Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD14-01653
StatusFinaled
Name XP CONSTRUCTION LLC
Site Address 1715 S BROADWAY AVE
Project NameUpstairs Residential Unit
Customer NumberBLD14-01654
ePlanReviewNo
Description
(2ND STORY DWELLING UNIT) (6-7-19 PLAN MODIFICATION TO REMOVE INTERIOR NONBEARING WALLS TO CREATE A STUDIO APARTMENT WITHOUT SEPARATE BEDROOMS AND TO CHANGE THE EXTERIOR STAIRWAY FROM STEEL TO A WOOD STAIRWAY WITH WOOD STRINGERS AND WOOD TREADS.) This building does not have a fire sprinkler system. To remodel the 974 square foot 2nd story of an existing 2 story building to be used as a dwelling unit. The dwelling unit is NOT regulated as a Type A or as a Type B dwelling unit. This permit is intended to establish a Certificate of Occupancy for the 2nd story as a dwelling unit. Work is to include interior nonbearing walls, new emergency escape and rescue windows, 45 minute fire-protection-rated glass block in existing window openings in property line walls, a 1-hr roof-ceiling assembly, a new exterior stairway, a new landing at the top of the stairway, and guards. The bearing conditions for the existing roof will be changed. Structural work includes new columns, a new roof beam, and subfloor sheathing installed over the top of the existing 2nd floor. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The structural design for the new exterior steel stairway is a deferred submittal item. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 1/4/20202/7/2020 DONE
mailed 2-10-20
Second Notice 12/6/201912/30/2019 DONE
mailed 1-1-20
First Notice11/14/201911/14/201911/26/2019 DONE
DetailsJim Storey
mailed 12-2-19
BLD-Final11/13/201911/14/201911/14/2019PPASS
DetailsJim Storey
Troy Phone #: ###-####
DOC - Permit Finaled11/14/201911/14/201911/14/2019PPASS
DetailsJim Storey
FIRE-Final Inspection11/13/201911/14/201911/14/2019PPASS
DetailsJim Page
Final life fire safety inspection for area of work complete, signature card not provided at time of inspection.

Troy Phone #: ###-####
Place hold on job10/18/2019 11/13/2019 DONE
DetailsBrittany Hill
Waiting for XP Construction to fill out a 302 form and pay a name transfer fee.
Reprint permit for XP Construction to print and sign on
Fees Due Hold10/19/2019 11/13/2019 DONE
DetailsBrittany Hill
(F) Reprint permit  10/28/2019 DONE
BLD-Aging Inspection10/24/201910/24/201910/24/2019 PASS
DetailsJim Storey
pending admin actions.
Telephone call  10/18/2019 DONE
Spoke on the phone with Suzanne with Kiddo Holdings the parcel owner. She wants the permit holder to be transfered into XP Construction. See attached email for the request for the name trasnfer.
The attached GC form from 9/30/19 for 3579 Design INC as stated by the parcel owner is not allowed to be the permit holder for this permit.
BLD-Conference10/16/201910/17/201910/17/2019PPASS
DetailsJim Storey
Troy Phone #: ###-####
Meeting  9/30/2019 DONE
new contractor came in to have name places on permit. informed them we would need a letter from the homeowner that they are ending the working relationship with the gc on the permit no. ***NEW GC FORM IN DOCUMENTS. OWNER OR GC WILL NEED TO PAY THE FEE****
Plan Reviewer's activity  9/4/2019 DONE
Drawings taken to records
BLD-Footing6/11/20196/12/20196/12/2019APASS
DetailsJim Storey
Ted Phone #: ###-####
CHANGE STATUS TO (ISS)  6/11/2019 DONE
OVERRIDE  6/7/2019  
Plan assigned to (CJW)5/29/20195/29/20196/7/2019 PASS
DetailsCarl Westfall
Routing - PLAN CHECK5/29/2019 6/7/2019 PASS
DetailsCarl Westfall
Plan mod reviewed and approved
PLANS/APPL TAKEN TO FRONT DESK  6/7/2019 DONE
Permit Ready to Issue  6/7/2019 DONE
Plan Mod Approved- fees due
OVERRIDE  5/29/2019  
CHANGE STATUS TO (ISS)  5/29/2019 DONE
Print Occupancy Form  5/29/2019 DONE
(F) Reprint permit  5/29/2019 DONE
Plan Modification Accepted  5/29/2019 DONE
Provide ADA compliance and move ramp to front entry at fiest floor permit change stairs per new plan and enginering.
Permit Ready to Issue  5/29/2019 DONE
Permit needs to be issued and signed by new GC. There is two permits and a plan mod that needs to started after this is done.
Telephone call  5/28/2019 DONE
NEED
GC needs to sign new permit.
MET
**waiting for parcel owner's letter to change this permit to the new GC, Wilson Keller and for the tranfer fee to be paid**
BLD-Aging Inspection8/11/20168/11/20168/11/2016 FAIL
DetailsJim Storey

need rated windows/
BLD-Aging Inspection8/10/20168/10/20168/10/2016 FAIL
DetailsJim Storey
need rated windows/
BLD-Final3/28/20163/29/20163/29/2016AFAIL
DetailsJim Storey
IM // please call before for access Phone #: ###-####wrong windows need plans
BLD-Framing/Rough-in2/5/20162/5/20162/5/2016PFAIL
DetailsJim Storey
would like call ahead; Erin Phone #: ###-#### need change of occ submited.
BLD-Framing/Rough-in12/18/201412/18/201412/18/2014PPART
DetailsJim Storey
partial rough in, call 30 minutes before rodger Phone #: ###-#### Inspection requested via web by rodger smith wip reviewed engineering ok
Plan Reviewer's activity  9/22/2014 PASS
Approved optional beam configuration
Print Occupancy Form  8/6/2014 DONE
Issue PAID IN FULL permit  8/6/2014 DONE
DetailsCandy A. Nichols
OVERRIDE  8/5/2014  
Telephone call  8/5/2014 DONE
DetailsBarbara Stitt
Called and left Robin a voice message that permit is ready, fees due and need RP before issued on 8/5/14 @ 3:50PM
Plan assigned to (CJW)6/18/2014 8/5/2014 PASS
DetailsCarl Westfall
2ND STORY - Level 3 TI (15 days - July 4)
Routing - PLAN CHECK7/31/2014 8/5/2014  
Prep for routing
Routing - FIRE8/5/2014 8/5/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review Rev 2 08-05-14
Routing - PLAN CHECK8/5/2014 8/5/2014  
PLANS/APPL TAKEN TO FRONT DESK  8/5/2014 DONE
Print Occupancy Form  8/5/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  8/5/2014 DONE
DetailsBarbara Stitt
Plan resubmittals received  7/31/2014  
Received 3 copies of Plan review response letter, 2 copies of sheet A2.1 and taken to carl Westfall
Routing - FIRE7/30/2014 7/30/2014 FAIL
DetailsCraig D. Hanson
See Fire Plan Review Rev 1 07-30-14
Routing - PLAN CHECK7/11/2014 7/30/2014 PASS
DetailsCarl Westfall
Drawings approved with "red lines"
Plan resubmittals received  7/29/2014  
Received 2 copies of Structural Design Calcs, 2 copies of sheets A2.0, A2.1, A4.0, S2.1 and taken to Carl Westfall's desk
Route to Impact Fee Review7/18/20147/21/20147/23/2014 PASS
DetailsCindy M. Gould
Change in use applied impact fees
Routing - PLAN CHECK6/25/2014 7/11/2014 FAIL
DetailsCarl Westfall
Routing - FIRE7/11/2014 7/11/2014 FAIL
DetailsCraig D. Hanson
See Fire Plan Review 07-11-14
1st review completed  7/11/2014 FAIL
Failed: Plan Check, Fire
Routing - PLUMBING6/24/2014 6/25/2014 PASS
Details
Routing - PLANNING6/23/2014 6/24/2014 PASS
DetailsJosh Wilson
CZC14-00180
Routing - Erosion and Sediment6/20/2014 6/23/2014 PASS
DetailsEvan Jenkins
Routing - PUBLIC WORKS6/20/2014 6/20/2014 PASS
DetailsJennifer Bruner
Routing - Addressing6/18/2014 6/19/2014 PASS
DetailsEmily Dixon
Pending Assignment by JCB6/18/2014 6/18/2014 DONE
DetailsTim L. Woodard
Jason at AIC Energy Conference. TLW
Application received 6/16/20146/16/2014 DONE
Intake Approval  6/16/2014 PASS
DetailsTim L. Woodard