BLD-Final | 9/6/2017 | 9/7/2017 | 9/7/2017 | P | DONE |
Tony Young
|
|
|
Nathan Phone #: ###-####-please call when on way
|
DOC - Permit Finaled | 9/7/2017 | 9/7/2017 | 9/7/2017 | P | PASS |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 7/7/2014 | 7/8/2014 | 7/8/2014 | A | PASS |
Tony Young
|
|
|
Nathan (electrical has passed r/i, please call if you are going to site) Phone #: ###-####
|
Routing Walk-In (BLD) | 7/7/2014 | 7/7/2014 | 7/7/2014 | P | PASS |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 7/7/2014 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/7/2014 | | |
|
|
|
|
BLD-Framing/Rough-in | 7/1/2014 | 7/1/2014 | 7/1/2014 | P | PART |
Tony Young
|
|
|
Nathan Phone #: ###-####,, front door frame ok pending addition to building permit to add doors, windows, and bay windows
|
BLD-Footing | 5/14/2014 | 5/15/2014 | 5/15/2014 | A | PART |
Tony Young
|
|
|
Nathan--Please call prior to inspection Phone #: ###-####,, deck ftgs ok after widening out to 18" per plan
|
PubWorks Subgrade Approval | 5/15/2014 | 5/15/2014 | 5/15/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Application received | | 5/8/2014 | 5/8/2014 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 5/8/2014 | 5/8/2014 | 5/8/2014 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 5/8/2014 | 5/8/2014 | 5/8/2014 | P | DONE |
Jason C. Taylor
|
|
|
|
Plan assigned to (PEP) | 5/8/2014 | 5/8/2014 | 5/8/2014 | | PASS |
Perry Paine
|
|
|
|
Routing Walk-In (PW Hillside) | 5/8/2014 | 5/8/2014 | 5/8/2014 | P | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Inspection Record Card- Bld | | | 5/8/2014 | | |
|
|
|
|
1st review completed | | | 5/8/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/8/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/8/2014 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 5/8/2014 | | DONE |
Tisha Gallop
|
|
|
|