Permit Information
Permit NumberBLD14-01689
StatusFinaled
Name SOLITUDE HOMES
Site Address 512 N 16TH ST
Project NameYoga in the Hood
Customer Number 
ePlanReviewYes
Description
(YOGA IN THE HOOD)Plan Modification 8/22/14 for lower restroom see approved plans. Plan modification for revised restoom and office are floor plan 8/1/14. ajs Permit for demolition of existing nonbearing partition walls, new nonbearing partitions walls, plumbing, 2 accessible upgrades to restroom and hardware, relocation of existing light fixtures for a new business. This will combined 2 tenant spaces into one. New interior and exterior stairs and handrails to be installed Ventilation rate for yoga studio to be verified by mechanical contractor prior to final insepction. This buildig is not fire sprinklered. **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 12/13/20141/6/2015 DONE
DetailsCandy A. Nichols
sent in mail 1/6/15
First Notice 10/11/201412/3/2014 DONE
BLD-Final9/25/201410/1/201410/1/2014PPASS
DetailsTony Young
Late in the day - Shannon Phone #: ###-####,, existing floor levels on south door and door size
Permanent Occupancy  10/1/2014 DONE
DetailsCandy A. Nichols
FIRE-Final Inspection9/29/20149/30/20149/30/2014APASS
DetailsForrest France
Noted correction items verified for completion. Life safety final approved.
FIRE-Final Inspection9/25/20149/29/20149/29/2014AFAIL
DetailsForrest France
C/N items include; remove hardware at the non-functional non-required door upper level west side, provide signage at the main entry/exit per plan review comments, reverse hardware at the door to the mechanical closet.
BLD-Conference9/23/20149/24/20149/24/2014PPART
DetailsTony Young
Gary Phone #: ###-####
BLD-Conference9/23/20149/24/20149/24/2014APART
DetailsTony Young
Gary Phone #: ###-####,, handrail ?s,, existing stairs on interior,, need 2 hand rails
Print Occupancy Form  9/24/2014 DONE
MISC ACTIONS  9/8/2014 DONE
DetailsTisha Gallop
received letter from owner changing General Contractors from MH Construction to Solitude homes. See letter and new GC form in documents.
BLD-Wall cover8/28/20148/29/20148/29/2014APART
DetailsTony Young
Mark Phone #: ###-####,, ok to cover pend mechanical
BLD-Wall cover8/27/20148/28/20148/28/2014APEND
DetailsTony Young
Mark Phone #: ###-####,, need mech full pass
BLD-Wall cover8/26/20148/27/20148/27/2014APEND
DetailsTony Young
Mark Phone #: ###-####,, pending mech full pass
BLD-Energy code compliance8/26/20148/26/20148/26/2014PPART
DetailsTony Young
Mark Phone #: ###-####,, ok to cover pending mechanical
BLD-Energy code compliance8/25/20148/26/20148/26/2014APEND
DetailsTony Young
Shannon Phone #: ###-####,, pending,,
BLD-Energy code compliance8/22/20148/26/20148/26/2014APART
DetailsTony Young
Mark Phone #: ###-####,, ok pending mechanical full pass
BLD-Framing/Rough-in8/18/20148/25/20148/25/2014PPART
DetailsTony Young
Shannon Phone #: ###-####,, need to verify mech full approval for cover,, need to verify mech ok to cover,, moving door in upper restroom per new modification,, ok to insulate
BLD-Conference8/22/20148/25/20148/25/2014APEND
DetailsTony Young
Mark; Phone #: ###-####
BLD-Conference8/19/20148/21/20148/21/2014PPEND
DetailsTony Young
Shannon Phone #: ###-####,, frame walk through,, also needs review of changes to upper bathroom
BLD-Framing/Rough-in8/18/20148/21/20148/21/2014PPART
DetailsTony Young
Shannon Phone #: ###-####,, ?s,, work in progress
BLD-Conference8/20/20148/21/20148/21/2014APASS
DetailsTony Young
please call before-Mark Phone #: ###-####,, frame ?s
BLD-Conference8/4/20148/5/20148/5/2014APASS
DetailsTony Young
Mark Phone #: ###-####,, looking at under floor issues
BLD-Conference8/4/20148/4/20148/4/2014PPEND
DetailsTony Young
Mark Phone #: ###-####
OVERRIDE  8/1/2014  
Plan assigned to (AJS)7/30/20147/30/20148/1/2014 PASS
DetailsAdele J Schaffeld-Griffin
Routing PW Sewer Rating8/1/2014 8/1/2014 PASS
DetailsJennifer Bruner
Routing - PUBLIC WORKS8/1/2014 8/1/2014 PASS
DetailsBeverly Mountain
Routing - PLAN CHECK8/1/2014 8/1/2014 PASS
DetailsAdele J Schaffeld-Griffin
plan modification
PLANS/APPL TAKEN TO FRONT DESK  8/1/2014 DONE
Permit Ready to Issue  8/1/2014 DONE
DetailsChristina Prado
CHANGE STATUS TO (ISS)  8/1/2014 DONE
DetailsChristina Prado
Per Adele - no fees for plan mod, issue permit after review
Plan Modification Accepted  7/30/2014 DONE
DetailsChristina Prado
Per request from Architect to make changes to floor plan
OVERRIDE  7/25/2014  
Issue PAID IN FULL permit  7/25/2014 DONE
DetailsBarbara Stitt
Permit Ready to Issue  7/25/2014 DONE
DetailsBarbara Stitt
Plan assigned to (AJS)6/24/20146/24/20147/21/2014 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed Due 7/18 Level 3 TI - ePlanReview - Yoga in the Hood
Routing - PLAN CHECK7/21/2014 7/21/2014 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  7/21/2014 DONE
1st review completed  7/18/2014 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - Design Review6/24/2014 7/18/2014 PASS
DetailsAndrea Tuning
Andrea Tuning - CZC14-00195
signed off in e-plan ajs 7-18-14
Routing - PLAN CHECK6/24/2014 7/18/2014 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - FIRE6/24/20146/24/20146/27/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review 06-27-14
Routing - Erosion and Sediment6/24/2014 6/24/2014 PASS
DetailsEvan Jenkins
Tenant Improvement
Routing - Addressing6/24/2014 6/24/2014 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS6/24/2014 6/24/2014 PASS
DetailsBeverly Mountain
Pending Assignment by JCB6/24/2014 6/24/2014 DONE
DetailsJason Blais
Intake Approval  6/23/2014 PASS
Intake Approval  6/20/2014 FAIL
See the plan intake checklist for required items.
Application received  6/18/2014 DONE
Application submitted via PDS Online on Jun 18 2014 11:00AM