Permit Information
Permit NumberBLD14-01641
StatusFinaled
Name THE RUSSELL CORPORATION
Site Address 2350 S BROADWAY AVE
Project NamePioneer Federal Credit Union
Customer Number 
ePlanReviewNo
Description
Pioneer Federal Credit Union - For the construction of a new 6,623 sq. ft. wood framed building including a 1,080 sq. ft. canopy and a 586 sq. ft.basement work to include general site work, utilities and building construction to include all interior improvements per the approved plans, attached engineering and any notations. CDM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  1/6/2015 DONE
First Notice 12/29/20141/2/2015 DONE
BLD-Final12/19/201412/19/201412/19/2014PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Final12/18/201412/19/201412/19/2014APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Jared Waggoner
Permanent Occupancy  12/19/2014 DONE
FIRE-Final Inspection12/18/201412/18/201412/18/2014PPASS
DetailsForrest France
C/N items verified. Life safety finaled.
Zoning Approval12/18/201412/18/201412/18/2014 DONE
DetailsAndrea Tuning
FIRE-Final Inspection12/16/201412/17/201412/17/2014AFAIL
DetailsTroy Cobbley
Provide fire dept access signage at entrance as discussed, provide additional fire extinguisher in basement, remove deadbolt from interior door, provide remote annunciator/testing of the duct smoke detector.
PubWorks Occupancy Approval12/15/201412/15/201412/15/2014 DONE
DetailsTiffany Lowery
BLD-Ceiling Grid Inspection11/18/201411/18/201411/18/2014PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Ceiling Grid Inspection11/12/201411/13/201411/13/2014ANR
DetailsMike Jordan
please park at the nail salon next door Phone #: ###-#### Inspection requested via web by Jared Waggoner. Needs electrical and mech. rough in inspections first.
BLD-Energy code compliance10/14/201410/15/201410/15/2014PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Energy code compliance10/13/201410/14/201410/14/2014PPART
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Jared Waggoner north side ok
BLD-Energy code compliance10/10/201410/13/201410/13/2014APART
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Jared Waggoner air seal ok
BLD-Energy code compliance10/13/201410/13/201410/13/2014APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Jared Waggonerairseal ok
BLD-Framing/Rough-in10/9/201410/10/201410/10/2014PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Framing/Rough-in10/7/201410/8/201410/8/2014PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Jared Waggoner exterior
BLD-Wall Bracing10/8/201410/8/201410/8/2014PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Jared Waggoner ok to cover exterior/ 316 aproved soffit framing for cover.
BLD-Framing/Rough-in10/1/201410/2/201410/2/2014APART
DetailsJim Sly
Drive through canopy roof nailing inspection, exterior soffit framing Phone #: ###-#### Inspection requested via web by Jared Waggoner
OK
BLD-Concrete9/30/20149/30/20149/30/2014PPART
DetailsJim Sly
reinforcing inspection of fence CMU pilasters prior to grout at 3pm. Phone #: ###-#### Inspection requested via web by Jared Waggoner
OK.
BLD-Framing/Rough-in9/29/20149/30/20149/30/2014PPART
DetailsJim Sly
Roof Framing for cover Phone #: ###-#### Inspection requested via web by Jared Waggoner
Roof nailing and fence pilasters......OK.
BLD-Foundation9/12/20149/15/20149/15/2014APASS
DetailsJim Storey
Inspection of below grade concrete related to CMU fence pilasters.
Requested time 11am.
Will call concrete for 1pm Phone #: ###-#### Inspection requested via web by Jared Waggoner depth and rebar ok
BLD-Concrete9/8/20149/9/20149/9/2014PPASS
DetailsJim Storey
Energy inspection at below grade (underslab) and reinforced slab on deck.
Concrete slab poured 9/10 at 6am with special inspection. Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Foundation9/5/20149/8/20149/8/2014APASS
DetailsJim Storey
Concrete column piers in drive through and trash enclosure walls.
Concrete onsite at 8:45am. Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Footing9/3/20149/4/20149/4/2014APASS
DetailsJim Storey
request 11am // Jared Phone #: ###-#### pad ft for drive thru placed with si ok
BLD-Energy code compliance8/28/20148/29/20148/29/2014APASS
DetailsJim Storey
Foundation wall vertical only subgrade 2" rigid insulation Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Foundation8/26/20148/27/20148/27/2014APASS
DetailsJim Storey
Please arrive around 11am for inspection.
Concrete is expected at 1:30pm same day. Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Footing8/21/20148/21/20148/21/2014PPASS
DetailsPhil Shearer
Exterior building footing
BLD-Footing8/21/20148/21/20148/21/2014PDEFR
DetailsJim Storey
Jared Phone #: ###-####to 470
BLD-Foundation8/1/20148/1/20148/1/2014PPASS
DetailsJim Storey
Basement wall reinforcing inspection. Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Footing7/24/20147/25/20147/25/2014APASS
DetailsPhil Shearer
Jared Phone #: ###-####
Basement footings
OVERRIDE  7/24/2014  
Telephone call  7/24/2014 DONE
DetailsCandy A. Nichols
called Larry-left message telling him permit is ready and how much is owed
Issue PAID IN FULL permit  7/24/2014 DONE
DetailsCandy A. Nichols
Routing - PLAN CHECK7/23/2014 7/24/2014 PASS
DetailsCarl D Madsen
Case Summary (BLD)  7/24/2014 DONE
PLANS/APPL TAKEN TO FRONT DESK  7/24/2014 DONE
Print Occupancy Form  7/24/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  7/24/2014 DONE
DetailsCandy A. Nichols
Plan assigned to (CDM)6/16/2014 7/24/2014 PASS
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL  7/24/2014 FAIL
Routing Off Site - STRUCTURAL7/8/2014 7/24/2014 FAIL
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL7/17/2014 7/24/2014 PASS
DetailsCarl D Madsen
Resubs on 7/17
Routing - FIRE7/22/20147/22/20147/23/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review Rev 1 07-23-14
Route to Impact Fee Review7/18/20147/21/20147/22/2014 PASS
DetailsJames McMahon
IF's assessed by C. Gould
Routing - PLUMBING7/16/2014 7/22/2014 PASS
DetailsBill VanDegrift
per plan and ISPC.
Plan resubmittals received  7/17/2014 DONE
DetailsChristina Prado
Received three sets of revised plan sheets marked A0, A1.0, A3.0, A4.0, A6.2, A8.0, A9.0, A10.0, A10.1, A10.02 & P2.12 as well as one each response letter for Carl Madsen & Craig Hansen, Revised Fire flow sheet, structural notations and one complate set of civil revisions marked C1, C2, C3 & C4; Plans stamped and taken to Carl Madsen for further review
Routing PW Drainage7/15/2014 7/16/2014 PASS
DetailsBrian Murphy
Routing - PUBLIC WORKS7/16/2014 7/16/2014 PASS
DetailsBeverly Mountain
Routing - PUBLIC WORKS7/15/2014 7/16/2014 PASS
DetailsBeverly Mountain
Routing PW Street Lights6/19/2014 7/15/2014 PASS
DetailsMike D Hedge
No lights required per Rob B. bam
Routing - FIRE7/14/2014 7/15/2014 FAIL
DetailsCraig D. Hanson
See Fire Plan Review 07-15-14
1st review completed  7/15/2014 FAIL
Failed: PW, Plan Check, Fire Plumbing
Routing - PLAN CHECK6/24/2014 7/14/2014 FAIL
DetailsCarl D Madsen
Plan review sent to Larry Knopp 7-14-14 CDM
Plan resubmittals received  7/10/2014 DONE
DetailsCandy A. Nichols
2 sets of revised erosion narratives were resubmitted -took to Carl M
Additional plans submitted  7/9/2014 DONE
DetailsTisha Gallop
received third copy of structural calcs and plans; taken to Carl Madsen
Telephone call  7/8/2014 DONE
DetailsCandy A. Nichols
talked to Bell @ Action Couriers for pick up
Plan resubmittals received  7/3/2014 DONE
DetailsCandy A. Nichols
received sets of each-sheets A2.0, A2.1, A4.0, A4.1, A6.2-2, 2 sets of struc calcs from Wolfe Engineering-took to John M.
Plan resubmittals received  7/2/2014 DONE
DetailsChristina Prado
Received five revised sets of plan sheets matked Site Grading, Utility Plan as well as one O & M maintenance Description;Plans taken to carl for further review
Plan resubmittals received  6/27/2014 DONE
DetailsCandy A. Nichols
2 sheets of P2.11 resubmitted-took to CDM
Routing - PLANNING6/24/2014 6/24/2014 PASS
DetailsAndrea Tuning
Routing - PLUMBING6/20/2014 6/24/2014 FAIL
DetailsBill VanDegrift
plumbing plans shows roof drainage to a site system- civil shows no site system
Routing - Erosion and Sediment6/19/2014 6/20/2014 PASS
DetailsEvan Jenkins
Construction of New Pioneer Fed. Credit Union.
Approx: 40,000 Sq. Ft.
Routing - PUBLIC WORKS6/17/2014 6/19/2014 FAIL
DetailsBeverly Mountain
Routing PW Solid Waste6/19/2014 6/19/2014 PASS
DetailsPeter J. McCullough
Routing PW Sewer Rating6/17/2014 6/17/2014 PASS
DetailsJennifer Bruner
Routing - Addressing6/16/2014 6/17/2014 PASS
DetailsJason C. Taylor
Routing PW Sewer Design6/17/2014 6/17/2014 PASS
DetailsKyle S. Rosenmeyer
Show sewer connection as connection to existing service stub.
Routing - PLANNING Land Div6/16/2014 6/16/2014 PASS
DetailsDave Abo
Lot 1, Block 1 of Carnation Townhouse Subdivision.
Plans ACCEPTED BY PLAN TECH  6/13/2014 DONE
DetailsCandy A. Nichols
Intake Approval  6/13/2014 PASS
DetailsCandy A. Nichols
Recd Pcfee & Taken To Pln CK  6/13/2014 DONE
DetailsCandy A. Nichols
Application received 6/13/2014   
Telephone call     
DetailsCandy A. Nichols
called Action Currier to pick up plans 6-16-14
Pending Assignment by JCM6/16/2014    
DetailsJohn Menard
Routing PW Drainage6/17/2014   FAIL
DetailsBrian Murphy
needs monitoring well