BLD-Final | 2/17/2015 | 2/18/2015 | 2/18/2015 | A | PASS |
Phil Shearer
|
|
|
Chris Phone #: ###-####
|
DOC - Permit Finaled | 2/18/2015 | 2/18/2015 | 2/18/2015 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Final | 1/20/2015 | 1/21/2015 | 1/21/2015 | P | PART |
Phil Shearer
|
|
|
Chris Phone #: ###-#### Need to finish deck access to deck is blocked. OK for TCO
|
BLD-Other | 12/11/2014 | 12/11/2014 | 12/11/2014 | P | PASS |
Dave Hannah
|
|
|
Chris// soffit insp Phone #: ###-####
|
BLD-Wall Bracing | 11/4/2014 | 11/5/2014 | 11/5/2014 | A | PASS |
Phil Shearer
|
|
|
Chris Phone #: ###-####
|
BLD-Wall Bracing | 10/31/2014 | 10/31/2014 | 10/31/2014 | P | PASS |
Phil Shearer
|
|
|
Chris Phone #: ###-####. Interior shear wall
|
BLD-Energy code compliance | 10/30/2014 | 10/30/2014 | 10/30/2014 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Energy code compliance | 10/29/2014 | 10/30/2014 | 10/30/2014 | A | PART |
Phil Shearer
|
|
|
Chris Phone #: ###-####
|
BLD-Energy code compliance | 10/28/2014 | 10/29/2014 | 10/29/2014 | A | PART |
Phil Shearer
|
|
|
partial for basement only // Chris Phone #: ###-####
|
BLD-Framing/Rough-in | 10/27/2014 | 10/28/2014 | 10/28/2014 | A | PASS |
Phil Shearer
|
|
|
Chris Phone #: ###-####
|
BLD-Wall Bracing | 10/28/2014 | 10/28/2014 | 10/28/2014 | P | PASS |
Phil Shearer
|
|
|
Chris Phone #: ###-####
|
BLD-Framing/Rough-in | 10/24/2014 | 10/27/2014 | 10/27/2014 | P | NR |
Phil Shearer
|
|
|
Chris Phone #: ###-####
|
BLD-Wall Bracing | 10/27/2014 | 10/27/2014 | 10/27/2014 | P | FAIL |
Phil Shearer
|
|
|
Chris Phone #: ###-####. Missing straps on portal frame, need galvanized nails in seal plate, missing bloking on shear panels.
|
BLD-Framing/Rough-in | 10/23/2014 | 10/24/2014 | 10/24/2014 | A | NR |
Phil Shearer
|
|
|
Chris Phone #: ###-####
|
PubWorks Subgrade Approval | 9/2/2014 | 9/2/2014 | 9/2/2014 | | DONE |
Jason C. Taylor
|
|
|
*INTERIOR PIERS **A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Foundation | 8/18/2014 | 8/19/2014 | 8/19/2014 | A | PASS |
Phil Shearer
|
|
|
wants to pour at 11:30 // Alvaro Phone #: ###-####
|
BLD-Footing | 8/8/2014 | 8/8/2014 | 8/8/2014 | P | PASS |
Phil Shearer
|
|
|
Alvaro Phone #: ###-####
|
PubWorks Subgrade Approval | 8/6/2014 | 8/6/2014 | 8/6/2014 | | DONE |
Jason C. Taylor
|
|
|
*STRIP FOOTINGS ONLY - NO PIERS***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 7/30/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 7/30/2014 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 6/26/2014 | | |
|
|
|
|
Plan assigned to (JG) | 6/3/2014 | 6/3/2014 | 6/26/2014 | | PASS |
Javier Guzman
|
|
|
1st review completed, Pending planning, Due 6/20 F L2 Hillside ePlan*
|
Routing - PLAN CHECK | 6/20/2014 | | 6/26/2014 | | PASS |
Javier Guzman
|
|
|
|
Routing - PLANNING | 6/26/2014 | | 6/26/2014 | | PASS |
Leon Letson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/26/2014 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 6/26/2014 | | |
|
|
|
|
Permit Ready to Issue | | | 6/26/2014 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/16/2014 | | 6/20/2014 | | FAIL |
Javier Guzman
|
|
|
Various items from previous review not addressed
|
Routing - PLAN CHECK | 6/3/2014 | | 6/16/2014 | | FAIL |
Javier Guzman
|
|
|
ePlan review
|
1st review completed | | | 6/16/2014 | | DONE |
Javier Guzman
|
|
|
ePlan
|
Routing - PLANNING | 6/10/2014 | | 6/10/2014 | | FAIL |
Leon Letson
|
|
|
Issues with eaves projecting into setbacks and driveway widths and landscape buffering.
|
Routing - FIRE | 6/3/2014 | 6/3/2014 | 6/6/2014 | | PASS |
Scott Arellano
|
|
|
Approved. The structure has been evaluated for Fire Department vehicle access.
|
Routing PW Grading-Hillside | 6/3/2014 | | 6/4/2014 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PLANNING | 6/3/2014 | | 6/4/2014 | | FAIL |
Leon Letson
|
|
|
There are some issues with the setbacks for the proposed deck at the rear of the project. To meet code, the edge of this deck (and all support columns) can be no closer than 15’ to the rear property line. The associated unroofed stairs with railing, can project up to 6’ into this rear yard setback. You can shift the house (measured from the wall)to within 15’ of Stone Point Dr., but the deck at the rear may still need to be slightly reduced in size to meet setbacks. Also, you will need to submit a revised site plan and grading plan showing these corrections.
|
Routing - PUBLIC WORKS | 6/3/2014 | | 6/4/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Erosion and Sediment | 6/3/2014 | | 6/4/2014 | | PASS |
Evan Jenkins
|
|
|
|
Routing - Addressing | 6/3/2014 | | 6/3/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - MECHANICAL | 6/3/2014 | | 6/3/2014 | | PASS |
Troy James
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/3/2014 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 6/3/2014 | | PASS |
Christina Prado
|
|
|
|
Override - Parcel Holds | | | 6/3/2014 | | |
|
|
|
|
Override - Parcel Holds | | | 6/3/2014 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/3/2014 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 5/28/2014 | | FAIL |
Christina Prado
|
|
|
Need wall bracing, foundation & basement plan stamped by engineer & roof details
|
Application received | | | 5/6/2014 | | DONE |
|
|
|
Application submitted via PDS Online on May 6 2014 11:57AM
|