BLD-Final | 11/13/2015 | 11/16/2015 | 11/16/2015 | A | PASS |
Phil Shearer
|
|
|
Steve Phone #: ###-####
|
DOC - Permit Finaled | 11/16/2015 | 11/16/2015 | 11/16/2015 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Footing | 9/5/2014 | 9/8/2014 | 9/8/2014 | A | PASS |
Phil Shearer
|
|
|
Steve- pour time 10am Phone #: ###-####
|
PubWorks Subgrade Approval | 9/8/2014 | 9/8/2014 | 9/8/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 9/5/2014 | 9/5/2014 | 9/5/2014 | P | CANC |
Phil Shearer
|
|
|
Steve Phone #: ###-####
|
OVERRIDE | | | 7/15/2014 | | |
|
|
|
|
Routing Walk-In (Zoning) | 7/15/2014 | 7/15/2014 | 7/15/2014 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 7/15/2014 | 7/15/2014 | 7/15/2014 | P | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 7/15/2014 | 7/15/2014 | 7/15/2014 | | PASS |
Perry Paine
|
|
|
|
Application received | | 5/28/2014 | 7/15/2014 | | DONE |
|
|
|
|
Routing Walk-In (PW Hillside) | 5/28/2014 | 5/28/2014 | 7/15/2014 | P | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Issue PAID IN FULL permit | | | 7/15/2014 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 7/15/2014 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/15/2014 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/15/2014 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/15/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/15/2014 | | DONE |
Tisha Gallop
|
|
|
|
Routing Walk-In (Zoning) | 5/28/2014 | 5/28/2014 | 5/28/2014 | P | DONE |
|
|
|
Need site plan drawn to scale
|
Routing Walk-In (BLD) | 5/28/2014 | 5/28/2014 | 5/28/2014 | P | DONE |
Jason C. Taylor
|
|
|
|
1st review completed | | | 5/28/2014 | | FAIL |
|
|
|
|