BLD-Final | 11/20/2014 | 11/21/2014 | 11/21/2014 | A | PASS |
Tony Young
|
|
|
james Phone #: James ###-####-call prior to meet for access
|
DOC - Permit Finaled | 11/21/2014 | 11/21/2014 | 11/21/2014 | P | PASS |
Tony Young
|
|
|
c of o issued
|
PubWorks Occupancy Approval | 11/20/2014 | 11/20/2014 | 11/20/2014 | | DONE |
Jason C. Taylor
|
|
|
Recieved bond for site stabilization and revegetation. Project is approved for occupancy by PW. Project will need engineers approval, roof drain connection verified, and site stablilized prior to releasing the bond. Jason Taylor ###-####.
|
Routing PW Grading-Hillside | 10/31/2014 | | 11/17/2014 | | PASS |
Jason C. Taylor
|
|
|
Approved new design for retaining walls. Jason Taylor ###-####
|
BLD-Conference | 11/12/2014 | 11/12/2014 | 11/12/2014 | P | PASS |
Tony Young
|
|
|
James Phone #: ###-####,, walk through for final.. trades.. hill side,, address ,, fire seperation,, etc
|
Plan resubmittals received | | | 10/31/2014 | | DONE |
|
|
|
received resubmittals for rock wall; received two drawings (8.5 x 11) and three copied of calcs and specs; ok'd by Jason Taylor. Routed to Jason Taylor.
|
BLD-Other | 9/30/2014 | 9/30/2014 | 9/30/2014 | P | PASS |
Tony Young
|
|
|
James-soffits-please call prior so James can meet you Phone #: ###-####
|
BLD-Wall Bracing | 9/10/2014 | 9/11/2014 | 9/11/2014 | A | PART |
Jim Sly
|
|
|
James Phone #: ###-#### Interior Gyp shear.......OK.
|
BLD-Energy code compliance | 9/4/2014 | 9/4/2014 | 9/4/2014 | P | PASS |
Tony Young
|
|
|
James Phone #: ###-####,, working on 1st layer of soffit also
|
BLD-Framing/Rough-in | 8/28/2014 | 8/29/2014 | 8/29/2014 | A | PART |
Tony Young
|
|
|
James Phone #: ###-####,, need sprinkler pass,, strap plates,, ok to insulate
|
BLD-Wall Bracing | 8/11/2014 | 8/11/2014 | 8/11/2014 | P | PASS |
Phil Shearer
|
|
|
James Phone #: ###-####4-please call 30 minutes prior
|
BLD-Conference | 7/11/2014 | 7/11/2014 | 7/11/2014 | P | PASS |
Tony Young
|
|
|
James-Right after lunch please Phone #: ###-####,, per plan..
|
BLD-Footing | 6/18/2014 | 6/19/2014 | 6/19/2014 | A | PASS |
Tony Young
|
|
|
column ftgs
|
Routing PW Grading-Hillside | 6/19/2014 | | 6/19/2014 | | PASS |
Jim Wyllie
|
|
|
Subgrade approval for column footings received. Okay to proceed with column footing construction. Jim Wyllie (###-####)
|
BLD-Footing | 6/17/2014 | 6/18/2014 | 6/18/2014 | A | NR |
Tony Young
|
|
|
column ftgs,, need soil approval 1st
|
BLD-Foundation | 6/16/2014 | 6/17/2014 | 6/17/2014 | A | PASS |
Tony Young
|
|
|
chris; Phone #: ###-#### Heron ###-####
|
BLD-Footing | 6/16/2014 | 6/16/2014 | 6/16/2014 | P | PASS |
Tony Young
|
|
|
chris; Phone #: ###-#### Heron also called in an inspection today for a footing ###-####
|
PubWorks Subgrade Approval | 6/12/2014 | 6/12/2014 | 6/12/2014 | | DONE |
Jason C. Taylor
|
|
|
* FOOTINGS ONLY - NO COLUMN PADS OUTSIDE CRAWLSPACE AREA* A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 6/5/2014 | | |
|
|
|
|
Plan assigned to (JG) | 5/16/2014 | 5/16/2014 | 6/5/2014 | | PASS |
Javier Guzman
|
|
|
1st review completed, Due 6/03 T L2 Hillside**
|
Application received | | 5/15/2014 | 6/5/2014 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/5/2014 | | 6/5/2014 | | PASS |
Javier Guzman
|
|
|
|
Plan resubmittals received | | | 6/5/2014 | | DONE |
Christina Prado
|
|
|
Received two sets of revised plan sheets marked A-2, A5, A11 & A14 as well as two revised structural calcs;Plans taken to Javier for further review
|
Routing PW Grading-Hillside | 6/5/2014 | | 6/5/2014 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Case Summary (BLD) | | | 6/5/2014 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/5/2014 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/5/2014 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 6/5/2014 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 6/5/2014 | | DONE |
Tisha Gallop
|
|
|
James called office to check on status of permit. Told him permit is ready and fee due.
|
Issue PAID IN FULL permit | | | 6/5/2014 | | DONE |
Tisha Gallop
|
|
|
|
1st review completed | | | 6/3/2014 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PUBLIC WORKS | | | 6/3/2014 | | PASS |
Connie Baumgartner
|
|
|
singned off in PW review report by Connie B.
|
Routing - PLAN CHECK | | | 6/3/2014 | | FAIL |
Javier Guzman
|
|
|
sent review report to applicant
|
Routing - Erosion and Sediment | 5/29/2014 | | 6/2/2014 | | PASS |
Evan Jenkins
|
|
|
|
Routing - FIRE | 5/29/2014 | | 5/30/2014 | | PASS |
Scott Arellano
|
|
|
Approved. The home on this lot (26) is required to have Fire Sprinklers per Boise Fire Department conditions of approval. A seperate Fire Sprinkler permit is required; as regulated by the Fire Department.
|
Plan resubmittals received | | | 5/30/2014 | | DONE |
Candy A. Nichols
|
|
|
James brought in 2 sheets of Erision and Sediment Control Plan- I took to Even Jenkins
|
Routing - MECHANICAL | 5/29/2014 | | 5/29/2014 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 5/21/2014 | | 5/29/2014 | | FAIL |
Troy James
|
|
|
emailed correction to integrity heating
|
Route to Impact Fee Review | 5/15/2014 | 5/20/2014 | 5/21/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLANNING | 5/21/2014 | | 5/21/2014 | | PASS |
David Moser
|
|
|
|
Routing - Addressing | | | 5/21/2014 | | PASS |
|
|
|
|
Routing PW Grading-Hillside | | | 5/21/2014 | | FAIL |
Jason C. Taylor
|
|
|
Need additional grading plan (as required on permit).
|
Plan resubmittals received | | | 5/21/2014 | | DONE |
Candy A. Nichols
|
|
|
1 set of site grading & drainage plans-2 sheets-took to Javier Guzman
|
Plans ACCEPTED BY PLAN TECH | | | 5/16/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/16/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Intake Approval | | | 5/15/2014 | | PASS |
Candy A. Nichols
|
|
|
|