Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD14-01628
StatusFinaled
Name RUSSELL CONSTRUCTION INC
Site Address 5500 S FEDERAL WAY
Project NameORE PAC
Customer Number 
ePlanReviewNo
Description
(ORE PAC - Warehouse Expansion) MODIFICATION TO ADD A 2,277 SQ. FT. CANOPY TO THE SOUTH SIDE AND TWO 280 SQ. FT. CANOPIES TO THE NORTH SIDE OF THE BUILDING. For the construction of a 43,719 sq. ft. addition to an existing 63,833 sq. ft. warehouse/manufacturing/office building with work to include the construction of a new 43,719 sq. ft. steel building per the approved plans and the removal of the wall on the east end of the existing structure. Under BLD13-03145 a three hour wall was required on the north side along with three hour opening protectives since the separatin distance to the ajacent building to the north is less than 60' and this is an unlimited area building. The outside of the 3 hour assembly was not required to be completed untill construction of this addition commenced. The exterior portion of the three hour assembly on the existing building is required to be completed prior to occupancy of the addition. NO RACKING IS ALLOWED UNDER THIS PERMIT. ANY RACKING OVER 8 FEET IN HEIGHT REQUIRES A SEPARATE RACKING PERMIT. This is a fully sprinklerd buiding for unlimited area with an alarm system; any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 and 72 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 9/25/201510/12/2015 DONE
Mailed 10-13-15
Telephone call  10/5/2015 DONE
Left a message for Norman on Friday about 9am and today, 1pm, to double check the value that was given for the ELE value. Jumped up by 72,403 from what the inital value was
Print Statement  10/2/2015 DONE
First Notice 8/31/20159/15/2015 DONE
Mailed 9/16/15
FIRE-Final Inspection8/21/20158/21/20158/21/2015APASS
DetailsJim Page
Life fire safety passed/complete
BLD-Final8/20/20158/21/20158/21/2015APASS
DetailsDave Hannah
Hello Jim, We are ready for final. Please call before heading to job if possible. thank you and see you tomorrow. Phone #: ###-#### Inspection requested via web by Derek Jackson
Permanent Occupancy  8/21/2015 DONE
BLD-Final8/6/20158/7/20158/7/2015PNR
DetailsJim Storey
Looking for final in the early afternoon 2:00ish after the Fire has passed.
Thanks Jim Phone #: ###-#### Inspection requested via web by Derek Jackson
BLD-Final5/8/20155/8/20155/8/2015PDONE
DetailsJim Storey
Thank you again Jim.. Phone #: ###-#### Inspection requested via web by Derek Jackson
BLD-Final5/6/20155/7/20155/8/2015PPASS
DetailsJim Storey
Jim I am hoping to get my final shortly after lunch if that works for you. Kathy needs to inspect Fire Life/ Safety in the morning first.
Thank you
Derek Phone #: ###-#### Inspection requested via web by Derek Jackson temp ok pending all others.
FIRE-Final Inspection5/6/20155/7/20155/7/2015APART
DetailsKatie Marron
Partial fire life safety pass for new portion of building. Items to fix before final: new inspection tags on 2 fire extinguishers, hang fire extinguisher located by electrical panels, complete install of emergency exit sign at side middle door, and fix back middle door that is jammed. Permit cannot be finaled until fire suppression tie in of existing building system is completed.
PubWorks Occupancy Approval4/9/20154/9/20154/9/2015 DONE
DetailsTiffany Lowery
BLD-Conference4/2/20154/3/20154/3/2015APASS
DetailsJim Storey
Would like to meet to go over project for final.
Thanks Jim... Phone #: ###-#### Inspection requested via web by Derek Jackson 10:00 appt.
BLD-Conference4/1/20154/2/20154/2/2015ADEFR
DetailsJim Storey
Would like to meet to go over project for final.
Thanks Jim... Phone #: ###-#### Inspection requested via web by Derek Jackson
BLD-Framing/Rough-in2/11/20152/12/20152/12/2015APASS
DetailsJim Storey
Framing inspection on riser room walls. corrections made.

Thank you Jim Phone #: ###-#### Inspection requested via web by Derek Jackson
BLD-Conference2/3/20152/4/20152/4/2015AFAIL
DetailsJim Storey
framing inspection for riser room at North East corner of building.
Phone #: ###-#### Inspection requested via web by Derek Jackson
BLD-Wall cover1/5/20151/5/20151/5/2015PPASS
DetailsJim Storey
I am not on site but the wall in need of inspection is located on the south east corner where the overhang is. 3 hour fire wall same as the main fire wall that you have inspected.

Thanks Phone #: ###-#### Inspection requested via web by Derek Jackson
BLD-Framing/Rough-in1/5/20151/5/20151/5/2015PPASS
DetailsJim Storey
I am not on site but the wall in need of inspection is located on the south east corner where the overhang is. 3 hour fire wall same as the main fire wall that you have inspected.

Thanks Phone #: ###-#### Inspection requested via web by Derek Jackson
BLD-Energy code compliance12/19/201412/19/201412/19/2014PPASS
DetailsJim Storey
Insulation inspection on North wall were the roll up door was removed. This location is where the existing and the new come together.

\Thank you
Derek Phone #: ###-#### Inspection requested via web by Derek Jackson
BLD-Wall cover12/19/201412/19/201412/19/2014PPASS
DetailsJim Storey
drywall inspection where the existing roll up door was removed on the North wall where the new addition and existing building come together. This is a continuation of what was already inspected on the other section of wall.

Thank you!
Derek Phone #: ###-#### Inspection requested via web by Derek Jackson
BLD-Framing/Rough-in12/19/201412/19/201412/19/2014PPASS
DetailsJim Storey
Framing inspection where the existing roll up door was removed on the North wall where the new addition and existing building come together. This is a continuation of what was already inspected on the other section of wall.

Thank you!
Derek Phone #: ###-#### Inspection requested via web by Derek Jackson
BLD-Wall cover12/12/201412/12/201412/12/2014PPASS
DetailsJim Storey
Outside East exterior wall. I missed the am inspection dead line however we are ready to side now. I thought this was passed but noticed the inspection said partial. Thank you again Phone #: ###-#### Inspection requested via web by Derek Jackson
BLD-Energy code compliance12/10/201412/10/201412/10/2014PPASS
DetailsDave Hannah
Second half of insulation inspection. Thank you Mike. Phone #: ###-#### Inspection requested via web by Derek Jackson
BLD-Energy code compliance12/4/201412/4/201412/4/2014PPART
DetailsMike Jordan
Looking for insulation cover inspection. Phone #: ###-#### Inspection requested via web by Derek Jackson. 5 inch mineral wool insulation at 3hr. firewall, south east half only.
BLD-Wall cover11/26/201411/26/201411/27/2014PPART
DetailsMike Jordan
East wall first layer of drywall inspection on 3 hour wall. Call if there is any issues and thank you. Hope you have a good Thanksgiving Phone #: ###-#### Inspection requested via web by Derek Jackson. wip.
BLD-Framing/Rough-in11/12/201411/13/201411/13/2014APASS
DetailsJim Storey
###-#### Inspection requested via web by Derek Jackson
BLD-Framing/Rough-in11/7/201411/10/201411/12/2014PDEFR
DetailsJim Storey
Looking for a framing inspection for the East wall new framing. I will not be on site so if you need access to the plans there is a lock box on trailer hand rail and the combo is my last four digits of my phone number. 6692 Thank you again,
Derek Jackson Phone #: ###-#### Inspection requested via web by Derek Jackson
BLD-Framing/Rough-in10/20/201410/20/201410/20/2014PPASS
DetailsJim Storey
Second layer of drywall to be inspected on existing building. Phone #: ###-#### Inspection requested via web by Derek Jackson
BLD-Framing/Rough-in10/9/201410/13/201410/13/2014APART
DetailsJim Storey
This is for the drywall inspection that we talked about on Thursday. See you Monday. Thank you
503*###-#### Phone #: ###-#### Inspection requested via web by Derek Jackson 3hr 1st later ok
BLD-Framing/Rough-in10/8/201410/9/201410/9/2014APART
DetailsJim Storey
Spoke with Jim Storey about a am inspection.
Please give me a 30 minute call ahead if possible.
Thank you Phone #: ###-#### Inspection requested via web by Derek Jackson sfd in place ok 3 layer membrane.
BLD-Framing/Rough-in10/6/201410/7/201410/7/2014AFAIL
DetailsJim Storey
Vic Phone #: ###-#### arch to address opening protrction and wall listing.
CHANGE STATUS TO (ISS)  9/17/2014 DONE
DetailsChristina Prado
(F) Reprint permit  9/17/2014 DONE
DetailsChristina Prado
OVERRIDE  9/16/2014  
Telephone call  9/16/2014 DONE
DetailsTisha Gallop
called Tom Micklich and told him plan mod is ready, and fee due.
Permit Ready to Issue  9/16/2014 DONE
DetailsTisha Gallop
Plan Modification ready. The Cert of Value submitted by the General Contractor at permit issuance included the value of the canopies for total project value of $225,000. The Cert of value submitted by the Architect with the plan mod was incorrect per RockyTowle at Design Resources.
Route to Impact Fee Review9/15/20149/18/20149/15/2014 PASS
DetailsCindy M. Gould
Routing - PLAN CHECK9/15/2014 9/15/2014 PASS
DetailsCarl D Madsen
Routing - PLANNING9/15/2014 9/15/2014 PASS
DetailsJosh Wilson
Ok per DRH14-00331
Routing - PLAN CHECK9/15/2014 9/15/2014 PASS
DetailsCarl D Madsen
Case Summary (BLD)  9/15/2014 DONE
PLANS/APPL TAKEN TO FRONT DESK  9/15/2014 DONE
Print Occupancy Form  9/15/2014 DONE
DetailsCandy A. Nichols
Plan resubmittals received  9/12/2014 DONE
DetailsChristina Prado
Received two sets of revised plan sheets marked A0.0, A0.1, A1.0, A1.1, A1.3, A2.1 & A2.2;Plans stamped and taken to carl Madsen for further review
Routing - PLAN CHECK9/3/2014 9/4/2014 FAIL
DetailsCarl D Madsen
The 3 hour wall is required to extend at the canopy overhang.
Plan Modification Accepted  9/3/2014 DONE
DetailsCandy A. Nichols
received plan mod-took to CDM
Issue PAID IN FULL permit  8/18/2014 DONE
DetailsBarbara Stitt
OVERRIDE  8/14/2014  
Telephone call  8/14/2014 DONE
DetailsTisha Gallop
epmailed Anglea Waller with Russell Construction, permit fees due and need RP
Print Occupancy Form  8/14/2014 DONE
DetailsTisha Gallop
Routing - PLAN CHECK  8/14/2014 PASS
DetailsCarl D Madsen
Plan assigned to (CDM)6/16/2014 8/14/2014 PASS
DetailsCarl D Madsen
Ore Pac Warehouse Expansion
Routing Off Site - STRUCTURAL7/17/2014 8/14/2014 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK8/14/2014 8/14/2014 PASS
DetailsCarl D Madsen
Case Summary (BLD)  8/14/2014 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/14/2014 DONE
Permit Ready to Issue  8/14/2014 DONE
DetailsTisha Gallop
Routing - FIRE8/13/20148/13/20148/13/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review Rev 1 08-13-14
Routing - PLANNING8/12/2014 8/13/2014 PASS
DetailsJosh Wilson
DRH14-00043
Plan resubmittals received  8/12/2014 DONE
DetailsTisha Gallop
received two copies of plan sheets E1.0 & E2.0; taken to Carl Madsen.
Routing - PLAN CHECK7/22/2014 8/12/2014 PASS
DetailsCarl D Madsen
Plan resubmittals received  8/6/2014 DONE
DetailsChristina Prado
Received two sets of revised plan sheets marked A0.0, A0.1, A1.0, A1.1, A1.3, A3.1, E1.0, E2.0 & EN1.1 as well as two copies of response letter, plan review reports, details and email threads;Plans stamped and taken to Carl Westfall for review
Route to Impact Fee Review7/31/20148/5/20148/1/2014 PASS
DetailsCindy M. Gould
please verify fees are correct
Route to Impact Fee Review7/30/20148/2/20147/30/2014 PASS
DetailsCindy M. Gould
Routing - FIRE7/18/2014 7/22/2014 FAIL
DetailsCraig D. Hanson
See Fire Plan Review 07-22-14
1st review completed  7/22/2014 FAIL
Failed: Fire, Plan Check, Structural,
Plan resubmittals received  7/18/2014 DONE
DetailsCandy A. Nichols
received 2 sets of each: comment sheet, A0.0, A1-0, A1.1, A3.1-took to CDM
Routing - PLAN CHECK7/7/2014 7/18/2014 FAIL
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL6/16/2014 7/18/2014 FAIL
DetailsCarl D Madsen
Telephone call  7/17/2014 DONE
DetailsTisha Gallop
called Action Couriers for pick up
Plan resubmittals received  7/16/2014 DONE
DetailsTisha Gallop
received structural reveiw comments and three copies of plan sheets S0.1, S0.2, S1.1, and foundation detail plan sheet; taken ot Carl Madsen
Routing - PUBLIC WORKS7/3/2014 7/7/2014 PASS
DetailsBeverly Mountain
Routing PW Drainage7/3/2014 7/3/2014 PASS
DetailsBrian Murphy
Routing - PUBLIC WORKS6/17/2014 6/18/2014 FAIL
DetailsConnie Baumgartner
Failed by Brian Murphy for drainage issues.
Routing - Erosion and Sediment6/18/2014 6/18/2014 PASS
DetailsEvan Jenkins
Routing PW Drainage6/17/2014 6/18/2014 FAIL
DetailsBrian Murphy
need calcs for warehouse not lean to
Routing PW Sewer Rating6/17/2014 6/17/2014 PASS
DetailsJennifer Bruner
Routing - Addressing  6/17/2014 PASS
DetailsJason C. Taylor
Routing - PLANNING Land Div6/16/2014 6/16/2014 PASS
DetailsLeon Letson
Telephone call  6/16/2014 DONE
DetailsChristina Prado
called action courier for pick up
Routing - PLANNING Land Div6/16/2014 6/16/2014 PASS
DetailsLeon Letson
Plans ACCEPTED BY PLAN TECH  6/13/2014 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  6/13/2014 DONE
DetailsTisha Gallop
Application received 6/12/2014   
Pending Assignment by JCM6/13/2014    
DetailsJohn Menard