Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD14-01339
StatusExpired
Name ATKINSON ROY
Site Address 6521 W USTICK RD
Project NameCRUTON LLC
Customer Number 
ePlanReviewNo
Description
(CRUTON, LLC) This building does NOT have a fire sprinkler system. To remodel an existing 2,918 square foot tenant space to be used as a social hall AND as a kitchen producing sorbet and tortillas that will be served at “Tree City Juice” outlets. No cooking will take place within the kitchen. The kitchen will NOT serve the social hall. The social hall will likely be sub-leased to a separate entity from time to time. A separate permit is required to use any portion of this tenant space as a restaurant. Work is to include interior nonbearing walls, 2 restrooms accessible to the disabled, interior doors, an exterior wall infill, wall furring, an exterior overhead door, and interior finishes. The 2-hr fire-resistance-rated parapet on the East property line wall that was required under an earlier permit is required to be completed under this permit. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/8/20163/8/20163/8/2016PDONE
DetailsJim Sly
EXP.
DOC - Permit Expired3/8/20163/8/20163/8/2016PPASS
DetailsJim Sly
BLD-Final12/15/201412/16/201412/16/2014APASS
DetailsJim Sly
Jim Phone #: ###-####
OK for Perm Occ.
FIRE-Final Inspection12/9/201412/10/201412/10/2014APASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection11/28/201412/1/201412/1/2014AFAIL
DetailsTroy Cobbley
Repair the three existing exit/emergency lights
FIRE-Final Inspection11/28/201411/28/201411/28/2014ANR
DetailsForrest France
Inspection request intended for Monday 12/1 AM per conversation with the contractor. -Rescheduled per discussion
FIRE-Final Inspection11/10/201411/12/201411/12/2014AFAIL
DetailsTroy Cobbley
Mount fire extinguisher in the social hall, test all exit signs and emergency lights, provide panic hardware on both corridor doors, provide single action hardware on all interior doors. Any changes witll need to be approved by the building plan reviewer.
BLD-Framing/Rough-in9/22/20149/23/20149/23/2014APASS
DetailsJim Sly
Jim-please call prior for access Phone #: ###-####
BLD-Conference8/12/20148/12/20148/12/2014PDONE
DetailsJim Sly
Jim Boyd Phone #: ###-####
Issue PAID IN FULL permit  7/9/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  7/7/2014 DONE
DetailsTisha Gallop
Telephone call  7/7/2014 DONE
DetailsTisha Gallop
called Thomas and left vm permit is ready, fee due, need GC and ACHD
Plan assigned to (CJW)6/2/20146/2/20147/3/2014 PASS
DetailsCarl Westfall
CRUTLN, LLC - Level 3 TI - paper (15 days - Jun 20)
Routing - PLAN CHECK7/3/2014 7/3/2014 PASS
DetailsCarl Westfall
Routing completed
PLANS/APPL TAKEN TO FRONT DESK  7/3/2014 DONE
Print Occupancy Form  7/3/2014 DONE
DetailsChristina Prado
Routing PW Sewer Rating7/3/2014 7/3/2014 PASS
DetailsBeverly Mountain
drinking fountains added
Routing - FIRE7/2/2014 7/2/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review Rev 1 07-02-14
Routing - PLAN CHECK6/25/2014 7/2/2014 PASS
DetailsCarl Westfall
Drawings approved, with "red lines", after the 2nd review.
Plan resubmittals received  7/1/2014 DONE
DetailsChristina Prado
Received two sets of revised plan sheet marked A2.1 as well as one response letter and one copy of plan reviewer comments;Plans stamped and taken back to Carl Westfall for further review
Plan resubmittals received  6/27/2014  
Recieved a copy of the plan review report/response, 2 copies of sheets A1-1, A2-1, A2-2 and taken to Carl Westfall's desk
Routing - FIRE6/24/2014 6/25/2014 FAIL
DetailsCraig D. Hanson
See Fire Plan Review 06-25-14
1st review completed  6/25/2014 FAIL
Failed: Plan Check, Fire
Routing - PLAN CHECK6/6/2014 6/24/2014 FAIL
DetailsCarl Westfall
Revised drawings required.
Routing - Design Review6/5/2014 6/6/2014 PASS
DetailsSarah Schafer
Sarah Schafer - minor exterior wall infill at rear Minor window infill approved through building permit.
Routing - PLUMBING  6/5/2014 PASS
DetailsBill VanDegrift
water sizing per appendix A
Routing - PUBLIC WORKS6/3/2014 6/4/2014 PASS
DetailsJennifer Bruner
Application received 5/19/20146/3/2014 DONE
Routing - Addressing6/2/2014 6/3/2014 PASS
DetailsJason C. Taylor
Routing PW Environmental6/3/2014 6/3/2014 PASS
DetailsRick Christenson
No issues.
Routing PW Sewer Rating6/3/2014 6/3/2014 PASS
DetailsJennifer Bruner
Plans ACCEPTED BY PLAN TECH  6/2/2014 DONE
DetailsCandy A. Nichols
Recd Pcfee & Taken To Pln CK  6/2/2014 DONE
DetailsCandy A. Nichols
Pending Assignment by JCB6/2/2014 6/2/2014 DONE
DetailsJason Blais
Intake Approval  6/2/2014 PASS
DetailsJason Blais
Prescreen passed and plan review fees paid.
Intake Approval  5/19/2014 FAIL
See the attached checklist