BLD-Final | 5/18/2015 | 5/18/2015 | 5/18/2015 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-####
|
DOC - Permit Finaled | 5/18/2015 | 5/18/2015 | 5/18/2015 | P | PASS |
Dave Hannah
|
|
|
|
PubWorks Occupancy Approval | 5/13/2015 | 5/13/2015 | 5/13/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
CHANGE STATUS TO (ISS) | | | 5/8/2015 | | DONE |
Christina Prado
|
|
|
Plan mod fees paid
|
Expiration Notice | 5/5/2015 | 5/27/2015 | 5/5/2015 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 4/15/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 4/15/2015 | | DONE |
|
|
|
do not re issue
|
Plan assigned to (JG) | 4/8/2015 | 4/8/2015 | 4/13/2015 | | PASS |
Javier Guzman
|
|
|
Plan Mod ePlan
|
Routing - PLAN CHECK | 4/8/2015 | | 4/13/2015 | | PASS |
Javier Guzman
|
|
|
plan mod
|
Routing PW Grading-Hillside | 4/8/2015 | | 4/13/2015 | | PASS |
Jason C. Taylor
|
|
|
Retaining wall engineering approved. Wall infront of house cannot exceed 3 feet in exposed height as per P&Z. Jason Taylor ###-####.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/13/2015 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 4/8/2015 | | DONE |
Christina Prado
|
|
|
Plan modification requested by applicant to submit new retaining wall engineering - walls already shown on plans, engineering was the only addition to plans///cdp
|
BLD-Energy code compliance | 11/21/2014 | 11/21/2014 | 11/22/2014 | P | PASS |
Dave Hannah
|
|
|
Mike Phone #: ###-####
|
BLD-Energy code compliance | 11/10/2014 | 11/10/2014 | 11/10/2014 | P | NR |
Jim Sly
|
|
|
Mike Phone #: ###-####
|
BLD-Framing/Rough-in | 11/10/2014 | 11/10/2014 | 11/10/2014 | P | PASS |
Jim Sly
|
|
|
Mike Phone #: ###-####
|
BLD-Other | 11/4/2014 | 11/5/2014 | 11/5/2014 | A | PASS |
Dave Hannah
|
|
|
Mike-fire rated soffitts Phone #: ###-#### soffits and can lights ok to cover
|
Override - Parcel Holds | 11/4/2014 | 1/1/1900 | 11/4/2014 | | |
|
|
|
wanting fire inspections for soffitts
|
FIRE-Conference | 11/3/2014 | 11/3/2014 | 11/3/2014 | P | DONE |
Forrest France
|
|
|
Mike-please call Mike to meet, needs soffit and can inspections Phone #: ###-#### *Re WUI construction requirements per FD ordinance.
|
Override - Parcel Holds | 11/3/2014 | 1/1/1900 | 11/3/2014 | | |
|
|
|
customer called so we set up the inspection taht was needed
|
BLD-Other | 10/22/2014 | 10/22/2014 | 10/22/2014 | P | PASS |
Dave Hannah
|
|
|
Mike-facia & soffitt Phone #: ###-####
|
BLD-Wall Bracing | 9/15/2014 | 9/16/2014 | 9/16/2014 | P | PASS |
Phil Shearer
|
|
|
Jeff Phone #: ###-####
|
BLD-Foundation | 7/17/2014 | 7/18/2014 | 7/18/2014 | P | PASS |
Phil Shearer
|
|
|
Wes Phone #: ###-####
|
BLD-Footing | 7/16/2014 | 7/17/2014 | 7/17/2014 | P | PASS |
Phil Shearer
|
|
|
Wes Phone #: ###-####
|
PubWorks Subgrade Approval | 7/15/2014 | 7/15/2014 | 7/15/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 6/27/2014 | | |
|
|
|
|
Plan assigned to (JG) | 6/3/2014 | 6/3/2014 | 6/27/2014 | | PASS |
Javier Guzman
|
|
|
1st review completed, pending hillside, Due 6/20 F L2 Hillside ePlan**
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/27/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/27/2014 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 6/27/2014 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 6/27/2014 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 6/19/2014 | | 6/26/2014 | | PASS |
Javier Guzman
|
|
|
|
Routing PW Grading-Hillside | 6/26/2014 | | 6/26/2014 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PLAN CHECK | 6/3/2014 | | 6/19/2014 | | FAIL |
Javier Guzman
|
|
|
ePlan review
|
1st review completed | | | 6/19/2014 | | FAIL |
Javier Guzman
|
|
|
ePlan
|
Routing - PLANNING | 6/3/2014 | | 6/18/2014 | | PASS |
Sue Cummings
|
|
|
signed off in ePlan planning review by Sue Cummings
|
Routing PW Grading-Hillside | 6/3/2014 | | 6/18/2014 | | FAIL |
Jason C. Taylor
|
|
|
ePlan
|
Routing - MECHANICAL | 6/17/2014 | | 6/17/2014 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 6/3/2014 | 6/3/2014 | 6/6/2014 | | PASS |
Scott Arellano
|
|
|
Approved. This home has been evaluated for FD vehicle access.
|
Route to Impact Fee Review | 6/3/2014 | 6/6/2014 | 6/4/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - MECHANICAL | 6/3/2014 | | 6/4/2014 | | FAIL |
Troy James
|
|
|
comments posted on eplan
|
Plans ACCEPTED BY PLAN TECH | | | 6/3/2014 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 6/3/2014 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/3/2014 | | DONE |
Christina Prado
|
|
|
|
Routing - Addressing | 6/3/2014 | | 6/3/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 6/3/2014 | | 6/3/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Erosion and Sediment | 6/3/2014 | | 6/3/2014 | | PASS |
Evan Jenkins
|
|
|
|
Application received | | | 5/31/2014 | | DONE |
|
|
|
Application submitted via PDS Online on May 31 2014 5:43PM
|