Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD14-01211
StatusFinaled
Name BARRY NATHAN
Site Address 3300 N BOGUS BASIN RD
Project Name 
Customer Number 
ePlanReviewNo
Description
+++7-7-2014 THIS PROJECT IS TO REFLECT THE INSTALLATION OF 2-BAY WINDOWS. 1 IN THE LIVING ROOM AND 1 IN THE MASTER. pep 7-7-2014+++***WUI NOT REQUIRED DUE TO THE PROJECT PLACEMENT*** This project is for the construction of a new 330s.f. above grade wooden deck structure with foothills required foundation engineering. R-1C okper Sue Cummings. A letter from the applicant’s geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946. The project will also include the remodel of the master bathroom area. All per the approved plans as marked and the engineered details and the plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/6/20179/7/20179/7/2017PDONE
DetailsTony Young
Nathan Phone #: ###-####-please call when on way
DOC - Permit Finaled9/7/20179/7/20179/7/2017PPASS
DetailsTony Young
BLD-Framing/Rough-in7/7/20147/8/20147/8/2014APASS
DetailsTony Young
Nathan (electrical has passed r/i, please call if you are going to site) Phone #: ###-####
Routing Walk-In (BLD)7/7/20147/7/20147/7/2014PPASS
DetailsPerry Paine
Case Summary (BLD)  7/7/2014  
Inspection Record Card- Bld  7/7/2014  
BLD-Framing/Rough-in7/1/20147/1/20147/1/2014PPART
DetailsTony Young
Nathan Phone #: ###-####,, front door frame ok pending addition to building permit to add doors, windows, and bay windows
BLD-Footing5/14/20145/15/20145/15/2014APART
DetailsTony Young
Nathan--Please call prior to inspection Phone #: ###-####,, deck ftgs ok after widening out to 18" per plan
PubWorks Subgrade Approval5/15/20145/15/20145/15/2014 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Application received 5/8/20145/8/2014 DONE
Routing Walk-In (Zoning)5/8/20145/8/20145/8/2014PDONE
DetailsSue Cummings
Routing Walk-In (BLD)5/8/20145/8/20145/8/2014PDONE
DetailsJason C. Taylor
Plan assigned to (PEP)5/8/20145/8/20145/8/2014 PASS
DetailsPerry Paine
Routing Walk-In (PW Hillside)5/8/20145/8/20145/8/2014PPASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Inspection Record Card- Bld  5/8/2014  
1st review completed  5/8/2014 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/8/2014 DONE
Permit Ready to Issue  5/8/2014 DONE
DetailsTisha Gallop
Issue PAID IN FULL permit  5/8/2014 DONE
DetailsTisha Gallop