Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD14-01724
StatusFinaled
Name JIM NYHOF DESIGNER BUILDER LLC
Site Address 2568 N HEAVENS WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
***Plan modification to add 375 sq. ft. covered patio at rear***WUI Zone A, Class A Roof, Permit for the construction of a new 3892 sq. ft., two story (first story 2664 sq. ft., second story 1228 sq. ft.) single family dwelling with 6 bedrooms, 4 bathrooms, approximately 313 sq. ft. of covered patio/porch and a 810 sq. ft. attached garage per the approved plans, plan review report and any notations. A-1 zoning and setbacks per planning. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  5/26/2015 DONE
PubWorks Occupancy Approval5/1/20155/1/20155/1/2015 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Final3/30/20153/31/20153/31/2015APASS
DetailsTony Young
Brian Phone #: ###-####,, made ok
DOC - Permit Finaled3/31/20153/31/20153/31/2015PPASS
DetailsTony Young
done
BLD-Other2/9/20152/10/20152/10/2015APASS
DetailsTony Young
Bryon,, soffit ; Phone #: ###-####,, removed non compliant soffit material,, layer of 5/8 sheetrock in place now,, over fire rated plywood,, ok to apply soffit material
BLD-Final2/5/20152/6/20152/6/2015AFAIL
DetailsTony Young
Brian Phone #: ###-####,, soffit work and window finish not complete,, no work going on
BLD-Final2/4/20152/5/20152/5/2015APEND
DetailsTony Young
Brian Phone #: ###-####
BLD-Final2/2/20152/4/20152/4/2015APEND
DetailsTony Young
Brian Phone #: ###-####
BLD-Final1/30/20152/2/20152/2/2015PPEND
DetailsTony Young
Brian Phone #: ###-####
BLD-Blower Door Test Results1/30/20152/2/20152/2/2015APASS
DetailsTony Young
Brian Phone #: ###-####// 4.4
BLD-Final1/29/20151/30/20151/30/2015PPART
DetailsTony Young
Brian Phone #: ###-####,, all made ok except for the soffit on rear porch area,, will change out next week and call in,, window for egress has been dropped,, will do finish work next week
BLD-Final1/26/20151/27/20151/27/2015PFAIL
DetailsTony Young
Bryan Phone #: ###-####,, need soffits oked by fire chief,, egress per code,, rise per code,, mech final,, furr out weather resistant, etc
PubWorks Occupancy Approval1/27/20151/27/20151/27/2015 DONE
DetailsJason C. Taylor
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Framing/Rough-in1/5/20151/5/20151/5/2015PPART
DetailsTony Young
not for the full house // Brian Phone #: ###-####,, rear patio frame ok,, need to get electrical (if needed for lighting)
and soffit protection inspection prior to cover
BLD-Footing12/8/201412/9/201412/9/2014APASS
DetailsJim Storey
Brian Phone #: ###-####
CHANGE STATUS TO (ISS)  12/8/2014 DONE
DetailsCandy A. Nichols
Plan assigned to (JG) 11/13/201412/5/2014 PASS
DetailsJavier Guzman
1st review completed, Plan Mod covered patio
Routing - PLAN CHECK12/2/2014 12/5/2014 PASS
DetailsJavier Guzman
Case Summary (BLD)  12/5/2014 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  12/5/2014 DONE
Telephone call  12/5/2014 DONE
DetailsCandy A. Nichols
called Brain to let know Mod is ready and how much is owed
Plan resubmittals received  12/2/2014 DONE
DetailsCandy A. Nichols
received 1 set of truss calcs and 2 sets of each sheet 1, A-101, A-102A-103, A-104, A-101, A-102, A-103, A-104-took to JG
Routing - PLANNING12/2/2014 12/2/2014 PASS
DetailsSue Cummings
Plan resubmittals received  11/21/2014 DONE
DetailsChristina Prado
Received revised reduced site plan;taken to JG for review
Routing - PLAN CHECK11/17/2014 11/21/2014 FAIL
DetailsJavier Guzman
emailed report to applicant
Routing - PLANNING11/17/2014 11/17/2014 FAIL
DetailsSue Cummings
Javier pointed out that there is no detail on the patio. site plan and floor plan do not show patio at all. Needs to re-submitt
ACTUAL plans.
Routing PW Grading-Hillside11/13/2014 11/17/2014 PASS
DetailsJason C. Taylor
No changes for Public Works.
Plan Modification Accepted  11/13/2014 DONE
DetailsChristina Prado
Received two sest of revised plan sheets marked Elevations 1, Elevations 2, Lower Level, Main Level, Second Level, Sections 1, Sections 2 & Site Plan as well as two sets reduced site plan and structural calcs;Plans stamped and taken to JG for review
BLD-Energy code compliance10/14/201410/15/201410/15/2014APASS
DetailsTony Young
Brian Phone #: ###-####
BLD-Energy code compliance10/14/201410/14/201410/14/2014PNH
DetailsTony Young
Brian Phone #: ###-####
BLD-Energy code compliance10/13/201410/14/201410/14/2014ANR
DetailsTony Young
Brian Phone #: ###-####
BLD-Framing/Rough-in10/13/201410/13/201410/13/2014PPART
DetailsTony Young
Brian Phone #: ###-####,, still need truss fixes,, need fireblocking at top of chase.,, ok to cover exterior
BLD-Energy code compliance10/10/201410/13/201410/13/2014APART
DetailsTony Young
Brian Phone #: ###-####,, seal ok
BLD-Framing/Rough-in10/10/201410/13/201410/13/2014APART
DetailsTony Young
Brian Phone #: ###-####,, ok to insulate,, c/n posted
BLD-Energy code compliance10/9/201410/10/201410/10/2014APART
DetailsTony Young
Brian Phone #: ###-####,, seal pack ok
BLD-Framing/Rough-in10/9/201410/10/201410/10/2014AFAIL
DetailsTony Young
Brian Phone #: ###-####,, do not insulate,, correction notice posted,, may need to modify permit if adding a porch cover on rear
BLD-Framing/Rough-in10/7/201410/8/201410/8/2014ANR
DetailsPhil Shearer
Need to provide truss engineering.
BLD-Framing/Rough-in10/1/201410/2/201410/2/2014PNR
DetailsTony Young
Brian// please call 30 min prior Phone #: ###-####,, need trades 1st
BLD-Foundation8/8/20148/8/20148/8/2014APASS
DetailsPhil Shearer
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Footing8/7/20148/7/20148/7/2014PPASS
DetailsPhil Shearer
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
PubWorks Subgrade Approval8/6/20148/6/20148/6/2014 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the entire building footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
OVERRIDE  7/25/2014  
Application received 6/20/20147/25/2014 DONE
Issue PAID IN FULL permit  7/25/2014 DONE
DetailsTisha Gallop
Inspection Record Card- Bld  7/25/2014 DONE
DetailsCandy A. Nichols
Inspection Record Card- Bld  7/25/2014 DONE
DetailsBarbara Stitt
Permit Ready to Issue  7/25/2014 DONE
DetailsBarbara Stitt
Plan assigned to (JG)6/23/20146/23/20147/24/2014 PASS
DetailsJavier Guzman
1st review completed, Due 7/10 TH L2**
Routing - PLAN CHECK7/23/2014 7/24/2014 PASS
DetailsJavier Guzman
Plan resubmittals received  7/24/2014 DONE
DetailsTisha Gallop
received two copies of response letter and plan sheets Elevations 1, Elevations 2, Lower Level, Main Floor, Second Floor, Sections 1, Sections, Roof Layout; taken to Javier.
Case Summary (BLD)  7/24/2014 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  7/24/2014 DONE
Routing - PLAN CHECK7/10/2014 7/23/2014 FAIL
DetailsJavier Guzman
see plan review report 7-23-2014
Plan resubmittals received  7/22/2014  
1 copy of plan reveiw responses, 2 copies of sheets Elevations 1, Elevations 2, Lower level, Main floor, Second floor, Sections 1, Sections, Roof layout taken to Javier's desk
Plan resubmittals received  7/21/2014 DONE
DetailsChristina Prado
Received two sets of revised plans marked Elevations 1, Elevations 2, Lower Level, Main Floor, Sections, Sections 1, Second Floor, Roof Layout as well as one set of revised structural calcs; Plans stamped and taken to Javier for further review
1st review completed  7/10/2014 FAIL
DetailsJavier Guzman
Routing PW Grading-Hillside7/10/2014 7/10/2014 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing - PLAN CHECK  7/10/2014 FAIL
DetailsJavier Guzman
emailed review report to applicant
Routing - FIRE7/8/2014 7/8/2014 PASS
DetailsScott Arellano
No comments. This building has been evaluated for Fire Department Vehicle Access.
Routing - Erosion and Sediment7/2/2014 7/2/2014 PASS
DetailsAndy J. Long
ESC plan and SWPPP narrative submitted and approved. Valid RP and PD designated.
Routing - MECHANICAL6/26/2014 7/2/2014 PASS
DetailsTroy James
Routing - Addressing6/23/2014 6/26/2014 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS6/26/2014 6/26/2014 PASS
DetailsJennifer Bruner
Routing - PLANNING6/26/2014 6/26/2014 PASS
DetailsSue Cummings
Routing PW Grading-Hillside6/26/2014 6/26/2014 FAIL
DetailsJason C. Taylor
Need new grading plans dropped off.
Intake Approval  6/23/2014 PASS
Intake Approval  6/20/2014 FAIL
DetailsChristina Prado
need reduced site plan, co/smoke detector called out, extra grading set, bracing calcs & garage seperation