BLD-Final | 3/15/2016 | 3/16/2016 | 3/16/2016 | A | PASS |
Tony Young
|
|
|
would like call head; Jake Phone #: ###-####
|
DOC - Permit Finaled | 3/16/2016 | 3/16/2016 | 3/16/2016 | P | PASS |
Tony Young
|
|
|
done
|
Zoning Approval | 3/16/2016 | 3/16/2016 | 3/16/2016 | | PASS |
Josh Wilson
|
|
|
|
BLD-Final | 3/14/2016 | 3/15/2016 | 3/15/2016 | A | NR |
Tony Young
|
|
|
would like call head; Jake Phone #: ###-####,, need zoning?,, need house #s, guardrail
|
BLD-Energy code compliance | 8/6/2015 | 8/7/2015 | 8/7/2015 | A | PASS |
Tony Young
|
|
|
Call 30 mins before to meet // Jake Phone #: ###-####,, house ok
|
BLD-Wall cover | 8/6/2015 | 8/6/2015 | 8/6/2015 | P | PASS |
Tony Young
|
|
|
Call 30 mins before to meet // Jake Phone #: ###-####
|
BLD-Conference | 7/30/2015 | 7/31/2015 | 7/31/2015 | A | PASS |
Tony Young
|
|
|
Adam Phone #: ###-####,, seal ok
|
BLD-Framing/Rough-in | 7/23/2015 | 7/24/2015 | 7/24/2015 | A | PART |
Tony Young
|
|
|
Brittney Phone #: ###-####
Fire foam is ok // any questions please call Tony Y ###-####
|
BLD-Framing/Rough-in | 7/20/2015 | 7/23/2015 | 7/23/2015 | A | PART |
Tony Young
|
|
|
Brittney Phone #: ###-####,, need to nail hangers,, strap plates,, ok to one side walls to get insulation going
|
BLD-Framing/Rough-in | 7/15/2015 | 7/17/2015 | 7/17/2015 | A | CANC |
Tony Young
|
|
|
Jake Phone #: ###-####
|
Plan Modification Accepted | | | 5/22/2015 | | DONE |
|
|
|
another manual j report
|
Routing - MECHANICAL | 5/22/2015 | | 5/22/2015 | | PASS |
Troy James
|
|
|
resubmitted manaul j report
|
BLD-Wall Bracing | 4/23/2015 | 4/24/2015 | 4/24/2015 | P | PASS |
Jim Sly
|
|
|
Jake Phone #: ###-####
|
BLD-Wall Bracing | 4/10/2015 | 4/13/2015 | 4/13/2015 | A | NR |
Jim Sly
|
|
|
Jake; Phone #: ###-#### Walk thru with owner. Framer to complete nailing.
|
BLD-Conference | 3/23/2015 | 3/23/2015 | 3/23/2015 | P | DONE |
Jim Sly
|
|
|
Aaron Phone #: ###-#### Inspection of Convevtional framed roof ......to include rafters and ridge board. OK. OK to sheet rafters ......install 2x6 sleepers above sheeting, install spray foam between sleepers and install final roof sheeting above sleepers. Any Electrical installed where foam insulation is installed .....will be inspected prior to cover. Have not inspected Engineered steel rafter ties.
|
BLD-Footing | 11/3/2014 | 11/4/2014 | 11/4/2014 | P | PASS |
Jim Sly
|
|
|
Levi Phone #: ###-#### House and Garage OK
|
BLD-Concrete | 10/17/2014 | 10/20/2014 | 10/20/2014 | A | PART |
Tony Young
|
|
|
basement wall // Aaron (or Cal ###-####) Phone #: ###-####,, NOTE,, FTG FOR BASEMENT WAS OK TO POUR,, basement walls ok to pour when ready
|
CHANGE STATUS TO (ISS) | | | 10/7/2014 | | DONE |
Candy A. Nichols
|
|
|
|
OVERRIDE | | | 10/3/2014 | | |
|
|
|
|
Plan assigned to (PEP) | 10/1/2014 | 10/1/2014 | 10/3/2014 | | PASS |
Perry Paine
|
|
|
Plan Mod
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/3/2014 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/3/2014 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 10/3/2014 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 10/1/2014 | | 10/3/2014 | | PASS |
Perry Paine
|
|
|
|
Plan assigned to (JG) | 10/1/2014 | 10/1/2014 | 10/1/2014 | | DEFR |
Javier Guzman
|
|
|
|
BLD-Footing | 9/30/2014 | 10/1/2014 | 10/1/2014 | A | CANC |
Tony Young
|
|
|
Cal Phone #: ###-####
|
Plan Modification Accepted | | | 10/1/2014 | | DONE |
Christina Prado
|
|
|
Received two revised sets of plans showing changes to footing details - specifically basement wall height - addition of bathroom in basement;Plans stamped and taken to plan review
|
Routing - Design Review | 10/1/2014 | | 10/1/2014 | | PASS |
Josh Wilson
|
|
|
DRH14-00203
|
BLD-Footing | 9/30/2014 | 9/30/2014 | 9/30/2014 | P | NR |
Tony Young
|
|
|
Cal Phone #: ###-####
|
BLD-Footing | 9/29/2014 | 9/30/2014 | 9/30/2014 | A | NR |
Tony Young
|
|
|
Cal Phone #: ###-####
|
Routing Walk-In (BLD) | 9/30/2014 | 9/30/2014 | 9/30/2014 | A | FAIL |
Perry Paine
|
|
|
need updated engineering resubmittals
|
Routing Walk-In (BLD) | 9/26/2014 | 9/26/2014 | 9/30/2014 | P | DONE |
Perry Paine
|
|
|
|
Plan resubmittals requested | | | 9/30/2014 | | DONE |
|
|
|
need sealed approved plans and engineering seals
|
Plan Modification Accepted | | | 9/3/2014 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 9/3/2014 | | 9/3/2014 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
Issue PAID IN FULL permit | | | 7/28/2014 | | DONE |
Candy A. Nichols
|
|
|
|
OVERRIDE | | | 7/25/2014 | | |
|
|
|
|
Plan assigned to (JG) | 7/14/2014 | 7/14/2014 | 7/25/2014 | | PASS |
Javier Guzman
|
|
|
1st review completed, 7/24 TH L1*
|
Routing - PLAN CHECK | 7/23/2014 | | 7/25/2014 | | PASS |
Javier Guzman
|
|
|
|
Plan resubmittals received | | | 7/25/2014 | | |
|
|
|
Received 3 copies of calcs, 3 copies of res check, 4 copies of sheet garage/studio plan sheet and taken to Javier's desk
|
Case Summary (BLD) | | | 7/25/2014 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/25/2014 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/25/2014 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 7/25/2014 | | DONE |
Christina Prado
|
|
|
Called both Aaron & Jake to advise permit is ready adn gave fees due
|
Permit Ready to Issue | | | 7/25/2014 | | DONE |
Christina Prado
|
|
|
|
Routing - MECHANICAL | 7/23/2014 | | 7/23/2014 | | PASS |
Troy James
|
|
|
|
1st review completed | | | 7/23/2014 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 7/18/2014 | | 7/23/2014 | | FAIL |
Javier Guzman
|
|
|
emailed report to applicant
|
Routing - MECHANICAL | 7/17/2014 | | 7/18/2014 | | FAIL |
Troy James
|
|
|
emailed corrections to northwest heating
|
Routing - PLANNING | 7/16/2014 | | 7/17/2014 | | PASS |
Josh Wilson
|
|
|
Ok per DRH14-00203
|
Routing - Addressing | 7/14/2014 | | 7/15/2014 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 7/14/2014 | | 7/15/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Application received | | 6/20/2014 | 7/14/2014 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/14/2014 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/14/2014 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 7/14/2014 | | PASS |
Tisha Gallop
|
|
|
|
Intake Approval | | | 6/20/2014 | | FAIL |
Christina Prado
|
|
|
|