BLD-Footing | 9/9/2014 | 9/10/2014 | 9/10/2014 | A | PASS |
Dave Hannah
|
|
|
Request 8:00 - Eric Phone #: ###-####
|
BLD-Footing | 9/2/2014 | 9/3/2014 | 9/3/2014 | A | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Other | 8/15/2014 | 8/18/2014 | 8/18/2014 | A | PASS |
Dave Hannah
|
|
|
anytime// Scott Phone #: ###-####
|
BLD-Conference | 8/14/2014 | 8/15/2014 | 8/15/2014 | A | PASS |
Dave Hannah
|
|
|
scott Phone #: ###-####
|
BLD-Other | 7/29/2014 | 7/30/2014 | 7/31/2014 | P | DONE |
Dave Hannah
|
|
|
call before to meet // eric Phone #: ###-####
|
BLD-Footing | 7/31/2014 | 7/31/2014 | 7/31/2014 | A | PASS |
Dave Hannah
|
|
|
call before to meet // eric Phone #: ###-####
|
BLD-Footing | 7/28/2014 | 7/29/2014 | 7/29/2014 | A | PART |
Dave Hannah
|
|
|
Erick Phone #: ###-#### subgrade for art ok
|
BLD-Footing | 7/22/2014 | 7/23/2014 | 7/23/2014 | A | PASS |
Phil Shearer
|
|
|
Eric Phone #: ###-#### inspection of subgrade only
|
Plan assigned to (CDM) | 6/20/2014 | 6/20/2014 | 6/30/2014 | | PASS |
Carl D Madsen
|
|
|
ePlan review
|
Routing - PLAN CHECK | 6/20/2014 | | 6/30/2014 | | PASS |
Carl D Madsen
|
|
|
ePlan review
|
1st review completed | | | 6/30/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/30/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/30/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Issue PAID IN FULL permit | | | 6/30/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Routing - PLANNING | 6/20/2014 | | 6/27/2014 | | PASS |
Sarah Schafer
|
|
|
|
Routing - FIRE | 6/20/2014 | 6/20/2014 | 6/25/2014 | | PASS |
Craig D. Hanson
|
|
|
No Report
|
Routing PW Drainage | 6/20/2014 | | 6/24/2014 | | PASS |
Brian Murphy
|
|
|
|
Routing - Erosion and Sediment | 6/20/2014 | | 6/20/2014 | | PASS |
Evan Jenkins
|
|
|
Visited site w/ Brent on 6-20-14 to discuss replacing silt fence with compost/bark waddle. I gave him the "OK" EJ
|
Routing - Addressing | 6/20/2014 | | 6/20/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 6/20/2014 | | 6/20/2014 | | PASS |
Beverly Mountain
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/20/2014 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 6/20/2014 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/20/2014 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 6/11/2014 | | FAIL |
Tisha Gallop
|
|
|
Please resubmit with:
1. Full size engineering detail sheet for Max 9' PMA wall height (detail P on sheet L8.1).
2. Calculations for all PMA walls.
3. Engineered stamped plan and calculations for sculpture footings.
4. Erosion & Sediment control plan(s). (Full Size sheets uploaded in to "drawings folder").
5. Operation & Maintenance Manual.
6. Geotechnical report.
Please contact me if you have any questions
Tisha Gallop
City of Boise
###-#### xt. 5822
|
Meeting | | | 6/11/2014 | | DONE |
Tisha Gallop
|
|
|
Spoke with JCB, accept application as grading permit with engineered walls; assign to CDM for routing.
|
Application received | | | 6/5/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 5 2014 11:02AM
|