BLD-Framing/Rough-in | 8/12/2014 | 8/13/2014 | 8/13/2014 | A | PASS |
Jim Sly
|
|
|
Thanks mike Phone #: ###-#### Inspection requested via web by mike duvall Deck complete and finaled.
|
DOC - Permit Finaled | 8/13/2014 | 8/13/2014 | 8/13/2014 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 8/11/2014 | 8/12/2014 | 8/12/2014 | A | NR |
Jim Sly
|
|
|
Please call and specify Time so I can meet inspector on site. Thank you ###-#### Inspection requested via web by mike duvall
|
Telephone call | | | 7/16/2014 | | DONE |
|
|
|
With Mr. Hessing. About possible X bracing on the deck structure, as the ctr. is on vacation. we will wait until contractor is back to discuss. 7-16-2014 10:00 a.m.
|
BLD-Footing | 5/30/2014 | 6/2/2014 | 6/2/2014 | P | PASS |
Jim Sly
|
|
|
Please call to confirm this request and schedule time to meet. Thank you. Phone #: ###-#### >> Inspection requested via web by mike duvall
|
Routing Walk-In (Zoning) | 5/27/2014 | 5/27/2014 | 5/27/2014 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 5/27/2014 | 5/27/2014 | 5/27/2014 | A | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 5/27/2014 | 5/27/2014 | 5/27/2014 | | PASS |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 5/27/2014 | | |
|
|
|
|
1st review completed | | | 5/27/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/27/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/27/2014 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 5/27/2014 | | DONE |
Christina Prado
|
|
|
|
Application received | | 5/27/2014 | | | |
|
|
|
|