BLD-Final | 3/16/2015 | 3/17/2015 | 3/17/2015 | A | PASS |
Dave Hannah
|
|
|
Perrry-called for access Phone #: ###-####
|
DOC - Permit Finaled | 3/17/2015 | 3/17/2015 | 3/17/2015 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 12/15/2014 | 12/16/2014 | 12/16/2014 | A | PASS |
Dave Hannah
|
|
|
Rocky Phone #: ###-####
|
BLD-Framing/Rough-in | 11/17/2014 | 11/17/2014 | 11/18/2014 | P | PASS |
Dave Hannah
|
|
|
Rocky Phone #: ###-####
|
BLD-Framing/Rough-in | 10/29/2014 | 10/29/2014 | 10/29/2014 | P | NR |
Phil Shearer
|
|
|
Rocky Phone #: ###-####
|
Routing Walk-In (BLD) | 9/19/2014 | 9/19/2014 | 9/19/2014 | A | PASS |
Perry Paine
|
|
|
|
BLD-Foundation | 9/15/2014 | 9/16/2014 | 9/16/2014 | A | PASS |
Dave Hannah
|
|
|
Rocky Phone #: ###-####
|
Routing Walk-In (BLD) | 9/16/2014 | 9/16/2014 | 9/16/2014 | A | PASS |
Perry Paine
|
|
|
requested to use 2x4 construction. for the addidion n /a option because there is no difficult construction at this point. suggested using 24" o.c. framing of walls. pep
|
BLD-Footing | 9/4/2014 | 9/4/2014 | 9/4/2014 | P | PASS |
Dave Hannah
|
|
|
Annie Phone #: ###-####
|
Routing Walk-In (BLD) | 9/3/2014 | 9/3/2014 | 9/3/2014 | A | PASS |
Perry Paine
|
|
|
Ok to use 2X4 wall at exterior wall at the stair and R-10 on the interior of the concrete wall. Insulation of the inside wall of the stairs can be done by insulating the foundation wall under the addition along with the addition's floor.
|
Application received | | 6/4/2014 | 6/6/2014 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/6/2014 | | DONE |
Tisha Gallop
|
|
|
|
OVERRIDE | | | 6/5/2014 | | |
|
|
|
|
Permit Ready to Issue | | | 6/5/2014 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 6/4/2014 | | |
|
|
|
|
Routing Walk-In (Zoning) | 6/4/2014 | 6/4/2014 | 6/4/2014 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 6/4/2014 | 6/4/2014 | 6/4/2014 | A | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 6/4/2014 | 6/4/2014 | 6/4/2014 | | PASS |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 6/4/2014 | | |
|
|
|
|
Permit Ready to Issue | | | 6/4/2014 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 6/4/2014 | | DONE |
|
|
|
|
1st review completed | | | 6/4/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/4/2014 | | DONE |
|
|
|
|