Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD14-01731
StatusFinaled
Name JAKE DADAM
Site Address 1900 N 24TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a new 4218s.f. 1-story single family dwelling with 3432s.f. on the main level that has 4-bedrooms 2-full bathrooms and 2-half bathrooms. The 786s.f. basement includes a bedroom and three quarter bathroom with code complying egress. There is proposed a 30+- s.f. covered front entry porch. The main level includes an area of 500s.f. that is heated separately from the main dwelling which has a full radiant floor heating system. The 500s.f. separate heated area has a radiant floor system plus a forced air back-up to support the use of 3-wooden overhead doors in the exterior wall of same. The project also includes a new 768s.f. detached single story garage with a one half bathroom. R-1C setbacks approved through DRH14-00203 by Josh Wilson. All per the approved plans as marked, sealed engineers details and calculations, ACCA Report along with the plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/15/20163/16/20163/16/2016APASS
DetailsTony Young
would like call head; Jake Phone #: ###-####
DOC - Permit Finaled3/16/20163/16/20163/16/2016PPASS
DetailsTony Young
done
Zoning Approval3/16/20163/16/20163/16/2016 PASS
DetailsJosh Wilson
BLD-Final3/14/20163/15/20163/15/2016ANR
DetailsTony Young
would like call head; Jake Phone #: ###-####,, need zoning?,, need house #s, guardrail
BLD-Energy code compliance8/6/20158/7/20158/7/2015APASS
DetailsTony Young
Call 30 mins before to meet // Jake Phone #: ###-####,, house ok
BLD-Wall cover8/6/20158/6/20158/6/2015PPASS
DetailsTony Young
Call 30 mins before to meet // Jake Phone #: ###-####
BLD-Conference7/30/20157/31/20157/31/2015APASS
DetailsTony Young
Adam Phone #: ###-####,, seal ok
BLD-Framing/Rough-in7/23/20157/24/20157/24/2015APART
DetailsTony Young
Brittney Phone #: ###-####
Fire foam is ok // any questions please call Tony Y ###-####
BLD-Framing/Rough-in7/20/20157/23/20157/23/2015APART
DetailsTony Young
Brittney Phone #: ###-####,, need to nail hangers,, strap plates,, ok to one side walls to get insulation going
BLD-Framing/Rough-in7/15/20157/17/20157/17/2015ACANC
DetailsTony Young
Jake Phone #: ###-####
Plan Modification Accepted  5/22/2015 DONE
another manual j report
Routing - MECHANICAL5/22/2015 5/22/2015 PASS
DetailsTroy James
resubmitted manaul j report
BLD-Wall Bracing4/23/20154/24/20154/24/2015PPASS
DetailsJim Sly
Jake Phone #: ###-####
BLD-Wall Bracing4/10/20154/13/20154/13/2015ANR
DetailsJim Sly
Jake; Phone #: ###-####
Walk thru with owner. Framer to complete nailing.
BLD-Conference3/23/20153/23/20153/23/2015PDONE
DetailsJim Sly
Aaron Phone #: ###-####
Inspection of Convevtional framed roof ......to include rafters and ridge board. OK. OK to sheet rafters ......install 2x6 sleepers above sheeting, install spray foam between sleepers and install final roof sheeting above sleepers. Any Electrical installed where foam insulation is installed .....will be inspected prior to cover. Have not inspected Engineered steel rafter ties.
BLD-Footing11/3/201411/4/201411/4/2014PPASS
DetailsJim Sly
Levi Phone #: ###-####
House and Garage OK
BLD-Concrete10/17/201410/20/201410/20/2014APART
DetailsTony Young
basement wall // Aaron (or Cal ###-####) Phone #: ###-####,, NOTE,, FTG FOR BASEMENT WAS OK TO POUR,, basement walls ok to pour when ready
CHANGE STATUS TO (ISS)  10/7/2014 DONE
DetailsCandy A. Nichols
OVERRIDE  10/3/2014  
Plan assigned to (PEP)10/1/201410/1/201410/3/2014 PASS
DetailsPerry Paine
Plan Mod
PLANS/APPL TAKEN TO FRONT DESK  10/3/2014 DONE
Inspection Record Card- Bld  10/3/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  10/3/2014 DONE
DetailsChristina Prado
Routing - PLAN CHECK10/1/2014 10/3/2014 PASS
DetailsPerry Paine
Plan assigned to (JG)10/1/201410/1/201410/1/2014 DEFR
DetailsJavier Guzman
BLD-Footing9/30/201410/1/201410/1/2014ACANC
DetailsTony Young
Cal Phone #: ###-####
Plan Modification Accepted  10/1/2014 DONE
DetailsChristina Prado
Received two revised sets of plans showing changes to footing details - specifically basement wall height - addition of bathroom in basement;Plans stamped and taken to plan review
Routing - Design Review10/1/2014 10/1/2014 PASS
DetailsJosh Wilson
DRH14-00203
BLD-Footing9/30/20149/30/20149/30/2014PNR
DetailsTony Young
Cal Phone #: ###-####
BLD-Footing9/29/20149/30/20149/30/2014ANR
DetailsTony Young
Cal Phone #: ###-####
Routing Walk-In (BLD)9/30/20149/30/20149/30/2014AFAIL
DetailsPerry Paine
need updated engineering resubmittals
Routing Walk-In (BLD)9/26/20149/26/20149/30/2014PDONE
DetailsPerry Paine
Plan resubmittals requested  9/30/2014 DONE
need sealed approved plans and engineering seals
Plan Modification Accepted  9/3/2014 DONE
new manual j report
Routing - MECHANICAL9/3/2014 9/3/2014 PASS
DetailsTroy James
resubmitted manual j report
Issue PAID IN FULL permit  7/28/2014 DONE
DetailsCandy A. Nichols
OVERRIDE  7/25/2014  
Plan assigned to (JG)7/14/20147/14/20147/25/2014 PASS
DetailsJavier Guzman
1st review completed, 7/24 TH L1*
Routing - PLAN CHECK7/23/2014 7/25/2014 PASS
DetailsJavier Guzman
Plan resubmittals received  7/25/2014  
Received 3 copies of calcs, 3 copies of res check, 4 copies of sheet garage/studio plan sheet and taken to Javier's desk
Case Summary (BLD)  7/25/2014 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  7/25/2014 DONE
Inspection Record Card- Bld  7/25/2014 DONE
DetailsTisha Gallop
Telephone call  7/25/2014 DONE
DetailsChristina Prado
Called both Aaron & Jake to advise permit is ready adn gave fees due
Permit Ready to Issue  7/25/2014 DONE
DetailsChristina Prado
Routing - MECHANICAL7/23/2014 7/23/2014 PASS
DetailsTroy James
1st review completed  7/23/2014 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK7/18/2014 7/23/2014 FAIL
DetailsJavier Guzman
emailed report to applicant
Routing - MECHANICAL7/17/2014 7/18/2014 FAIL
DetailsTroy James
emailed corrections to northwest heating
Routing - PLANNING7/16/2014 7/17/2014 PASS
DetailsJosh Wilson
Ok per DRH14-00203
Routing - Addressing7/14/2014 7/15/2014 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS7/14/2014 7/15/2014 PASS
DetailsJennifer Bruner
Application received 6/20/20147/14/2014 DONE
Plans ACCEPTED BY PLAN TECH  7/14/2014 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  7/14/2014 DONE
DetailsTisha Gallop
Intake Approval  7/14/2014 PASS
DetailsTisha Gallop
Intake Approval  6/20/2014 FAIL
DetailsChristina Prado