Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD14-01196
StatusFinaled
Name ESI
Site Address 650 N ARMSTRONG PL
Project NameWinCo Foods Space Management
Customer Number 
ePlanReviewYes
Description
(WINCO) Permit for tenant improvement of the relocated Space Management deptartment 2,937 sq feet of a 73,0030 sq foot existing building. Approval contingent upon adhering to the approved plans on file. Minor demolition per approved plans. Scope of work to include interior nonbearing noncombustible full height and partial height walls, reconfigure existing cubicle layout into new layout. Relocated mechanical and electrical per approved plans. Interior finish shall be per Chapter 8 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **AJS***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 9/5/20149/9/2014 DONE
DetailsChristina Prado
completed 9-9-14
First Notice7/10/20147/10/20148/26/2014 DONE
DetailsMike Jordan
BLD-Final7/9/20147/10/20147/10/2014APASS
DetailsMike Jordan
###-####-Cody
DOC - Permit Finaled7/10/20147/10/20147/10/2014PPASS
DetailsMike Jordan
FIRE-Final Inspection7/9/20147/10/20147/10/2014APASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection7/2/20147/3/20147/3/2014AFAIL
DetailsTroy Cobbley
Two pendant heads and one strobe are overspace due to walls being removed. Separate permits will be required for this work. Craig Phone #: ###-####
BLD-Final7/2/20147/3/20147/3/2014ANR
DetailsMike Jordan
Craig Phone #: ###-####. Fire/life/safety failed.
BLD-Final7/1/20147/2/20147/2/2014PNR
DetailsMike Jordan
late pm please // Craig Phone #: ###-####. Needs fire/life/safety first.
BLD-Framing/Rough-in6/25/20146/25/20146/25/2014PPASS
DetailsMike Jordan
Ceiling grid inspection please The very west side of building and just come in that door--Craig Phone #: ###-####
Issue PAID IN FULL permit  5/20/2014 DONE
DetailsChristina Prado
Inspection Record Card- Bld  5/20/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  5/19/2014 DONE
DetailsTisha Gallop
Plan assigned to (AJS)5/8/20145/8/20145/16/2014 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed Due 5/14 WINCO TI
Routing - PLAN CHECK5/16/2014 5/16/2014 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  5/16/2014 DONE
Routing - PLAN CHECK5/8/2014 5/13/2014 FAIL
DetailsAdele J Schaffeld-Griffin
1st review completed  5/13/2014 FAIL
DetailsAdele J Schaffeld-Griffin
Intake Approval  5/8/2014 PASS
DetailsAdele J Schaffeld-Griffin
Application received  5/7/2014 DONE
Application submitted via PDS Online on May 7 2014 4:33PM