Telephone call | | | 12/29/2015 | | DONE |
|
|
|
left a message about scheduling a final inspection
|
FIRE-Final Inspection | 3/31/2015 | 3/31/2015 | 3/31/2015 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 3/23/2015 | 3/23/2015 | 3/23/2015 | P | PART |
Troy Cobbley
|
|
|
Upper area blow-in insulation complete on the west side, east side and south sides. North side has installation issues at this time. Fire blocking for the underside not started yet.
|
FIRE-Conference | 3/11/2015 | 3/11/2015 | 3/12/2015 | P | DONE |
Troy Cobbley
|
|
|
Robert and I discussed the parapet and I deferred him to tim frost for the minimal sprinkler requirements.
|
FIRE-Conference | 10/15/2014 | 10/16/2014 | 10/16/2014 | A | DONE |
Troy Cobbley
|
|
|
Derek spoke about meeting the requirements of NFPA 13 for filling a space entirely with non-combustible insulation for one area and sectioning off another area to meet the less than 160 cubic foot rule/exception. I agreed to both as long as they meet code.
|
BLD-Final | 9/23/2014 | 9/24/2014 | 9/24/2014 | P | NR |
Phil Shearer
|
|
|
Brain Phone #: ###-####
|
FIRE-Final Inspection | 9/23/2014 | 9/24/2014 | 9/24/2014 | A | FAIL |
Troy Cobbley
|
|
|
The new overbuilds create combustible concealed spaces that need to meet the requirements of NFPA 13 which may include addtion/modification to the existing fire sprinkler system.
|
Telephone call | | | 9/24/2014 | | DONE |
|
|
|
Spoke with Derick Cooper who is the General Contractor for this project. Derick called to ask for help to figure out what he is supposed to do now that the project is sealed up and the City is now telling him he needs to fire sprinker combustible spaces in the facade. Derick states that nobody from the City told him nor indicated on approved plans he would need to add fire sprinkler protection in these areas so he didn't do it. I informed Derick of some options and he will discuss with his architect.
|
BLD-Final | 9/23/2014 | 9/23/2014 | 9/23/2014 | P | CANC |
Phil Shearer
|
|
|
Brian Phone #: ###-####
|
BLD-Framing/Rough-in | 8/22/2014 | 8/25/2014 | 8/25/2014 | A | PASS |
Phil Shearer
|
|
|
Brian Phone #: ###-####
|
Issue PAID IN FULL permit | | | 7/24/2014 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PLAN CHECK | 6/12/2014 | | 6/12/2014 | | PASS |
Tim L. Woodard
|
|
|
Approved with engineering attached. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/12/2014 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 6/12/2014 | | DONE |
Tim L. Woodard
|
|
|
|
Inspection Record Card- Bld | | | 6/12/2014 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 6/12/2014 | | DONE |
Christina Prado
|
|
|
Called Doug to advise permit is ready pending GC and gave fees due
|
Permit Ready to Issue | | | 6/12/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (TLW) | 5/30/2014 | | 6/12/2014 | | PASS |
Tim L. Woodard
|
|
|
Tim Woodard
|
Plan resubmittals received | | | 6/9/2014 | | DONE |
Tim L. Woodard
|
|
|
Recieved engineering from architect. TLW
|
1st review completed | | | 6/4/2014 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 6/2/2014 | | 6/4/2014 | | FAIL |
Tim L. Woodard
|
|
|
Provide structural engineering. Emailed architect. TLW
|
Routing - PLANNING | 5/30/2014 | | 6/2/2014 | | PASS |
Josh Wilson
|
|
|
DRH14-00146 Approved per the DR. There is a slight change with the removal of the brick on the south elevation approved through the building permit plans. SMS
|
Application received | | 5/29/2014 | 5/29/2014 | | DONE |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/29/2014 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 5/29/2014 | | PASS |
Tim L. Woodard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/29/2014 | | DONE |
Barbara Stitt
|
|
|
|