Permit Information
Permit NumberBLD14-01474
StatusFinaled
Name MCALVAIN INC
Site Address 4384 W EDGEMONT ST
Project NameMcAlvain Residence
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 3032 sq. ft., one story single family dwelling with 4 bedrooms, 2 full bathrooms, 2 half bathrooms, approximately 622 sq. ft. of covered patio/porch and a 940 sq. ft. attached garage per the approved plans, Rescheck, plan review report and any notations. R-1C zoning and setbacks per planning. JG A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946 This home will be fire sprinklered in accordance with NFPA 13D to satisfy Fire Department Vehicle access deficiency.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/3/201412/4/201412/4/2014PPASS
DetailsJim Sly
doug - after 1pm Phone #: ###-####
DOC - Permit Finaled12/4/201412/4/201412/4/2014PPASS
DetailsJim Sly
BLD-Energy code compliance9/29/20149/29/20149/29/2014PPASS
DetailsPhil Shearer
Doug Phone #: ###-####
BLD-Framing/Rough-in9/25/20149/26/20149/26/2014APASS
DetailsJim Sly
William-would like as late AM as possible Phone #: ###-####
BLD-Framing/Rough-in9/24/20149/24/20149/24/2014PNR
DetailsJim Sly
Doug Phone #: ###-####
Walk thru.......Frame and Shear ......not ready.
Routing - MECHANICAL9/16/2014 9/17/2014 PASS
DetailsTroy James
Plan resubmittals received  9/16/2014 DONE
DetailsKristal Soland
received one copy of revised manual j- taken to Troy James
BLD-Foundation8/18/20148/19/20148/19/2014APASS
DetailsJim Sly
Doug-late am if possible Phone #: ###-####
All foundation OK
BLD-Footing8/15/20148/15/20148/15/2014PPASS
DetailsJim Sly
before 3:30 // garage footing // Greg Phone #: ###-####
This should complete all footings.........except maybe some pads.
BLD-Foundation8/13/20148/14/20148/14/2014APASS
DetailsJim Sly
Doug Phone #: ###-####
Main house walls done and OK.
BLD-Footing8/13/20148/14/20148/14/2014APASS
DetailsJim Sly
Doug Phone #: ###-####
Footing for Casita.......OK
BLD-Footing8/11/20148/12/20148/12/2014APART
DetailsJim Sly
late am, wants to pour at 12:30 // Doug Phone #: ###-####
All of House Footings done and OK.
BLD-Footing8/6/20148/7/20148/7/2014PPART
DetailsJim Sly
Doug-walls Phone #: ###-####
West 1/2f Footings OK.
BLD-Foundation8/6/20148/7/20148/7/2014PPART
DetailsJim Sly
Doug-walls Phone #: ###-####
North West Area walls OK
BLD-Footing8/1/20148/4/20148/4/2014APART
DetailsJim Storey
late am or early pm // partial footing // Doug Phone #: ###-#### west side ft ok pending pw sign off
PubWorks Subgrade Approval8/4/20148/4/20148/4/2014 DONE
DetailsJason C. Taylor

A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
OVERRIDE  7/23/2014  
Issue PAID IN FULL permit  7/23/2014 DONE
DetailsCandy A. Nichols
Inspection Record Card- Bld  7/23/2014 DONE
DetailsCandy A. Nichols
Permit Ready to Issue  7/23/2014 DONE
DetailsCandy A. Nichols
Plan assigned to (JG)6/27/20146/27/20147/21/2014 PASS
DetailsJavier Guzman
1st review completed, pending Mech, 7/16 W L2 Hillside ePlan*
Routing - MECHANICAL7/21/2014 7/21/2014 PASS
DetailsTroy James
PLANS/APPL TAKEN TO FRONT DESK  7/21/2014 DONE
Routing - FIRE7/18/20147/18/20147/18/2014 PASS
DetailsScott Arellano
Approved.
Routing - MECHANICAL7/17/2014 7/17/2014 FAIL
DetailsTroy James
emailed corrections to western heating
Telephone call  7/15/2014 DONE
DetailsScott Arellano
Owner has agreed to exercise the option to fire sprinkler the home which satisfies the fire department vehicle access issue.
1st review completed  7/14/2014 FAIL
DetailsJavier Guzman
Routing - Addressing  7/14/2014 PASS
DetailsEmily Dixon
Signed off in ePlan by Emily Dixon
Routing - PLAN CHECK  7/14/2014 PASS
DetailsJavier Guzman
Routing - FIRE6/27/20146/27/20147/7/2014 FAIL
DetailsScott Arellano
See electronic changemarks for correction item. Attached plan review report to case. Emailed architect plan review report.
Routing - PUBLIC WORKS  7/1/2014 PASS
DetailsBeverly Mountain
Routing PW Grading-Hillside6/30/2014 7/1/2014 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing - MECHANICAL  7/1/2014 FAIL
DetailsTroy James
eplan
Route to Impact Fee Review6/27/20147/2/20146/30/2014 PASS
DetailsCindy M. Gould
Routing - Erosion and Sediment6/30/2014 6/30/2014 PASS
DetailsAndy J. Long
ESC site map and narrative submitted and approved. Valid RP and PD designated.
Routing - PLANNING6/27/2014 6/27/2014 PASS
DetailsColleen T Carroll
Intake Approval  6/27/2014 PASS
DetailsChristina Prado
Routing - Addressing6/27/2014 6/27/2014 PASS
DetailsEmily Dixon
Intake Approval  6/26/2014 FAIL
DetailsChristina Prado
Need - CO, smoke detectors, wall bracing, foundation stamped by engineer and address the ADU shown on plans
Application received  6/2/2014 DONE
Application submitted via PDS Online on Jun 2 2014 2:14PM