Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD14-01728
StatusFinaled
Name JAYO CONSTRUCTION
Site Address 491 W TERRA COTTA LN
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI Zone A, Class A Roof, Permit for the construction of a new 2627 sq. ft., two story (first story 2116 sq. ft., second story 511 sq. ft.) single family dwelling with 4 bedrooms, 3 bathrooms, approximately 587 sq. ft. of covered patio/porch and a 504 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1B zoning and setbacks per planning. JG
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/17/201412/18/201412/18/2014APASS
DetailsPhil Shearer
garage code 5296 Phone #: ###-#### Inspection requested via web by Stephanie Anthony
DOC - Permit Finaled12/18/201412/18/201412/18/2014PPASS
DetailsPhil Shearer
BLD-Blower Door Test Results12/18/201412/18/201412/18/2014PPASS
DetailsPhil Shearer
4.1
PubWorks Occupancy Approval12/18/201412/18/201412/18/2014 DONE
DetailsJason C. Taylor
NO HILLSIDE APPROVAL REQUIRED. Jason Taylor ###-####.
BLD-Final12/17/201412/17/201412/17/2014PNR
DetailsDave Hannah
garage code 5296 Phone #: ###-#### Inspection requested via web by Stephanie Anthony
BLD-Conference12/16/201412/17/201412/17/2014PCANC
DetailsJim Sly
Garage code 5296 Phone #: ###-#### >> Inspection requested via web by Stephanie Anthony Inspection cancelled from web by: Stephanie Anthony
BLD-Final12/15/201412/16/201412/16/2014ANR
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Stephanie Anthony,, need electrical final,, blower door test
BLD-Energy code compliance9/23/20149/23/20149/23/2014PPASS
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Stephanie Anthony
BLD-Framing/Rough-in9/23/20149/23/20149/23/2014PPASS
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Stephanie Anthony
BLD-Framing/Rough-in9/18/20149/18/20149/18/2014PPART
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Stephanie Anthony CN posted OK to insulate
BLD-Wall Bracing9/18/20149/18/20149/18/2014PPASS
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Stephanie Anthony
BLD-Framing/Rough-in9/16/20149/17/20149/17/2014ANR
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Stephanie Anthony,, need trades 1st,, no formal inspection made
BLD-Wall Bracing9/16/20149/17/20149/17/2014ANR
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Stephanie Anthony,, need to add blocking in various areas,, re nail
Plan Modification Accepted  9/17/2014 DONE
new manual j
Routing - MECHANICAL9/17/2014 9/17/2014 PASS
DetailsTroy James
resubmitted manual j report
BLD-Foundation7/31/20148/1/20148/1/2014APART
DetailsTony Young
Pat Phone #: ###-####,, late am
BLD-Footing7/31/20147/31/20147/31/2014PPART
DetailsTony Young
Pat Phone #: ###-####,, work in progress
PubWorks Subgrade Approval7/31/20147/31/20147/31/2014 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.

Issue PAID IN FULL permit  7/29/2014 DONE
DetailsTisha Gallop
OVERRIDE  7/24/2014  
Plan assigned to (JG) 6/20/20147/24/2014 PASS
DetailsJavier Guzman
1st review completed, pending Mech, Due 7/09 W L2**
Routing - MECHANICAL7/24/2014 7/24/2014 PASS
DetailsTroy James
Case Summary (BLD)  7/24/2014 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  7/24/2014 DONE
Inspection Record Card- Bld  7/24/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  7/24/2014 DONE
DetailsTisha Gallop
Telephone call  7/24/2014 DONE
DetailsTisha Gallop
called Jayo Construction and told recep permit is ready and fee due.
Routing - PLAN CHECK7/9/2014 7/18/2014 PASS
DetailsJavier Guzman
1st review completed  7/9/2014 DONE
DetailsJavier Guzman
Routing - PLAN CHECK  7/9/2014 FAIL
DetailsJavier Guzman
emailed applicant
Routing - FIRE7/7/2014 7/8/2014 PASS
DetailsScott Arellano
No comments. This project has been reivewed for Fire Department Vehicle Access.
Routing - Erosion and Sediment7/3/2014 7/7/2014 PASS
DetailsEvan Jenkins
Routing - MECHANICAL6/26/2014 7/3/2014 FAIL
DetailsTroy James
talked to idaho hvac on phone, need to check on matching the rescheck and equipment
Routing - PLANNING6/25/2014 6/26/2014 PASS
DetailsSusan Riggs
Routing - PUBLIC WORKS6/23/2014 6/25/2014 PASS
DetailsJennifer Bruner
Routing PW Grading-Hillside  6/25/2014 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Routing PW Sewer Rating6/23/2014 6/23/2014 PASS
DetailsJennifer Bruner
Routing - Addressing  6/23/2014 PASS
DetailsJason C. Taylor
Plans ACCEPTED BY PLAN TECH  6/20/2014 DONE
DetailsChristina Prado
Intake Approval  6/20/2014 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  6/20/2014 DONE
DetailsChristina Prado
Application received 6/20/2014