Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD14-01535
StatusIssued
Name WESTERN IDAHO CONSTRUCTION & LANDSC
Site Address 353 E MYRTLE ST
Project NameCancer Survivor Plaza
Customer Number 
ePlanReviewYes
Description
"CANCER SURVIVOR CENTER" Permit for the construction of new parking area, sidewalks and 7, 8, and 9 foot tall monument walls with work to include grading and drainage, general site work and sidewalks per the approved plans and the attached engineering. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Footing9/9/20149/10/20149/10/2014APASS
DetailsDave Hannah
Request 8:00 - Eric Phone #: ###-####
BLD-Footing9/2/20149/3/20149/3/2014APASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Other8/15/20148/18/20148/18/2014APASS
DetailsDave Hannah
anytime// Scott Phone #: ###-####
BLD-Conference8/14/20148/15/20148/15/2014APASS
DetailsDave Hannah
scott Phone #: ###-####
BLD-Other7/29/20147/30/20147/31/2014PDONE
DetailsDave Hannah
call before to meet // eric Phone #: ###-####
BLD-Footing7/31/20147/31/20147/31/2014APASS
DetailsDave Hannah
call before to meet // eric Phone #: ###-####
BLD-Footing7/28/20147/29/20147/29/2014APART
DetailsDave Hannah
Erick Phone #: ###-#### subgrade for art ok
BLD-Footing7/22/20147/23/20147/23/2014APASS
DetailsPhil Shearer
Eric Phone #: ###-####
inspection of subgrade only
Plan assigned to (CDM)6/20/20146/20/20146/30/2014 PASS
DetailsCarl D Madsen
ePlan review
Routing - PLAN CHECK6/20/2014 6/30/2014 PASS
DetailsCarl D Madsen
ePlan review
1st review completed  6/30/2014 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/30/2014 DONE
Permit Ready to Issue  6/30/2014 DONE
DetailsCandy A. Nichols
Issue PAID IN FULL permit  6/30/2014 DONE
DetailsCandy A. Nichols
Routing - PLANNING6/20/2014 6/27/2014 PASS
DetailsSarah Schafer
Routing - FIRE6/20/20146/20/20146/25/2014 PASS
DetailsCraig D. Hanson
No Report
Routing PW Drainage6/20/2014 6/24/2014 PASS
DetailsBrian Murphy
Routing - Erosion and Sediment6/20/2014 6/20/2014 PASS
DetailsEvan Jenkins
Visited site w/ Brent on 6-20-14 to discuss replacing silt fence with compost/bark waddle. I gave him the "OK" EJ
Routing - Addressing6/20/2014 6/20/2014 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS6/20/2014 6/20/2014 PASS
DetailsBeverly Mountain
Plans ACCEPTED BY PLAN TECH  6/20/2014 DONE
DetailsChristina Prado
Intake Approval  6/20/2014 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  6/20/2014 DONE
DetailsChristina Prado
Intake Approval  6/11/2014 FAIL
DetailsTisha Gallop
Please resubmit with:
1. Full size engineering detail sheet for Max 9' PMA wall height (detail P on sheet L8.1).
2. Calculations for all PMA walls.
3. Engineered stamped plan and calculations for sculpture footings.
4. Erosion & Sediment control plan(s). (Full Size sheets uploaded in to "drawings folder").
5. Operation & Maintenance Manual.
6. Geotechnical report.

Please contact me if you have any questions
Tisha Gallop
City of Boise
###-#### xt. 5822
Meeting  6/11/2014 DONE
DetailsTisha Gallop
Spoke with JCB, accept application as grading permit with engineered walls; assign to CDM for routing.
Application received  6/5/2014 DONE
Application submitted via PDS Online on Jun 5 2014 11:02AM