/2014 | | FAIL |
Craig D. Hanson
|
|
|
See Fire Plan Review 06-03-14
|
Case Summary (BLD) | | | 6/3/2014 | | DONE |
Christina Prado
|
|
|
|
Plan resubmittals received | | | 6/3/2014 | | DONE |
Tisha Gallop
|
|
|
received two copies of plan sheets A3.0B & A1.0; inserted by permit tech. and taken back to CDM
|
Routing - MECHANICAL | 6/3/2014 | | 6/3/2014 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 5/21/2014 | | 5/27/2014 | | FAIL |
Troy James
|
|
|
emailed correction to robert campbell
|
Routing - PLUMBING | | | 5/21/2014 | | FAIL |
|
|
|
1) provide a second plumbing design with architect stamp
2) provide civil plan showing size and location of sewer and water services, if a single service is provided show required backflow protection inside the building.
|
Routing - Erosion and Sediment | 5/19/2014 | | 5/20/2014 | | PASS |
Andy J. Long
|
|
|
ESC narrative and site map approved. Valid PD and RP designated.
|
Routing - PUBLIC WORKS | | | 5/19/2014 | | PASS |
|
|
|
|
Routing PW Solid Waste | 5/16/2014 | | 5/19/2014 | | PASS |
Pam Baldwin
|
|
|
|
Routing PW Drainage | | | 5/15/2014 | | PASS |
Brian Murphy
|
|
|
ROOF TO GUTTER STORMWATER TO THE FRONT
|
Routing PW Sewer Design | 5/15/2014 | | 5/15/2014 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Street Lights | 5/8/2014 | | 5/9/2014 | | PASS |
Mike D Hedge
|
|
|
No street lighting required for this project.
|
Routing PW Sewer Rating | 5/7/2014 | | 5/8/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Addressing | | | 5/7/2014 | | PASS |
|
|
|
Apartment addresses have been uploaded to documents.
|
Routing - PLANNING | 5/6/2014 | | 5/7/2014 | | PASS |
Josh Wilson
|
|
|
drh14-94 Josh W.
|
Application received | | 5/5/2014 | 5/6/2014 | | DONE |
|
|
|
|
Intake Approval | | | 5/5/2014 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/5/2014 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/5/2014 | | DONE |
Tisha Gallop
|
|
|
|
First Notice | | 11/10/2014 | | | |
|
|
|
|
Pending Assignment by JCM | 5/6/2014 | | | | |
John Menard
|
|
|
|