BLD-Final | 11/5/2014 | 11/6/2014 | 11/6/2014 | A | PASS |
Jim Storey
|
|
|
Dennis-would after nine if possible Phone #: ###-####
|
DOC - Permit Finaled | 11/6/2014 | 11/6/2014 | 11/6/2014 | P | PASS |
Jim Storey
|
|
|
|
Routing Walk-In (BLD) | 9/16/2014 | 9/16/2014 | 9/16/2014 | P | PASS |
Perry Paine
|
|
|
|
BLD-Energy code compliance | 8/6/2014 | 8/6/2014 | 8/6/2014 | P | PART |
Jim Storey
|
|
|
Dennis Phone #: ###-#### pass upon hvac aproval.
|
BLD-Energy code compliance | 7/31/2014 | 8/1/2014 | 8/1/2014 | A | PART |
Jim Storey
|
|
|
Air Penetration - Dennis Phone #: ###-#### hvac insp
|
BLD-Framing/Rough-in | 8/1/2014 | 8/1/2014 | 8/1/2014 | P | PASS |
Jim Storey
|
|
|
Air Penetration - Dennis Phone #: ###-#### need hvac insp
|
Routing Walk-In (BLD) | 7/31/2014 | 7/31/2014 | 7/31/2014 | A | PASS |
Perry Paine
|
|
|
MODIFIED PERMIT TO REFLECT THE REDUCTION IN SIXE OF A WINDOW TO ALLOW FOR THE BETTER CONNECTION OF THE PATIO COVER TO THE DWELLING. ALSO ALLOW FOR THE 2ND LAYER OF DRYWALL TO BE ADDED TO TH DWELLING SEPARATION WALL DUE TO FRAMING MISS-UNDERSTANDING. ***7-31-2014 PEP
|
Inspection Record Card- Bld | | | 7/31/2014 | | |
|
|
|
|
Case Summary (BLD) | | | 7/31/2014 | | |
|
|
|
|
Extend Permit 90/180 days | 7/14/2014 | 7/14/2014 | 7/14/2014 | A | PASS |
Jim Storey
|
|
|
wall bracing ok //previous note wrong case.
|
BLD-Wall Bracing | 7/11/2014 | 7/14/2014 | 7/14/2014 | A | PASS |
Jim Storey
|
|
|
Steve Phone #: ###-#### tie down ok reviewed gaurdrail and hadrail requirments
|
Telephone call | | | 7/14/2014 | | DONE |
|
|
|
questions from inspector 301 on the requirements for ADU and DUPLEX...same ADU is for planning purposes only
|
BLD-Foundation | 7/2/2014 | 7/2/2014 | 7/2/2014 | P | PASS |
Jim Sly
|
|
|
Brian Phone #: ###-####
|
BLD-Footing | 7/1/2014 | 7/2/2014 | 7/2/2014 | A | PASS |
Jim Sly
|
|
|
Brian Phone #: ###-####
|
OVERRIDE | | | 6/23/2014 | | |
|
|
|
|
Routing Walk-In (BLD) | 6/23/2014 | 6/23/2014 | 6/23/2014 | A | PASS |
Javier Guzman
|
|
|
|
Plan assigned to (PEP) | 6/12/2014 | 6/12/2014 | 6/23/2014 | | PASS |
Perry Paine
|
|
|
|
Routing - PLAN CHECK | 6/23/2014 | | 6/23/2014 | | PASS |
Javier Guzman
|
|
|
|
Inspection Record Card- Bld | | | 6/23/2014 | | DONE |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 6/23/2014 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/23/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/23/2014 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/23/2014 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 6/20/2014 | 6/20/2014 | 6/20/2014 | P | FAIL |
Perry Paine
|
|
|
|
1st review completed | | | 6/20/2014 | | FAIL |
|
|
|
need floor plan of existing
|
Routing - PLAN CHECK | 6/20/2014 | | 6/20/2014 | | FAIL |
Perry Paine
|
|
|
|
Routing - MECHANICAL | 6/17/2014 | | 6/20/2014 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 6/16/2014 | | 6/17/2014 | | PASS |
Joshua Johnson
|
|
|
CAA14-121 Josh J.
|
Routing - PUBLIC WORKS | 6/12/2014 | | 6/16/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 6/12/2014 | | 6/13/2014 | | PASS |
Jason C. Taylor
|
|
|
Added address fro ADU as per Boise City Ordinance. JCT
|
Application received | | 6/12/2014 | 6/12/2014 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/12/2014 | | DONE |
Tisha Gallop
|
|
|
|
Plan resubmittals requested | | | | | DONE |
|
|
|
|