Third Notice | | 12/1/2019 | 12/30/2019 | | DONE |
|
|
|
mailed 1-1-20
|
Third Notice | | 11/3/2019 | 11/26/2019 | | DONE |
|
|
|
mailed 12-2-19
|
Second Notice | | 9/30/2019 | 10/29/2019 | | DONE |
|
|
|
mailed 11-1
|
First Notice | 9/3/2019 | 9/3/2019 | 9/20/2019 | | DONE |
Dave Hannah
|
|
|
mailed 9-23-19
|
Plan Reviewer's activity | | | 9/4/2019 | | DONE |
|
|
|
Drawings taken to records
|
BLD-Final | 9/3/2019 | 9/3/2019 | 9/3/2019 | P | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 9/3/2019 | 9/3/2019 | 9/3/2019 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 8/29/2019 | 8/29/2019 | 8/29/2019 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, no fire sprinklers, no fire alarms, fire extinguisher is in pplace with a current inspection tag. Final life fire safety inspection for area of work complete.
|
FIRE-Final Inspection | 8/28/2019 | 8/29/2019 | 8/29/2019 | A | FAIL |
Jim Page
|
|
|
Provide code compliant door hardware for west exit. Provide double key deadbolt for main entry and install signage that reads "Door to remain unlocked while building is occupied"
Ted Phone #: ###-####
|
BLD-Final | 8/15/2019 | 8/19/2019 | 8/19/2019 | A | NR |
Dave Hannah
|
|
|
Ted Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 6/11/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 6/7/2019 | | |
|
|
|
|
Plan assigned to (CJW) | 5/29/2019 | 5/29/2019 | 6/7/2019 | | PASS |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 5/29/2019 | | 6/7/2019 | | PASS |
Carl Westfall
|
|
|
Plan modification reviewed and approved
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/7/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/7/2019 | | DONE |
|
|
|
Plan Mod Approved- fees due.
|
Telephone call | | | 6/7/2019 | | DONE |
|
|
|
Spoke with GC to inform him the plan mod is ready and what fees are due.
|
Telephone call | | | 6/7/2019 | | DONE |
|
|
|
Spoke with GC to inform him the plan mod is ready and what fees are due.
|
(F) Reprint permit | | | 5/29/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/29/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/29/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 5/29/2019 | | DONE |
|
|
|
Provide ADA compliance and move ramp to front entry at fiest floor permit change stairs per new plan and enginering.
|
Telephone call | | | 5/28/2019 | | DONE |
|
|
|
NEED
GC needs to sign new permit.
MET
**waiting for parcel owner's letter giving authorization for this permit to be change to new GC, Wilson Keller **
|
Meeting | | | 5/16/2019 | | DONE |
|
|
|
went from Rodger Smith Home Solutions to Wilson Keller Design Building Inc. see letter in documents
|
(F) Reprint permit | | | 5/16/2019 | | DONE |
|
|
|
NEED-emailed permit to new GC
|
Inspection Record Card- Bld | | | 5/16/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/16/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 5/15/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 5/15/2019 | | DONE |
|
|
|
Permit needs to be signed by new GC. There is two permits BLD14-01653 & 4 and a plan mod that needs to started after this is done.
***waiting for Email from Roger Smith Home Solution stating that he is transfering this permit to Wilson Keller Design Build Inc.**THIS PERMIT WAS ALREADY IN ISS STATUS, it will need to be corrected when we get the letter from "Roger Smith..""
|
BLD-Framing/Rough-in | 1/21/2015 | 1/21/2015 | 1/21/2015 | A | PASS |
Jim Storey
|
|
|
beam engineering recieved and is aproved as built.
|
BLD-Framing/Rough-in | 12/31/2014 | 1/2/2015 | 1/2/2015 | A | PART |
Jim Storey
|
|
|
meet rogeer 900 c/n to have engineer provide end bearing/ work other than that is ok per plan.
|
BLD-Framing/Rough-in | 12/31/2014 | 12/31/2014 | 1/2/2015 | P | DEFR |
Jim Storey
|
|
|
|
Routing Walk-In (BLD) | 9/17/2014 | 9/17/2014 | 9/17/2014 | P | CANC |
Perry Paine
|
|
|
need commercial approval
|
Issue PAID IN FULL permit | | | 8/6/2014 | | DONE |
Candy A. Nichols
|
|
|
|
OVERRIDE | | | 8/5/2014 | | |
|
|
|
|
Telephone call | | | 8/5/2014 | | DONE |
Barbara Stitt
|
|
|
Called and left Robin a voice message that permit is ready, fees due and need RP before issued on 8/5/14 @ 3:50PM
|
Routing - PLAN CHECK | 8/5/2014 | | 8/5/2014 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/5/2014 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/5/2014 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 8/5/2014 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (CJW) | 6/18/2014 | | 8/5/2014 | | PASS |
Carl Westfall
|
|
|
1ST STORY - Level 3 TI (15 days - July 4)
|
Routing - PLAN CHECK | 7/31/2014 | | 8/5/2014 | | |
|
|
|
Prep for routing
|
Routing - FIRE | 8/5/2014 | | 8/5/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review Rev 2 08-05-14
|
Plan resubmittals received | | | 7/31/2014 | | |
|
|
|
|
Routing - PLAN CHECK | 7/11/2014 | | 7/30/2014 | | PASS |
Carl Westfall
|
|
|
Drawings approved with "red lines"
|
Routing - FIRE | 7/30/2014 | | 7/30/2014 | | FAIL |
Craig D. Hanson
|
|
|
See Fire Plan Review 07-30-14
|
Plan resubmittals received | | | 7/29/2014 | | |
|
|
|
Received 2 copies of Structural Design Calcs, 2 copies of sheets A2.0, A2.1, A4.0, S2.1 and taken to Carl Westfall's desk
|
Route to Impact Fee Review | 7/18/2014 | 7/21/2014 | 7/23/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLAN CHECK | 6/25/2014 | | 7/11/2014 | | FAIL |
Carl Westfall
|
|
|
|
Routing - FIRE | 7/11/2014 | | 7/11/2014 | | FAIL |
Craig D. Hanson
|
|
|
See Fire Plan Review 07-11-14
|
1st review completed | | | 7/11/2014 | | FAIL |
|
|
|
Failed: Plan Check, Fire
|
Routing - PLUMBING | 6/24/2014 | | 6/25/2014 | | PASS |
|
|
|
|
Routing - PLANNING | 6/23/2014 | | 6/24/2014 | | PASS |
Josh Wilson
|
|
|
CZC14-00180
|
Routing - Erosion and Sediment | 6/20/2014 | | 6/23/2014 | | PASS |
Evan Jenkins
|
|
|
|
Routing - PUBLIC WORKS | 6/20/2014 | | 6/20/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Sewer Rating | 6/20/2014 | | 6/20/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Addressing | 6/18/2014 | | 6/19/2014 | | PASS |
Emily Dixon
|
|
|
|
Pending Assignment by JCB | 6/18/2014 | | 6/18/2014 | | DONE |
Tim L. Woodard
|
|
|
|
Application received | | 6/16/2014 | 6/16/2014 | | DONE |
|
|
|
|
Intake Approval | | | 6/16/2014 | | PASS |
Tim L. Woodard
|
|
|
|
BLD-Conference | 9/3/2019 | 9/3/2019 | | P | |
Adele J Schaffeld-Griffin
|
|
|
|