BLD-Final | 9/11/2014 | 9/12/2014 | 9/12/2014 | A | PASS |
Mike Jordan
|
|
|
Final Phone #: ###-#### Inspection requested via web by greg bauer
|
DOC - Permit Finaled | 9/12/2014 | 9/12/2014 | 9/12/2014 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 8/14/2014 | 8/15/2014 | 8/15/2014 | A | PASS |
Jim Sly
|
|
|
Framing/rough-in for Outdoor Structures before installing soffit. Phone #: ###-#### Inspection requested via web by greg bauer
|
BLD-Footing | 7/11/2014 | 7/11/2014 | 7/11/2014 | P | DONE |
Mike Jordan
|
|
|
Inspection if needed for metal post base attachment to concrete footing, now has been installed with the 1 1/2" of non shrink grout under metal plates per Engineering detail "A"; column base detail (attached). Phone #: ###-#### Inspection requested via web by greg bauer
|
BLD-Conference | 7/8/2014 | 7/9/2014 | 7/9/2014 | A | PASS |
Dave Hannah
|
|
|
Inspection for metal post base attachment to concrete footing. Phone #: ###-#### >> Inspection requested via web by greg bauer
|
BLD-Footing | 6/23/2014 | 6/23/2014 | 6/23/2014 | P | PART |
Tom Arcoraci
|
|
|
Herron Phone #: ###-#### wip ok
|
Routing Walk-In (Zoning) | 5/23/2014 | 5/23/2014 | 5/23/2014 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 5/23/2014 | 5/23/2014 | 5/23/2014 | P | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 5/23/2014 | 5/23/2014 | 5/23/2014 | | PASS |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 5/23/2014 | | |
|
|
|
|
1st review completed | | | 5/23/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/23/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/23/2014 | | DONE |
Barbara Stitt
|
|
|
|
Issue PAID IN FULL permit | | | 5/23/2014 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | 5/23/2014 | | | |
|
|
|
|