Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD14-01501
StatusFinaled
Name JAYO CONSTRUCTION
Site Address 655 E ORION DR
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI Zone A, Class A Roof, Permit for the construction of a new 3,492 sq. ft., two story (first story 2,216 sq. ft., second story 1,276 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 597 sq. ft. of covered patio/porch and a 890 sq. ft. attached garage per the approved plans, Rescheck, plan review report and any notations. A-1 zoning and setbacks per planning. JG
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/2/201512/3/201512/3/2015APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by SHANE JAYO
DOC - Permit Finaled12/3/201512/3/201512/3/2015PPASS
DetailsTony Young
c of o issued
BLD-Final12/1/201512/2/201512/2/2015ANR
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by SHANE JAYO needs hillside final and blowerdoor signoff in side is ok
Routing PW Grading-Hillside12/2/2015 12/2/2015 PASS
DetailsJim Wyllie
BLD-Framing/Rough-in4/16/20154/17/20154/17/2015APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by SHANE JAYO
BLD-Framing/Rough-in4/14/20154/15/20154/15/2015AFAIL
DetailsTony Young
Phone #: ###-#### Inspection requested via web by SHANE JAYO,, not done yet
BLD-Energy code compliance4/14/20154/14/20154/14/2015PFAIL
DetailsTony Young
Phone #: ###-#### Inspection requested via web by SHANE JAYO,, corrections not completed
BLD-Energy code compliance4/6/20154/7/20154/7/2015AFAIL
DetailsTony Young
Phone #: ###-#### Inspection requested via web by SHANE JAYO,, correction notice on truss engineering and also winder stairs need to meet code for uniform construction per R311.7.4.2
BLD-Framing/Rough-in4/1/20154/2/20154/2/2015PPART
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by SHANE JAYO. There was no truss Engineering onsite will need to check on reinspection
BLD-Conference3/31/20154/1/20154/1/2015ANR
DetailsTony Young
Phone #: ###-#### Inspection requested via web by SHANE JAYO
BLD-Conference1/15/20151/16/20151/16/2015APASS
DetailsTony Young
Mark Phone #: ###-####,, frame ?s about yhe drag strut wall,, ok per plans
BLD-Foundation12/9/201412/10/201412/10/2014APART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by SHANE JAYO,, work in progress,, ok
BLD-Footing12/8/201412/9/201412/9/2014PPART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by SHANE JAYO,, wip
BLD-Other12/5/201412/8/201412/8/2014ACANC
DetailsTony Young
Need an ESC inspection. Phone #: ###-#### Inspection requested via web by SHANE JAYO
PubWorks Subgrade Approval12/8/201412/8/201412/8/2014 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
OVERRIDE  12/5/2014  
Issue PAID IN FULL permit  12/5/2014 DONE
DetailsCandy A. Nichols
Permit Ready to Issue  12/5/2014 DONE
Extend Review Timeline  11/20/2014 DONE
DetailsChristina Prado
Expiration Notice11/14/201412/8/201411/14/2014 DONE
DetailsChristina Prado
Route to Impact Fee Review6/26/20147/1/20146/26/2014 PASS
DetailsCindy M. Gould
Telephone call  6/26/2014 DONE
DetailsCandy A. Nichols
called Stephanie to let know permit was ready-told her amount owed
Inspection Record Card- Bld  6/26/2014 DONE
DetailsBarbara Stitt
Plan assigned to (JG)6/5/20146/5/20146/25/2014 PASS
DetailsJavier Guzman
Due 6/24 T L1 Hillside**
Routing - PLAN CHECK  6/25/2014 PASS
DetailsJavier Guzman
1st review completed  6/25/2014 DONE
DetailsJavier Guzman
Case Summary (BLD)  6/25/2014 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  6/25/2014 DONE
Routing - FIRE6/17/2014 6/18/2014 PASS
DetailsScott Arellano
Approved. This residence has been evaluated for Fire Department Vehicle access.
Routing - Erosion and Sediment6/11/2014 6/17/2014 PASS
DetailsEvan Jenkins
Routing - MECHANICAL6/10/2014 6/11/2014 PASS
DetailsTroy James
Routing - PLANNING6/9/2014 6/10/2014 PASS
DetailsColleen T Carroll
Routing - Addressing6/6/2014 6/9/2014 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS6/6/2014 6/9/2014 PASS
DetailsConnie Baumgartner
Routing PW Grading-Hillside6/6/2014 6/9/2014 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.

Application received 6/3/20146/5/2014 DONE
Plans ACCEPTED BY PLAN TECH  6/5/2014 DONE
DetailsTisha Gallop
Intake Approval  6/5/2014 PASS
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  6/5/2014 DONE
DetailsTisha Gallop
Intake Approval  6/3/2014 FAIL
DetailsTisha Gallop
see checklist