BLD-Energy code compliance | 8/8/2014 | 8/8/2014 | 8/8/2014 | P | PASS |
Dave Hannah
|
|
|
call before to meet // eric Phone #: ###-####
|
BLD-Framing/Rough-in | 8/7/2014 | 8/8/2014 | 8/8/2014 | A | PASS |
Dave Hannah
|
|
|
Robert Phone #: ###-####
|
BLD-Framing/Rough-in | 7/22/2014 | 7/23/2014 | 7/23/2014 | A | PART |
Jim Storey
|
|
|
Robert Phone #: ###-#### fire blk ceilling and floor duct chase. ok to insulate
|
Routing - MECHANICAL | 7/16/2014 | | 7/16/2014 | | PASS |
Troy James
|
|
|
manual j report
|
Routing Walk-In (BLD) | 7/10/2014 | 7/10/2014 | 7/10/2014 | A | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 7/10/2014 | 7/10/2014 | 7/10/2014 | | PASS |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 7/10/2014 | | |
|
|
|
|
1st review completed | | | 7/10/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/10/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/10/2014 | | DONE |
Barbara Stitt
|
|
|
|
Issue PAID IN FULL permit | | | 7/10/2014 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | 5/14/2014 | 5/14/2014 | | DONE |
Barbara Stitt
|
|
|
|
Routing Walk-In (BLD) | 5/14/2014 | 5/14/2014 | 5/14/2014 | P | FAIL |
Javier Guzman
|
|
|
Missing engineering for SIPS roof overbuilt, details of SIPS roof overbuilt and eave/facia details for WUI A,
|
1st review completed | | | 5/14/2014 | | FAIL |
Javier Guzman
|
|
|
|