BLD-Final | 10/15/2014 | 10/15/2014 | 10/15/2014 | P | PASS |
Jim Storey
|
|
|
Garage code is 1424 Phone #: ###-#### Inspection requested via web by Braxton Hansen
|
DOC - Permit Finaled | 10/15/2014 | 10/15/2014 | 10/15/2014 | P | PASS |
Jim Storey
|
|
|
|
BLD-Blower Door Test Results | 10/15/2014 | 10/15/2014 | 10/15/2014 | P | DONE |
Jim Storey
|
|
|
31Garage code is 1424 Phone #: ###-#### Inspection requested via web by Braxton Hansen
|
BLD-Conference | 8/7/2014 | 8/7/2014 | 8/7/2014 | A | PASS |
Jim Storey
|
|
|
framing and insulation inspection so we can sheetrock. Floor truss engineering fix is over by microwave vent, right where ok to insulate sticker is. Thank you Phone #: ###-#### Inspection requested via web by Joshua Edwards
|
BLD-Energy code compliance | 8/7/2014 | 8/7/2014 | 8/7/2014 | A | PASS |
Jim Storey
|
|
|
framing and insulation inspection so we can sheetrock. Floor truss engineering fix is over by microwave vent, right where ok to insulate sticker is. Thank you Phone #: ###-#### Inspection requested via web by Joshua Edwards
|
BLD-Framing/Rough-in | 8/7/2014 | 8/7/2014 | 8/7/2014 | A | PASS |
Jim Storey
|
|
|
framing and insulation inspection so we can sheetrock. Floor truss engineering fix is over by microwave vent, right where ok to insulate sticker is. Thank you Phone #: ###-#### Inspection requested via web by Joshua Edwards
|
BLD-Framing/Rough-in | 8/4/2014 | 8/5/2014 | 8/5/2014 | P | PART |
Jim Storey
|
|
|
Framing inspection so we can insulate. Thank you Phone #: ###-#### Inspection requested via web by Joshua Edwardsf8 floor truss need repair.
|
BLD-Wall Bracing | 7/16/2014 | 7/21/2014 | 7/21/2014 | A | PASS |
Phil Shearer
|
|
|
Sheer inspection please. Phone #: ###-#### Inspection requested via web by Joshua Edwards
|
BLD-Foundation | 6/12/2014 | 6/12/2014 | 6/12/2014 | P | PASS |
Jim Storey
|
|
|
Doug Phone #: ###-####
|
BLD-Footing | 6/11/2014 | 6/11/2014 | 6/12/2014 | P | PASS |
Jim Storey
|
|
|
Doug Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/30/2014 | | DONE |
Barbara Stitt
|
|
|
|
OVERRIDE | | | 5/27/2014 | | |
|
|
|
|
Application received | | 5/13/2014 | 5/27/2014 | | DONE |
|
|
|
|
Telephone call | | | 5/27/2014 | | DONE |
Tisha Gallop
|
|
|
called Seth and told him permit is ready and fee due.
|
Inspection Record Card- Bld | | | 5/27/2014 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 5/27/2014 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (JG) | 5/13/2014 | 5/13/2014 | 5/23/2014 | | PASS |
Javier Guzman
|
|
|
Due 5/23 F L1**
|
Routing - PLAN CHECK | 5/23/2014 | | 5/23/2014 | | PASS |
Javier Guzman
|
|
|
|
Routing - MECHANICAL | 5/21/2014 | | 5/23/2014 | | PASS |
Troy James
|
|
|
|
1st review completed | | | 5/23/2014 | | DONE |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 5/23/2014 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/23/2014 | | DONE |
|
|
|
|
Routing - PLANNING | 5/15/2014 | | 5/21/2014 | | PASS |
Joshua Johnson
|
|
|
|
Routing - PUBLIC WORKS | 5/14/2014 | | 5/15/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Addressing | | | 5/14/2014 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/13/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/13/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Intake Approval | | | 5/13/2014 | | PASS |
Candy A. Nichols
|
|
|
|