Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberBLD14-01596
StatusFinaled
Name HC COMPANY INC
Site Address 877 W MAIN ST STE Unit: 800
Project NameEide Bailly Suite 800
Customer Number 
ePlanReviewNo
Description
(EIDE BAILLY - 8TH FLOOR OF WELLS FARGO CENTER - SUITE 800) To remodel most of the 8th story for a new 14,082 square foot whole story office tenant. Interior nonstructural demolition and early start was done under permit BLD14-01616. Work is to include interior nonbearing walls, suspended acoustical ceilings, gypsum board soffits and bulkheads, interior doors, interior windows, new fire doors (including a Won-door) to maintain the elevator vestibule, new fire doors on the stairway enclosures, millwork, and finishes. The existing restrooms were upgraded to be accessible to the disabled under a previous permit. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. Quick-response sprinklers are required to be installed throughout the entire story. The fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 12/11/201412/3/2014 DONE
This permit finaled on the web by Jeremy Barber
First Notice 11/7/201412/1/2014 DONE
BLD-Final10/27/201410/28/201410/28/2014APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Jeremy Barber
FIRE-Final Inspection10/27/201410/28/201410/28/2014APASS
DetailsForrest France
Correction items verified for completion. Fire life safety final inspection passed. No signature card available on site.
Permanent Occupancy  10/28/2014 DONE
BLD-Final10/27/201410/27/201410/27/2014ACANC
DetailsDave Hannah
Tom Phone #: ###-#### Inspection cancelled from web by: Jeremy Barber
BLD-Final10/24/201410/24/201410/27/2014PCANC
DetailsDave Hannah
Tom Phone #: ###-#### Inspection cancelled from web by: Jeremy Barber
FIRE-Final Inspection10/24/201410/24/201410/24/2014PPART
DetailsForrest France
Per discussion- Contractor to install missing exit signs, adjust doors and post occupancy sign today (10/24). Okayed tenant move based on these conditions. Contractor to request final inspection Monday 10/27 AM.
FIRE-Final Inspection10/23/201410/24/201410/24/2014AFAIL
DetailsForrest France
Items noted include; missing five exit signs per plan review red-lines, relocate one exit sign, provide directional arrow at one exit sign, fire doors at three locations need adjustment to full closure, post max occupancy signage at the large conference room.
BLD-Final10/23/201410/23/201410/23/2014PCANC
DetailsDave Hannah
Tom-would like as late as possible, life safety is this afternoon as well Phone #: ###-####
Override - Parcel Holds10/23/20141/1/190010/23/2014  
LIFE SAFETY INSPEC
BLD-Ceiling Grid Inspection10/7/201410/8/201410/8/2014APASS
DetailsDave Hannah
Tom Phone #: ###-####
BLD-Ceiling Grid Inspection10/3/201410/6/201410/6/2014APASS
DetailsDave Hannah
Tom Phone #: ###-####
BLD-Ceiling Grid Inspection9/24/20149/24/20149/25/2014PPART
DetailsDave Hannah
Ed Phone #: ###-#### open office area ok to cover ceiling
BLD-Framing/Rough-in8/14/20148/15/20148/15/2014APASS
DetailsDave Hannah
tom Phone #: ###-####
BLD-Framing/Rough-in8/6/20148/6/20148/6/2014PPART
DetailsDave Hannah
Tom Phone #: ###-#### ok to cover all but plumbing wall and 8 int offices
Issue PAID IN FULL permit  7/23/2014 DONE
DetailsTisha Gallop
Plan assigned to (CJW)6/12/20146/12/20147/22/2014 PASS
DetailsCarl Westfall
EIDE BAILLY - Level 3 TI - Paper - Wells Fargo Center (15 days - July 1)
Routing - FIRE7/21/2014 7/22/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review 07-22-14
Routing - PLAN CHECK7/22/2014 7/22/2014 DONE
DetailsCarl Westfall
2nd routing completed
PLANS/APPL TAKEN TO FRONT DESK  7/22/2014 DONE
Print Occupancy Form  7/22/2014 DONE
DetailsBarbara Stitt
Permit Ready to Issue  7/22/2014 DONE
DetailsTisha Gallop
Telephone call  7/22/2014 DONE
DetailsTisha Gallop
called Sam Burrows and told him permit is ready and fee due.
Routing - PLAN CHECK7/15/2014 7/21/2014 PASS
DetailsCarl Westfall
Drawings approved after the resubmittal review
Routing - PLAN CHECK7/1/2014 7/15/2014 DONE
DetailsCarl Westfall
Waiting for the resubmittal
Plan resubmittals received  7/15/2014 DONE
DetailsChristina Prado
received two sets of revised plan sheets marked A2.1, A2.2, A3.0, M1.1, P1.1, E2.2F, E2.2L, E2.2P, E2.2S & E3.0 as well as one response letter and various revised calc sheets; Plans stamped and taken to Carl Westfall for further review
Route to Impact Fee Review7/8/20147/11/20147/11/2014 PASS
DetailsCindy M. Gould
Tenant improvement no impact fees
1st review completed  7/1/2014 FAIL
Failed: Plan Check, Fire
Routing - FIRE6/30/2014 7/1/2014 FAIL
DetailsCraig D. Hanson
See Fire Plan Review 07-01-14
Routing - PLAN CHECK6/20/2014 6/30/2014 FAIL
DetailsCarl Westfall
Revised drawings required
Routing - MECHANICAL6/16/2014 6/20/2014 PASS
DetailsTroy James
Routing PW Sewer Rating6/16/2014 6/16/2014 PASS
DetailsConnie Baumgartner
Routing - PUBLIC WORKS6/13/2014 6/16/2014 PASS
DetailsConnie Baumgartner
Routing - PLUMBING6/16/2014 6/16/2014 PASS
DetailsBill VanDegrift
Per plan and ISPC.
Routing - Addressing6/12/2014 6/13/2014 PASS
DetailsJason C. Taylor
Pending Assignment by JCB6/11/2014 6/12/2014 DONE
DetailsJason Blais
Application received 6/10/20146/11/2014 DONE
Intake Approval  6/11/2014 PASS
DetailsJason Blais
Plans ACCEPTED BY PLAN TECH  6/10/2014 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  6/10/2014 DONE
DetailsTisha Gallop