Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD14-01601
StatusFinaled
Name TALBOY CONSTRUCTION
Site Address 7293 W AIRWAY CT
Project NameCooler Installation
Customer Number 
ePlanReviewNo
Description
(NORTHWEST SPECIALTY BEVERAGE COMPANY – Beverage Cooler) C of O under BLD14-00330. This permit is for the construction of a 640 sq ft site built cooler inside a distribution warehouse. This cooler must be installed in accordance with the approved plans and redlines made within. This cooler shall meet the requirements for finish material from chapter 26 of the 2012 IBC. All foam must be protected by ½ inch gypsum or 0.032 aluminum / corrosion resistant steel. This building is fully sprinklered. Please contact Tim Frost at 384-3781 for the requirements for the fire sprinkler permits needed to extend the fire protection system into the new cooler space. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department.**TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  1/4/2016 DONE
final passed 11-12-14
Letter of compliance/Occupancy  11/20/2014 DONE
DetailsCandy A. Nichols
BLD-Final11/12/201411/12/201411/12/2014PPASS
DetailsPhil Shearer
Grant ###-#### (alt. Randy ###-####)
FIRE-Final Inspection8/26/20148/26/20148/26/2014PPASS
DetailsTroy Cobbley
life safety passed
Issue PAID IN FULL permit  7/8/2014 DONE
DetailsBarbara Stitt
Inspection Record Card- Bld  7/7/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  7/7/2014 DONE
DetailsTisha Gallop
Telephone call  7/7/2014 DONE
DetailsTisha Gallop
called and left vm permit is ready and fee due.
Plan assigned to (TLW)  7/6/2014 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK6/16/2014 7/6/2014 PASS
DetailsTim L. Woodard
Approved with redlines to Floor Plan. TLW
1st review completed  7/6/2014 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  7/6/2014 DONE
DetailsTim L. Woodard
Case Summary (BLD)  7/6/2014 DONE
DetailsTim L. Woodard
Routing - PUBLIC WORKS6/13/2014 6/16/2014 PASS
DetailsConnie Baumgartner
Routing PW Sewer Rating6/16/2014 6/16/2014 PASS
DetailsConnie Baumgartner
Routing - Addressing6/11/2014 6/13/2014 PASS
DetailsJason C. Taylor
Plans ACCEPTED BY PLAN TECH  6/11/2014 DONE
DetailsChristina Prado
Intake Approval  6/11/2014 PASS
DetailsTim L. Woodard
Recd Pcfee & Taken To Pln CK  6/11/2014 DONE
DetailsChristina Prado
Application received  6/10/2014 DONE
Application submitted via PDS Online on Jun 10 2014 3:27PM