Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD14-01241
StatusFinaled
Name BILTMORE COMPANY
Site Address 6680 W IRVING ST
Project Name6680 w Irving Bldg 5
Customer Number 
ePlanReviewYes
Description
L9B2 - 6680 Irving - (Bldg 5) To construct a new 3,800 sq. ft., two story, Four unit, apartment building. Each unit has two bedrooms, and two bathrooms. The 1st story units are required to be Type 'B' units. All units share a common path of egress into and through a 1-hour rated exit corridor with 20 minute fire-resistive, listed, labeled, self-closing door assemblies from the dwelling units into the corridor. All construction per the approved plans, attached plan review report, and all other reviewing agencies approvals. One hour fire-partitions and one hour horizontal assemblies are required between dwelling units. This building is required to be fire sprinklered. The fire sprinkler system shall be per NFPA 13R as regulated by the fire department. DRH13-00276 & CUP13-00017 Per Planning and Zoning. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 11/14/20147/2/2015 DONE
This permit finaled on the web by Jeremy Amar
BLD-Final11/3/201411/4/201411/4/2014PPASS
DetailsMike Jordan
Pat Phone #: ###-####
FIRE-Final Inspection11/3/201411/4/201411/4/2014APASS
DetailsTroy Cobbley
life safety passed
Permanent Occupancy  11/4/2014 DONE
FIRE-Final Inspection10/31/201411/3/201411/3/2014PCANC
DetailsTroy Cobbley
The project related fire alarm and fire sprinkler permits are not ready.
FIRE-Final Inspection10/30/201410/31/201410/31/2014PCANC
DetailsTroy Cobbley
Cancel per Pat Phone #: ###-####
Zoning Approval10/31/201410/31/201410/31/2014 PASS
DetailsJosh Wilson
BLD-Other9/26/20149/29/20149/29/2014APASS
DetailsMike Jordan
Pat-RC1 channel Phone #: ###-####
BLD-Energy code compliance9/26/20149/26/20149/26/2014PPASS
DetailsJim Sly
Pat Phone #: ###-####
BLD-Framing/Rough-in9/23/20149/24/20149/24/2014AFAIL
DetailsMike Jordan
Pat Phone #: ###-####. Repair holes in draft stop, Add lateral bracing to top chords of trusses at over build, Roll block trusses with 2ft. truss heels. strap top plates at line set and dryer vents. Correction notice issued. Ok to insulate.
BLD-Wall Bracing9/16/20149/17/20149/17/2014APASS
DetailsJim Sly
Pat Phone #: ###-####
BLD-Foundation6/26/20146/27/20146/27/2014APASS
DetailsTom Arcoraci
john Phone #: ###-####
BLD-Footing6/25/20146/26/20146/26/2014PPASS
DetailsTom Arcoraci
John Phone #: ###-####
OVERRIDE  6/19/2014  
Issue PAID IN FULL permit  6/19/2014 DONE
DetailsChristina Prado
Print Occupancy Form  6/19/2014 DONE
DetailsChristina Prado
Routing - PLUMBING6/16/2014 6/19/2014 PASS
DetailsDaryl Spivey
PLANS/APPL TAKEN TO FRONT DESK  6/19/2014 DONE
DetailsSam Zahorka
Permit Ready to Issue  6/19/2014 DONE
DetailsChristina Prado
Plan assigned to (SRZ)5/14/2014 6/19/2014 PASS
DetailsSam Zahorka
Pending Mechanical and Plumbing to PASS.
Routing - MECHANICAL6/16/2014 6/18/2014 PASS
DetailsTroy James
Routing - PLAN CHECK5/14/2014 6/9/2014 PEND
DetailsSam Zahorka
Pending Mechanical and Plumbing to PASS.
Routing - PLANNING Land Div5/14/2014 6/9/2014 PASS
DetailsTodd Tucker
Routing PW Drainage5/14/2014 6/9/2014 CANC
DetailsConnie Baumgartner
1st review completed  6/9/2014 DONE
DetailsSam Zahorka
Pending Mechanical and Plumbing to PASS.
Routing - MECHANICAL5/14/2014 5/23/2014 FAIL
DetailsTroy James
eplan
Routing - PLANNING5/14/2014 5/23/2014 PASS
DetailsJoshua Johnson
North and south elevations are flip-flopped.
Routing - FIRE5/14/20145/14/20145/21/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review 05-21-14
Routing - Design Review5/14/2014 5/16/2014 PASS
DetailsJosh Wilson
Routing - PLUMBING5/14/2014 5/15/2014 FAIL
DetailsDaryl Spivey
move water services into easement
Route to Impact Fee Review5/14/2014 5/15/2014 PASS
DetailsCindy M. Gould
Routing PW Sewer Rating5/14/2014 5/14/2014 PASS
DetailsConnie Baumgartner
Routing - Addressing5/14/2014 5/14/2014 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS5/14/2014 5/14/2014 PASS
DetailsConnie Baumgartner
Routing - Erosion and Sediment5/14/2014 5/14/2014 PASS
DetailsEvan Jenkins
Contractor to submit this updated Site Map into the onsite SWPPP
Pending Assignment by JCM5/14/2014 5/14/2014 DONE
DetailsJohn Menard
Intake Approval  5/13/2014 PASS
DetailsJohn Menard
Application received 5/12/2014