Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD14-01493
StatusFinaled
Name BRIGHTON HOMES IDAHO INC
Site Address 4115 S RIVER BASIN AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI Zone A, Class A Roof, Permit for the construction of a new 3095 sq. ft., one story single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 319 sq. ft. of covered patio/porch and a 1000 sq. ft. attached garage per the approved plans, ResCheck, Manual J and any notations. SP.02 zoning and setbacks per planning. JG
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/7/201410/7/201410/7/2014PPASS
DetailsDave Hannah
garage code is 5224 Phone #: ###-#### Inspection requested via web by Braxton Hansen
DOC - Permit Finaled10/7/201410/7/201410/7/2014PPASS
DetailsDave Hannah
BLD-Final10/6/201410/6/201410/6/2014PFAIL
DetailsPhil Shearer
Need to fire caulk the electrical in the garage.
BLD-Framing/Rough-in8/13/20148/13/20148/13/2014PPASS
DetailsPhil Shearer
Need inspection to whiteness the 2 layers of sheetrock on the soffits. So we can finish the soffits. Thank you Phone #: ###-#### Inspection requested via web by Joshua Edwards
Sheetrock on the soffits OK
BLD-Energy code compliance8/5/20148/5/20148/5/2014APASS
DetailsPhil Shearer
Inspection to view the framing corrections and insulation so we can begin sheetrocking please. As late in the morning as possible. Thank you Phone #: ###-#### Inspection requested via web by Joshua Edwards
BLD-Framing/Rough-in8/5/20148/5/20148/5/2014PPASS
DetailsPhil Shearer
Inspection to view the framing corrections and insulation so we can begin sheetrocking please. As late in the morning as possible. Thank you Phone #: ###-#### Inspection requested via web by Joshua Edwards
BLD-Energy code compliance8/4/20148/4/20148/4/2014PFAIL
DetailsPhil Shearer
Inspection to view framing corrections and insulation so we can sheet rock. Thank you Phone #: ###-#### Inspection requested via web by Joshua Edwards
BLD-Framing/Rough-in7/31/20148/1/20148/1/2014AFAIL
DetailsPhil Shearer
Framing inspection as early as possible so we can insulate. Thank you Phone #: ###-#### Inspection requested via web by Joshua Edwards
CN written
BLD-Framing/Rough-in7/31/20147/31/20147/31/2014PCANC
DetailsPhil Shearer
Framing inspection so we can insulate please. As late in afternoon as possible. Thank you Phone #: ###-#### >> Inspection requested via web by Joshua Edwards Inspection cancelled from web by: Joshua Edwards
BLD-Wall Bracing7/21/20147/21/20147/21/2014PPASS
DetailsPhil Shearer
Josh Phone #: ###-####
BLD-Foundation6/26/20146/26/20146/26/2014PPASS
DetailsDave Hannah
Doug Phone #: ###-####
BLD-Footing6/25/20146/25/20146/25/2014PPASS
DetailsJim Storey
Doug Phone #: ###-####
BLD-Footing6/24/20146/25/20146/25/2014ANR
DetailsDave Hannah
Doug Phone #: ###-####
BLD-Footing6/24/20146/24/20146/24/2014PNR
DetailsDave Hannah
Doug Phone #: ###-####
Issue PAID IN FULL permit  6/18/2014 DONE
DetailsBarbara Stitt
OVERRIDE  6/17/2014  
Telephone call  6/17/2014 DONE
DetailsBarbara Stitt
Called Seth and told him that permit is ready & fees due on 6-17-14 @ 1:30pm
Inspection Record Card- Bld  6/17/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  6/17/2014 DONE
DetailsBarbara Stitt
1st review completed  6/16/2014 DONE
DetailsJavier Guzman
Case Summary (BLD)  6/16/2014 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  6/16/2014 DONE
Plan assigned to (JG)  6/16/2014 PASS
DetailsJavier Guzman
Due 6/16 M L1* (Tisha)
Routing - PLAN CHECK6/5/2014 6/16/2014 PASS
DetailsJavier Guzman
Routing - MECHANICAL6/4/2014 6/5/2014 PASS
DetailsTroy James
Route to Impact Fee Review6/3/20146/6/20146/4/2014 PASS
DetailsCindy M. Gould
Routing - PLANNING6/4/2014 6/4/2014 PASS
DetailsSue Cummings
Routing - PUBLIC WORKS6/4/2014 6/4/2014 PASS
DetailsConnie Baumgartner
Routing - Addressing6/3/2014 6/4/2014 PASS
DetailsJason C. Taylor
Routing PW Grading-Hillside6/4/2014 6/4/2014 PASS
DetailsJason C. Taylor
This project is mapped as "In" the hillside but was partialy removed during construction of the subdivision. This parcel will require a subgrade approval and a slope setback analysis from a geotechncial engineer prior to scheduling the building department for footing inspections. Jason Taylor ###-####.
Telephone call  6/3/2014 DONE
DetailsCandy A. Nichols
called Nate to let him know Jason Taylor ok permit to be taken in with the regular permit app (#402) not the hillside.
Plans ACCEPTED BY PLAN TECH  6/3/2014 DONE
DetailsCandy A. Nichols
Intake Approval  6/3/2014 PASS
DetailsCandy A. Nichols
as per Jason Taylor-ok to take in as a regular permit not the Hillside Permit
Recd Pcfee & Taken To Pln CK  6/3/2014 DONE
DetailsCandy A. Nichols
Application received 6/3/2014