Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD14-01650
StatusFinaled
Name ESI
Site Address 2771 S BEVERLY ST
Project NameProject Beverly - Shop
Customer Number 
ePlanReviewYes
Description
(SHOP/WAREHOUSE - BUILDING #2) To construct a new 10,125 square foot, one story pre-engineered metal shop / warehouse building with a 1,445 square foot, unoccupied mezzanine and related site improvements. This building is going to be used for the storage of parts and tools used in construction. Also the two end bays are used for the storage of vehicles. There is also a break room and restroom area. The mezzanine floor load is only designed for office use. A separate tenant improvement permit is required to finish the mezzanine for office occupancy. The building will have a slab on grade floor with metal walls and roof. The building will be fire sprinkled. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 6/14/20156/17/2015 DONE
This permit finaled on the web by Penny Dennis
Second Notice 5/14/20156/9/2015 DONE
sent in mail
First Notice 3/20/20155/4/2015 DONE
DetailsCandy A. Nichols
mailed first notice 5-4-15
Case Summary (BLD)  3/30/2015 DONE
Permanent Occupancy  3/10/2015 DONE
Zoning Approval3/5/20153/5/20153/5/2015 PASS
DetailsJosh Wilson
Ok for final on this building. Landscaping must be completed prior to occupancy sign off of office building.
BLD-Final3/3/20153/4/20153/4/2015APASS
DetailsPhil Shearer
Shop blg Phone #: ###-#### Inspection requested via web by Murph Naughtin
FIRE-Final Inspection3/2/20153/2/20153/3/2015PPASS
DetailsTroy Cobbley
life safety passed
OVERRIDE  2/27/2015  
CHANGE STATUS TO (ISS)  2/27/2015 DONE
DetailsChristina Prado
(F) Reprint permit  2/27/2015 DONE
DetailsChristina Prado
Routing PW Sewer Rating2/20/2015 2/27/2015 PASS
DetailsJennifer Bruner
Routing - PLAN CHECK2/27/2015 2/27/2015 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  2/27/2015 DONE
DetailsJohn Menard
Permit Ready to Issue  2/27/2015 DONE
DetailsChristina Prado
****DO NOT RE-ISSUE****
All requirements met, fees need to be paid to change status back to ISS
Plan assigned to (JCM)2/10/2015 2/27/2015 PASS
DetailsJohn Menard
Plan Modification
Routing - PLAN CHECK2/20/2015 2/27/2015 FAIL
DetailsJohn Menard
Routing - FIRE2/20/2015 2/26/2015 PASS
DetailsScott Arellano
Attached comments to plans.
Routing Off Site - STRUCTURAL2/20/2015 2/23/2015 PASS
DetailsJohn Menard
Routing - FIRE2/10/2015 2/18/2015 PASS
DetailsScott Arellano
No change from previous review.
Routing - PLAN CHECK2/10/2015 2/11/2015 FAIL
DetailsJohn Menard
BLD-Wall cover2/5/20152/5/20152/5/2015PPASS
DetailsPhil Shearer
Hard lid and wall cover @ Mezzanine in Shop- building #2 Phone #: ###-#### Inspection requested via web by Philip Allen Pending HVAC inspection
Plan Modification Accepted  2/3/2015 DONE
Work flow started for plan mod from 2B to 5B construction
BLD-Framing/Rough-in1/28/20151/29/20151/29/2015APART
DetailsJim Sly
Shop building framing for demising wall and mezzanine. Phone #: ###-#### Inspection requested via web by Philip Allen
Appears OK Note 1hr walls at stairs and riser room........walk thru ......OK to 1 side Need all trade rough-in approvals.
BLD-Concrete1/7/20151/8/20151/8/2015PPASS
DetailsPhil Shearer
Pre- concrete rebar for Slab on Deck for Mezzanine @ Shop Phone #: ###-#### Inspection requested via web by Philip Allen. Per MTI inspection.
BLD-Concrete12/5/201412/8/201412/8/2014APASS
DetailsPhil Shearer
Pre- concrete for shop. Phone #: ###-#### Inspection requested via web by Philip Allen
BLD-Foundation10/17/201410/20/201410/20/2014APART
DetailsJim Storey
Concrete at 2:30 Phone #: ###-#### Inspection requested via web by Kevin Honeycutt wip si to verify rebar.
BLD-Foundation10/8/201410/9/201410/9/2014PPASS
DetailsPhil Shearer
OK per MTI's approval
Issue PAID IN FULL permit  9/24/2014 DONE
DetailsChristina Prado
Print Occupancy Form  9/24/2014 DONE
DetailsChristina Prado
OVERRIDE  9/23/2014  
Permit Ready to Issue  9/23/2014 DONE
DetailsCandy A. Nichols
PLANS/APPL TAKEN TO FRONT DESK  9/12/2014 DONE
DetailsJohn Menard
Plan assigned to (JCM)7/10/2014 9/12/2014 PASS
DetailsJohn Menard
1st Review Complete 7/28/2014
Routing - PLAN CHECK9/10/2014 9/12/2014 PASS
DetailsJohn Menard
Routing - PUBLIC WORKS9/10/2014 9/11/2014 PASS
DetailsBeverly Mountain
Routing Off Site - STRUCTURAL9/10/2014 9/11/2014 PASS
DetailsJohn Menard
Routing PW Street Lights9/10/2014 9/11/2014 PASS
DetailsMike D Hedge
Plan resubmittals requested  9/4/2014 DONE
DetailsJohn Menard
E-mailed the applicant a copy of the structural review requesting revisions. JCM
Routing - PLAN CHECK8/25/2014 9/4/2014 PASS
DetailsJohn Menard
Routing PW Sewer Design8/25/2014 9/2/2014 PASS
DetailsKyle S. Rosenmeyer
Routing Off Site - STRUCTURAL8/25/2014 9/2/2014 FAIL
DetailsJohn Menard
Routing - FIRE8/25/2014 8/29/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review Rev 1 08-29-14
Routing PW Drainage8/25/2014 8/27/2014 CANC
DetailsBrian Murphy
Project approved under Permit BLD14-02138 (ODI-3324) JCT.
Routing PW Street Lights8/25/2014 8/27/2014 FAIL
DetailsMike D Hedge
Routing - PUBLIC WORKS8/25/2014 8/25/2014 PASS
DetailsBeverly Mountain
Routing - PLAN CHECK7/10/2014 7/29/2014 FAIL
DetailsJohn Menard
1st review completed  7/28/2014 DONE
DetailsJohn Menard
Routing - Design Review7/10/2014 7/22/2014 PASS
DetailsJosh Wilson
Ok per revised sheet L1.0 received 7-22-14
Routing - FIRE7/10/20147/10/20147/18/2014 FAIL
DetailsCraig D. Hanson
See Fire Plan Review 07-18-14
Routing Off Site - STRUCTURAL7/10/2014 7/18/2014 FAIL
DetailsJohn Menard
Routing PW Sewer Design7/10/2014 7/17/2014 FAIL
DetailsKyle S. Rosenmeyer
Utilize existing 8" sewer stub if possible. If not:
Contact April Wing at Boise Public Works to obtain manhole number for new public manhole. New manhole required to have a precast base per SD-501A. Contact Public Works 48 hours prior to sewer work in public R/W and obtain tap permit. Existing sewer line must be Re-CCTV'd up and down stream of new manhole and video submitted to Boise Public Works. Show all inverts for SSMH#1, match crowns of different sized pipe.
Routing PW Drainage7/10/2014 7/15/2014 FAIL
DetailsBrian Murphy
roof bld 3 , no no construction note
Routing PW Solid Waste7/10/2014 7/14/2014 PASS
DetailsPeter J. McCullough
Routing PW Environmental7/10/2014 7/14/2014 PASS
DetailsRick Christenson
Route to Impact Fee Review7/10/20147/15/20147/11/2014 PASS
DetailsCindy M. Gould
Routing - PLANNING Land Div7/10/2014 7/11/2014 PASS
DetailsDave Abo
Routing - Addressing7/10/2014 7/10/2014 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS7/10/2014 7/10/2014 PASS
DetailsBeverly Mountain
Routing - Erosion and Sediment7/10/2014 7/10/2014 PASS
DetailsEvan Jenkins
Routing PW Street Lights7/10/2014 7/10/2014 FAIL
DetailsMike D Hedge
Required street lighting missing from drawings.
Routing - PLUMBING7/10/2014 7/10/2014 PASS
DetailsDaryl Spivey
3" min. vent through roof
Intake Approval  7/10/2014 PASS
DetailsJohn Menard
Pending Assignment by JCM7/10/2014 7/10/2014 DONE
DetailsJohn Menard
Routing PW Sewer Rating7/10/2014 7/10/2014 PASS
DetailsBeverly Mountain
Intake Approval  6/30/2014 FAIL
(6-30-14) More information required. Refer to the circled items on the plan intake checklist. CJW
Application received  6/16/2014 DONE
Application submitted via PDS Online on Jun 16 2014 1:11PM