Permit Information
Permit NumberBLD14-01545
StatusFinaled
Name STS CONTRACTORS
Site Address 222 S AUTO DR
Project NameLarry Miller Service&Car Wash
Customer Number 
ePlanReviewYes
Description
Larry H. Miller - Quick Service and Car Wash Addition and Parking Lot Improvements - To demolish and remove and approximate 1,235 sq. ft., one story detail bay area and construct a new approximate 3,330 sq. ft., one story Quick Service, Storage Area and Automatic Carwash addition. This new addition is being constructed in the southeast corner of the existing 49,440 sq. ft., two story dealership building. The new addition will be constructed of masonry walls and steel roof joist with metal roof deck. This building is fully fire sprinklered. The sprinklers are used for area increase. This permit also includes the installation of a new 476 space parking lot for vehicle display and inventory. All Construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 4/17/20165/11/2016 DONE
Second Notice 2/22/20164/12/2016 DONE
Mailed 4-13-16
First Notice 2/7/20162/12/2016 DONE
sent with mail 2-16-16
Print Occupancy Form  1/28/2016 DONE
Permanent Occupancy  1/28/2016 DONE
Zoning Approval1/25/20161/25/20161/25/2016 PASS
DetailsJosh Wilson
Telephone call  1/25/2016 DONE
called Brad @ ###-#### to let know someone needs to come pick up perm c of o-talked to his assistant
BLD-Final1/21/20161/21/20161/21/2016PDONE
DetailsMike Jordan
having a hard time contacting owner-can you please go by and see if they are ready for the final? Candy. Building portion ios completed. Need zonong to sign off.
Telephone call  11/17/2015 DONE
called Bradly to let know the temp is expired and he needs to contact Jason B asap
BLD-Aging Inspection10/16/201510/16/201510/16/2015 PASS
DetailsMike Jordan
Telephone call  10/12/2015 DONE
called Bradly to let know temp c of o is expired and that someone needs to get a hold of me as soon as possible for the final inspections-told him that Mike with STS Contractors-left message
Telephone call  9/29/2015 DONE
called sts Contractors-they will have Mike call me (CAN) and let me know what's going on. STS says they did not finish the job
Telephone call  9/17/2015  
called Mike to see if they
Telephone call  9/17/2015 DONE
called Mike who will talk to Latan and see if the final is ready to be called in. He will get back to me
Temporary Occupancy6/19/20159/17/20156/19/2015 DONE
DetailsBrittany Hill
PubWorks Occupancy Approval6/19/20156/19/20156/19/2015 DONE
DetailsTiffany Lowery
BLD-Final6/16/20156/18/20156/18/2015PPART
DetailsMike Jordan
Mike Phone #: ###-####. Will be ok for perm occ. once zoning and public works signs perm.
BLD-Final5/13/20155/13/20155/14/2015PNR
DetailsMike Jordan
Mike Phone #: ###-####. Needs public works final.
PubWorks Occupancy Approval5/14/20155/14/20155/14/2015 DONE
DetailsJason C. Taylor
*TEMPORARY OCCUPANCY APPROVED** URBAN FILTERS NEEDED. Jason Taylor ###-####.
FIRE-Final Inspection5/12/20155/13/20155/13/2015APASS
DetailsKatie Marron
Fire life safety pass.
Zoning Approval Temp5/13/20155/13/20155/13/2015 PASS
DetailsJosh Wilson
90-day temp occ. landscape bond is in place. JGW 5-13-15
PubWorks Occupancy Approval5/13/20155/13/20155/13/2015 FAIL
DetailsJason C. Taylor
*NO OCCUPANCY APPROVAL**RESUBMITTAL REQUIRED** Jason Taylor ###-####.
FIRE-Final Inspection5/11/20155/11/20155/11/2015PCANC
DetailsKatie Marron
Not ready for life safety inspection per phone call.
FIRE-Final Inspection5/8/20155/8/20155/8/2015PNR
DetailsKatie Marron
Not ready for life safety. Meant to call in fire permit final.
BLD-Other4/20/20154/20/20154/20/2015PPASS
DetailsMike Jordan
Roof decking // Mike Phone #: ###-####
BLD-Foundation3/18/20153/19/20153/19/2015APASS
DetailsMike Jordan
Rebar // Mike Phone #: ###-####. Slab on grade reinforcement for wash bay ok.
BLD-Footing2/13/20152/13/20152/13/2015PPART
DetailsMike Jordan
Pouring at 1///Rebar - Mike Phone #: ###-####. Work in progress. Pending special inspection.
BLD-Footing10/15/201410/16/201410/16/2014ADEFR
DetailsMike Jordan
South parking lot light pole base - Mike Phone #: ###-####
BLD-Footing10/9/201410/10/201410/10/2014PPART
DetailsMike Jordan
Mike Phone #: ###-####. Work in progress. Will have special inspection.
Issue PAID IN FULL permit  9/29/2014 DONE
DetailsCheryl Baumgartner
Print Occupancy Form  9/29/2014 DONE
DetailsCandy A. Nichols
Telephone call  9/26/2014 DONE
DetailsCandy A. Nichols
called Mike ###-####-told him we have everything that is needed-he can come sign the permits when issued.
Telephone call  8/21/2014 DONE
DetailsTisha Gallop
per Jeanne Gage at ACHD wash bay addition and parking lot are not yet approved.
Telephone call  8/19/2014 DONE
DetailsCandy A. Nichols
called Mike Jeffries to let know we received check in mail and he could come sign the issued permit-(left message on his phone ###-####-7361) Receipt is in drawer
OVERRIDE  8/4/2014  
Permit Ready to Issue  8/4/2014 DONE
DetailsChristina Prado
Routing - PLAN CHECK7/28/2014 7/28/2014 PASS
DetailsJohn Menard
Routing Off Site - STRUCTURAL7/28/2014 7/28/2014 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  7/28/2014 DONE
DetailsJohn Menard
Plan assigned to (JCM)6/10/2014 7/28/2014 PASS
DetailsJohn Menard
1st Review Complete 6/19/2014
Routing - PLAN CHECK7/15/2014 7/23/2014 PASS
DetailsJohn Menard
Routing Off Site - STRUCTURAL7/15/2014 7/19/2014 FAIL
DetailsJohn Menard
Routing PW Environmental7/15/2014 7/15/2014 PASS
DetailsTerry Alber
Corrections to exposed drains approved.
Routing PW Environmental7/23/2014 7/15/2014 PASS
DetailsTerry Alber
Routing - PUBLIC WORKS7/15/2014 7/15/2014 PASS
DetailsBeverly Mountain
Routing - PUBLIC WORKS6/10/2014 7/15/2014 PASS
DetailsConnie Baumgartner
Routing PW Drainage6/10/2014 6/20/2014 PASS
DetailsBrian Murphy
1st review completed  6/20/2014 DONE
DetailsJohn Menard
Routing Off Site - STRUCTURAL6/10/2014 6/19/2014 FAIL
DetailsJohn Menard
Routing - PLAN CHECK6/10/2014 6/19/2014 PASS
DetailsJohn Menard
Routing - FIRE6/10/20146/10/20146/17/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review 06-17-14
Routing - PLUMBING6/10/2014 6/16/2014 PASS
DetailsDaryl Spivey
Routing - Design Review6/10/2014 6/16/2014 PASS
DetailsJosh Wilson
Routing - Erosion and Sediment6/10/2014 6/12/2014 PASS
DetailsEvan Jenkins
Routing PW Environmental6/10/2014 6/12/2014 FAIL
DetailsRick Christenson
Cover area or disconnect drain. Any sanitary sewer connected drains at entrance or exit of wash-tunnel must be covered and the pad sloped to preclude storm water/roof runoff from entering drain. Wastewater from any pre-rinse or pre-wash activities at tunnel entrance must be routed to sanitary sewer system.
Route to Impact Fee Review6/10/20146/13/20146/11/2014 PASS
DetailsCindy M. Gould
Routing PW Sewer Rating6/10/2014 6/10/2014 PASS
DetailsConnie Baumgartner
Routing - PLANNING Land Div6/10/2014 6/10/2014 PASS
DetailsDave Abo
Routing - Addressing6/10/2014 6/10/2014 PASS
DetailsEmily Dixon
Intake Approval  6/10/2014 PASS
DetailsJohn Menard
2nd plan intake review
Pending Assignment by JCM6/10/2014 6/10/2014 DONE
DetailsJohn Menard
Intake Approval  6/9/2014 FAIL
(6-9-14) Please refer to the circled items on the plan intake checklist and resolve them as specified. CJW
Application received  6/5/2014 DONE
Application submitted via PDS Online on Jun 5 2014 3:38PM