Permit Information
Permit NumberBLD14-01616
StatusFinaled
Name HC COMPANY INC
Site Address 877 W MAIN ST
Project NameEide Bailly Early Start/ Demo
Customer Number 
ePlanReviewNo
Description
(EIDE BAILLY - Wells Fargo Building – Interior Demo / Early Start Tenant Improvement) This permit is to perform interior non-structural demo work (excluding removal of existing elevator lobby) and Partial permit work as outlined within this scope of work only. Scope of work: includes removal of non-bearing interior partition walls, removal of existing plumbing, removal of interior finishes, removal of all existing outlets and wiring back to the box or properly terminated above ceiling line, removal of some existing light fixtures, construction to the framing stage including rough-in electrical, plumbing, and mechanical while the plans for the space are being reviewed (Major TI is submitted under BLD14-01596). Any construction not meeting code must be removed prior to framing inspection approval and any further construction being endorsed. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. Do not remove ceiling unless sprinkler coverage is able to be maintained in accordance with the Boise City Fire Dept. BCC resolution 13535 11-2-10 **TLW**.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 12/11/201412/3/2014 DONE
This permit finaled on the web by Jeremy Barber
First Notice10/28/201410/28/201412/1/2014 DONE
DetailsDave Hannah
BLD-Final10/27/201410/28/201410/28/2014APASS
DetailsDave Hannah
Please call if I need to schedule any other inspections as this was only a demo permit and I have only scheduled a final with Dave to coincide with the BLDG Permit final for the space. Phone #: ###-#### Inspection requested via web by Jeremy Barber
DOC - Permit Finaled10/28/201410/28/201410/28/2014PPASS
DetailsDave Hannah
Application received 6/11/20146/12/2014 DONE
Telephone call  6/12/2014 DONE
DetailsChristina Prado
Left message with Sam advising Cert of vlaue is required in order to calculate fees and give final fee due for issuance
Permit Ready to Issue  6/12/2014 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  6/12/2014 DONE
DetailsTisha Gallop
Intake Approval  6/11/2014 PASS
DetailsTim L. Woodard
Plan assigned to (TLW)6/11/2014 6/11/2014 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK6/11/2014 6/11/2014 PASS
DetailsTim L. Woodard
1st review completed  6/11/2014 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  6/11/2014 DONE
DetailsTim L. Woodard
Case Summary (BLD)  6/11/2014 DONE
DetailsTim L. Woodard