BLD-Final | 12/3/2014 | 12/4/2014 | 12/4/2014 | P | PASS |
Jim Sly
|
|
|
doug - after 1pm Phone #: ###-####
|
DOC - Permit Finaled | 12/4/2014 | 12/4/2014 | 12/4/2014 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 9/29/2014 | 9/29/2014 | 9/29/2014 | P | PASS |
Phil Shearer
|
|
|
Doug Phone #: ###-####
|
BLD-Framing/Rough-in | 9/25/2014 | 9/26/2014 | 9/26/2014 | A | PASS |
Jim Sly
|
|
|
William-would like as late AM as possible Phone #: ###-####
|
BLD-Framing/Rough-in | 9/24/2014 | 9/24/2014 | 9/24/2014 | P | NR |
Jim Sly
|
|
|
Doug Phone #: ###-#### Walk thru.......Frame and Shear ......not ready.
|
Routing - MECHANICAL | 9/16/2014 | | 9/17/2014 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 9/16/2014 | | DONE |
Kristal Soland
|
|
|
received one copy of revised manual j- taken to Troy James
|
BLD-Foundation | 8/18/2014 | 8/19/2014 | 8/19/2014 | A | PASS |
Jim Sly
|
|
|
Doug-late am if possible Phone #: ###-#### All foundation OK
|
BLD-Footing | 8/15/2014 | 8/15/2014 | 8/15/2014 | P | PASS |
Jim Sly
|
|
|
before 3:30 // garage footing // Greg Phone #: ###-#### This should complete all footings.........except maybe some pads.
|
BLD-Foundation | 8/13/2014 | 8/14/2014 | 8/14/2014 | A | PASS |
Jim Sly
|
|
|
Doug Phone #: ###-#### Main house walls done and OK.
|
BLD-Footing | 8/13/2014 | 8/14/2014 | 8/14/2014 | A | PASS |
Jim Sly
|
|
|
Doug Phone #: ###-#### Footing for Casita.......OK
|
BLD-Footing | 8/11/2014 | 8/12/2014 | 8/12/2014 | A | PART |
Jim Sly
|
|
|
late am, wants to pour at 12:30 // Doug Phone #: ###-#### All of House Footings done and OK.
|
BLD-Footing | 8/6/2014 | 8/7/2014 | 8/7/2014 | P | PART |
Jim Sly
|
|
|
Doug-walls Phone #: ###-#### West 1/2f Footings OK.
|
BLD-Foundation | 8/6/2014 | 8/7/2014 | 8/7/2014 | P | PART |
Jim Sly
|
|
|
Doug-walls Phone #: ###-#### North West Area walls OK
|
BLD-Footing | 8/1/2014 | 8/4/2014 | 8/4/2014 | A | PART |
Jim Storey
|
|
|
late am or early pm // partial footing // Doug Phone #: ###-#### west side ft ok pending pw sign off
|
PubWorks Subgrade Approval | 8/4/2014 | 8/4/2014 | 8/4/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 7/23/2014 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 7/23/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Bld | | | 7/23/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Permit Ready to Issue | | | 7/23/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Plan assigned to (JG) | 6/27/2014 | 6/27/2014 | 7/21/2014 | | PASS |
Javier Guzman
|
|
|
1st review completed, pending Mech, 7/16 W L2 Hillside ePlan*
|
Routing - MECHANICAL | 7/21/2014 | | 7/21/2014 | | PASS |
Troy James
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/21/2014 | | DONE |
|
|
|
|
Routing - FIRE | 7/18/2014 | 7/18/2014 | 7/18/2014 | | PASS |
Scott Arellano
|
|
|
Approved.
|
Routing - MECHANICAL | 7/17/2014 | | 7/17/2014 | | FAIL |
Troy James
|
|
|
emailed corrections to western heating
|
Telephone call | | | 7/15/2014 | | DONE |
Scott Arellano
|
|
|
Owner has agreed to exercise the option to fire sprinkler the home which satisfies the fire department vehicle access issue.
|
1st review completed | | | 7/14/2014 | | FAIL |
Javier Guzman
|
|
|
|
Routing - Addressing | | | 7/14/2014 | | PASS |
Emily Dixon
|
|
|
Signed off in ePlan by Emily Dixon
|
Routing - PLAN CHECK | | | 7/14/2014 | | PASS |
Javier Guzman
|
|
|
|
Routing - FIRE | 6/27/2014 | 6/27/2014 | 7/7/2014 | | FAIL |
Scott Arellano
|
|
|
See electronic changemarks for correction item. Attached plan review report to case. Emailed architect plan review report.
|
Routing - PUBLIC WORKS | | | 7/1/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Grading-Hillside | 6/30/2014 | | 7/1/2014 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - MECHANICAL | | | 7/1/2014 | | FAIL |
Troy James
|
|
|
eplan
|
Route to Impact Fee Review | 6/27/2014 | 7/2/2014 | 6/30/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - Erosion and Sediment | 6/30/2014 | | 6/30/2014 | | PASS |
Andy J. Long
|
|
|
ESC site map and narrative submitted and approved. Valid RP and PD designated.
|
Routing - PLANNING | 6/27/2014 | | 6/27/2014 | | PASS |
Colleen T Carroll
|
|
|
|
Intake Approval | | | 6/27/2014 | | PASS |
Christina Prado
|
|
|
|
Routing - Addressing | 6/27/2014 | | 6/27/2014 | | PASS |
Emily Dixon
|
|
|
|
Intake Approval | | | 6/26/2014 | | FAIL |
Christina Prado
|
|
|
Need - CO, smoke detectors, wall bracing, foundation stamped by engineer and address the ADU shown on plans
|
Application received | | | 6/2/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 2 2014 2:14PM
|