Third Notice | | 1/10/2015 | 1/13/2015 | | DONE |
|
|
|
This permit finaled on the web by Jeremy Amar
|
Second Notice | | 12/11/2014 | 1/5/2015 | | DONE |
Candy A. Nichols
|
|
|
sent in mail 1/5/15
|
First Notice | | 10/17/2014 | 12/1/2014 | | DONE |
|
|
|
|
Permanent Occupancy | | | 10/7/2014 | | DONE |
|
|
|
|
Permanent Occupancy | | | 10/3/2014 | | DONE |
Tisha Gallop
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/3/2014 | | DONE |
Tisha Gallop
|
|
|
c of o issued in error, still need mechanical sign off
|
BLD-Final | 10/1/2014 | 10/2/2014 | 10/2/2014 | A | PASS |
Mike Jordan
|
|
|
Pat Phone #: ###-####. All issues have been resolved. Ok for perm occ.
|
Zoning Approval | 10/1/2014 | 10/1/2014 | 10/1/2014 | | PASS |
Josh Wilson
|
|
|
|
BLD-Final | 9/11/2014 | 9/12/2014 | 9/12/2014 | P | FAIL |
Mike Jordan
|
|
|
Pat Phone #: ###-####. needs plumbing final. Also needs to provide ADA restroomsign and post, remount the vertical grab bar to 39 -41 inces from floor, remount mirror so that reflective surface is 40 inches max above floor.
|
FIRE-Final Inspection | 9/11/2014 | 9/12/2014 | 9/12/2014 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Energy code compliance | 7/29/2014 | 7/30/2014 | 7/30/2014 | A | PASS |
Jim Sly
|
|
|
Pat Phone #: ###-####
|
BLD-Framing/Rough-in | 7/29/2014 | 7/30/2014 | 7/30/2014 | A | PASS |
Jim Sly
|
|
|
Pat Phone #: ###-####
|
BLD-Framing/Rough-in | 7/25/2014 | 7/25/2014 | 7/25/2014 | P | FAIL |
Mike Jordan
|
|
|
Pat Phone #: ###-####. Install the required Cs 16 straps at post to beam connections, Block all panel edges at shear wall and nail off as per schedule. Tighten hold daowns.. correction notice issued. ok to insulate.
|
Print Occupancy Form | | | 6/19/2014 | | DONE |
Christina Prado
|
|
|
|
BLD-Foundation | 6/16/2014 | 6/17/2014 | 6/17/2014 | A | PASS |
Tom Arcoraci
|
|
|
John Phone #: ###-####
|
BLD-Footing | 6/13/2014 | 6/16/2014 | 6/16/2014 | P | PASS |
Mike Jordan
|
|
|
Ryan Phone #: ###-####
|
Issue PAID IN FULL permit | | | 6/11/2014 | | DONE |
Tisha Gallop
|
|
|
|
Print Occupancy Form | | | 6/11/2014 | | DONE |
Tisha Gallop
|
|
|
|
OVERRIDE | | | 6/10/2014 | | |
|
|
|
|
Permit Ready to Issue | | | 6/10/2014 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (SRZ) | 5/14/2014 | | 6/3/2014 | | PASS |
Sam Zahorka
|
|
|
|
Routing - PLANNING Land Div | 5/14/2014 | | 6/3/2014 | | PASS |
Todd Tucker
|
|
|
Tod passed in ePlan Review
|
Routing - PLAN CHECK | 5/14/2014 | | 6/3/2014 | | PASS |
Sam Zahorka
|
|
|
|
Routing PW Solid Waste | 5/14/2014 | | 6/3/2014 | | PASS |
Peter J. McCullough
|
|
|
Peter Passes in ePlanReview
|
1st review completed | | | 6/3/2014 | | DONE |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/3/2014 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLANNING | 5/14/2014 | | 5/23/2014 | | PASS |
Joshua Johnson
|
|
|
|
Routing PW Drainage | 5/14/2014 | | 5/22/2014 | | PASS |
Brian Murphy
|
|
|
|
Routing - FIRE | 5/14/2014 | 5/14/2014 | 5/21/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review 05-21-14
|
Routing - Design Review | 5/14/2014 | | 5/16/2014 | | PASS |
Josh Wilson
|
|
|
|
Route to Impact Fee Review | 5/14/2014 | 5/19/2014 | 5/15/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLUMBING | 5/14/2014 | | 5/14/2014 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing PW Sewer Rating | 5/14/2014 | | 5/14/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Pending Assignment by JCM | 5/14/2014 | | 5/14/2014 | | DONE |
John Menard
|
|
|
|
Routing - Addressing | 5/14/2014 | | 5/14/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 5/14/2014 | | 5/14/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Erosion and Sediment | 5/14/2014 | | 5/14/2014 | | PASS |
Evan Jenkins
|
|
|
Contractor/Developer to add these Updated Site Maps in current SWPPP that is in the Field/Onsite
|
Application received | | | 5/9/2014 | | DONE |
|
|
|
Application submitted via PDS Online on May 9 2014 2:19PM
|