Third Notice | | 8/17/2015 | 8/19/2015 | | DONE |
|
|
|
This permit finaled on the web by Penny Dennis
|
Third Notice | | 7/14/2015 | 8/12/2015 | | DONE |
|
|
|
|
Second Notice | | 6/11/2015 | 7/9/2015 | | DONE |
|
|
|
Mailed 7-10-15
|
First Notice | | 6/11/2015 | 6/1/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/30/2015 | | DONE |
|
|
|
|
BLD-Final | 3/26/2015 | 3/27/2015 | 3/27/2015 | A | PASS |
Phil Shearer
|
|
|
Kurtis Phone #: ###-####
|
FIRE-Final Inspection | 3/26/2015 | 3/27/2015 | 3/27/2015 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
DOC - Permit Finaled | | | 3/27/2015 | | DONE |
|
|
|
|
BLD-Conference | 3/26/2015 | 3/26/2015 | 3/26/2015 | P | DONE |
Phil Shearer
|
|
|
Curtis Phone #: ###-####
|
BLD-Conference | 3/12/2015 | 3/13/2015 | 3/13/2015 | A | DONE |
Phil Shearer
|
|
|
Curtis Phone #: ###-####
|
BLD-Conference | 2/27/2015 | 2/27/2015 | 2/27/2015 | P | DONE |
Phil Shearer
|
|
|
Cof O pre walk Phone #: ###-#### Inspection requested via web by Murph Naughtin
|
BLD-Conference | 2/18/2015 | 2/19/2015 | 2/20/2015 | P | DONE |
Phil Shearer
|
|
|
Murph Naughtin will be on site for conference please contact him, ###-#### Phone #: ###-#### Inspection requested via web by Philip Allen
|
BLD-Wall cover | 12/8/2014 | 12/9/2014 | 12/9/2014 | A | PASS |
Phil Shearer
|
|
|
Masonry Lathe Phone #: ###-#### Inspection requested via web by Philip Allen
|
BLD-Foundation | 10/15/2014 | 10/16/2014 | 10/16/2014 | A | PASS |
Phil Shearer
|
|
|
concrete at 2:30 Phone #: ###-#### Inspection requested via web by Kevin Honeycutt. Pending MTI inspection and test report
|
BLD-Footing | 10/13/2014 | 10/14/2014 | 10/14/2014 | P | PASS |
Phil Shearer
|
|
|
Inspection requested for 2 PM please Phone #: ###-#### Inspection requested via web by Kevin Honeycutt
|
BLD-Foundation | 10/2/2014 | 10/3/2014 | 10/3/2014 | A | PASS |
Phil Shearer
|
|
|
OK pending MTI's approval
|
BLD-Footing | 9/24/2014 | 9/25/2014 | 9/25/2014 | P | PASS |
Jim Sly
|
|
|
Kevin Phone #: ###-#### OK pending MTI special insp, tests and approvals.
|
Issue PAID IN FULL permit | | | 9/24/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 9/24/2014 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 9/23/2014 | | |
|
|
|
|
Permit Ready to Issue | | | 9/23/2014 | | DONE |
Candy A. Nichols
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/12/2014 | | DONE |
John Menard
|
|
|
|
Routing - PLAN CHECK | 9/10/2014 | | 9/12/2014 | | PASS |
John Menard
|
|
|
|
Plan assigned to (JCM) | 7/10/2014 | | 9/12/2014 | | PASS |
John Menard
|
|
|
1st Review Completed 7/29/2014
|
Routing Off Site - STRUCTURAL | 9/10/2014 | | 9/11/2014 | | PASS |
John Menard
|
|
|
|
Routing - PLAN CHECK | 8/25/2014 | | 9/4/2014 | | PASS |
John Menard
|
|
|
|
Routing Off Site - STRUCTURAL | 8/25/2014 | | 9/2/2014 | | FAIL |
John Menard
|
|
|
|
Routing PW Sewer Design | 8/25/2014 | | 9/2/2014 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - FIRE | 8/25/2014 | | 8/29/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review Rev 1 08-29-14
|
Routing PW Drainage | 8/25/2014 | | 8/27/2014 | | CANC |
Brian Murphy
|
|
|
Project approved under Permit BLD14-02138 (ODI-3324) JCT.
|
Routing - PUBLIC WORKS | 8/25/2014 | | 8/25/2014 | | PASS |
Beverly Mountain
|
|
|
|
Plan Reviewer's activity | | | 8/20/2014 | | DONE |
|
|
|
Fire protection email to ESI - Penny Dennis
Storage Container (3) high - See Documents
________________
Hi Penny,
Based on our meeting, I understood Ben to say there would not be any commercial storage, just household. I looked on the Zippy website and discovered they do store commercial products. (At least at some locations) If this should turn out to be the case at this facility; than a completed High Pile Storage form #604 shall be completed for each commodity that will be stored. A new evaluation of the hazard would then be performed on the commodity. However, based on just household type furnishing, I believe Class IV would be adequate. The drawings would seem to indicate the building is 30’ at the haunches and you indicated storage of 24’ high. You also included a list of exempt storage items. IFC and IBC would apply especially Chapter 32 of the IFC. Table 3206.3 in IFC indicates fire sprinklers are required for Class IV commodities, 10000 sqft and Public Accessible.
Reference(s):
(Ref: NFPA 13: 5.6.1.2.2) Unless the requirements of 5.6.1.2.3 or 5.6.1.2.4 are
met, mixed commodity storage shall be protected by the requirements
for the highest classified commodity and storage
arrangement.
(Ref: NFPA 13: 5.6.3.4.1) A Class IV commodity shall be defined as a product,
with or without pallets, that meets one of the following criteria:
(1) Constructed partially or totally of Group B plastics
(2) Consists of free-flowing Group A plastic materials
(3) Contains within itself or its packaging an appreciable
amount (5 percent to 15 percent by weight or 5 percent to
25 percent by volume) of Group A plastics
Please, let me know how I may be of further assistances.
Cordially,
Tim Frost, S.E.T.
Fire Sprinkler Plans Examiner
Fire Code Plans Examiner
Fire Inspector
City of Boise
tfrost@cityofboise.org
###-####
|
Routing - PLAN CHECK | 7/10/2014 | | 7/29/2014 | | PASS |
John Menard
|
|
|
|
1st review completed | | | 7/29/2014 | | FAIL |
John Menard
|
|
|
|
Routing - Design Review | 7/10/2014 | | 7/22/2014 | | PASS |
Josh Wilson
|
|
|
Ok per revised sheet L1.0 received 7-22-14
|
Routing - FIRE | 7/10/2014 | 7/10/2014 | 7/21/2014 | | FAIL |
Craig D. Hanson
|
|
|
See Fire Plan Review 07-21-14
|
Routing Off Site - STRUCTURAL | 7/10/2014 | | 7/18/2014 | | FAIL |
John Menard
|
|
|
|
Routing PW Sewer Design | 7/17/2014 | | 7/17/2014 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Utilize existing 8" sewer stub if possible. If not:
Contact April Wing at Boise Public Works to obtain manhole number for new public manhole. New manhole required to have a precast base per SD-501A. Contact Public Works 48 hours prior to sewer work in public R/W and obtain tap permit. Existing sewer line must be Re-CCTV'd up and down stream of new manhole and video submitted to Boise Public Works. Show all inverts for SSMH#1, match crowns of different sized pipe.
|
Routing - PUBLIC WORKS | 7/10/2014 | | 7/17/2014 | | FAIL |
Beverly Mountain
|
|
|
|
Route to Impact Fee Review | 7/10/2014 | 7/15/2014 | 7/11/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLANNING Land Div | 7/10/2014 | | 7/11/2014 | | PASS |
Dave Abo
|
|
|
|
Routing - Addressing | 7/10/2014 | | 7/10/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - Erosion and Sediment | 7/10/2014 | | 7/10/2014 | | PASS |
Evan Jenkins
|
|
|
This is for the construction of the warehouse
|
Routing - PLUMBING | 7/10/2014 | | 7/10/2014 | | PASS |
Daryl Spivey
|
|
|
services only
|
Intake Approval | | | 7/10/2014 | | PASS |
John Menard
|
|
|
|
Pending Assignment by JCM | 7/10/2014 | | 7/10/2014 | | DONE |
John Menard
|
|
|
|
Intake Approval | | | 6/30/2014 | | FAIL |
|
|
|
(6-30-14) More information required. Refer to the circled items on the plan intake checklist. CJW
|
Application received | | | 6/16/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 16 2014 1:15PM
|