DOC - Permit Expired | 11/1/2016 | 11/1/2016 | 11/1/2016 | P | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 10/26/2016 | 10/26/2016 | 11/1/2016 | | FAIL |
Tony Young
|
|
|
|
BLD-Aging Inspection | 10/25/2016 | 10/25/2016 | 11/1/2016 | | FAIL |
Tony Young
|
|
|
|
Telephone call | | | 12/11/2015 | | DONE |
|
|
|
Left a message for Bruce informing him that this permit is going to expire tomorrow, 12-12-15, and that the permit will need to be picked up or let expire since he has had his two 180 day extension. Informed him that the RP, GC Form and Revised Cert of Value is need for issuance.
|
Issue PAID IN FULL permit | | | 12/11/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/11/2015 | | DONE |
|
|
|
|
Telephone call | | | 12/2/2015 | | DONE |
|
|
|
Left a message for Bruce that the permit is going to expire in ten days and that if he would like a 180 day extension he would need to email Jason B. Informed him that if they are ready to pick the permit up we just need to know who the RP will be and the GC would need to fill out the 302 and the 306 so we can put the final fees in.
|
OVERRIDE | | | 11/18/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 11/18/2015 | | DONE |
|
|
|
Need GC, Revised Cert of Value
|
Routing - Erosion and Sediment | 7/11/2014 | | 7/15/2015 | | FAIL |
Evan Jenkins
|
|
|
ESC Waiver Request Letter Required
|
Extend Review Timeline | | | 6/11/2015 | | DONE |
|
|
|
Final Extention for 180 days granted by JCB. See attached documents.
|
Telephone call | | | 6/5/2015 | | DONE |
|
|
|
Left a message for Bruce that permit will expire in ten days.
|
Expiration Notice | 5/26/2015 | 6/16/2015 | 5/26/2015 | | DONE |
Brittany Hill
|
|
|
|
Extend Review Timeline | | | 12/24/2014 | | DONE |
Christina Prado
|
|
|
180 expiration granted
|
Expiration Notice | 11/28/2014 | 12/19/2014 | 11/28/2014 | | DONE |
Christina Prado
|
|
|
|
Routing - Erosion and Sediment | 7/28/2014 | | 7/29/2014 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver submitted and approved. Need to designate RP.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/29/2014 | | DONE |
Tim L. Woodard
|
|
|
|
Inspection Record Card- Bld | | | 7/29/2014 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (TLW) | 7/11/2014 | | 7/29/2014 | | PASS |
Tim L. Woodard
|
|
|
Arue Salon
|
Routing - PLUMBING | 7/16/2014 | | 7/24/2014 | | PASS |
Bill VanDegrift
|
|
|
received the 22nd for review, attach all plumbing sheets to plans
|
Routing - MECHANICAL | 7/22/2014 | | 7/23/2014 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 7/22/2014 | | 7/23/2014 | | FAIL |
Evan Jenkins
|
|
|
ESC Plan Waiver Letter Required
|
Routing - PLAN CHECK | 7/22/2014 | | 7/22/2014 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 7/16/2014 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 7/11/2014 | | 7/16/2014 | | PASS |
Tim L. Woodard
|
|
|
Approved with redlines. TLW
|
Routing - MECHANICAL | 7/11/2014 | | 7/15/2014 | | FAIL |
Troy James
|
|
|
eplan
|
Routing - PUBLIC WORKS | 7/11/2014 | | 7/11/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Addressing | 7/11/2014 | | 7/11/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - PLUMBING | 7/11/2014 | | 7/11/2014 | | FAIL |
Bill VanDegrift
|
|
|
provide water system design showing sizing, routing, cross connection control, fixture schedule according to the submittal checklist. Architect or engineer will need to stamp plumbing plans.
|
Intake Approval | | | 7/11/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
CHANGE STATUS TO (REV) | | | 7/7/2014 | | DONE |
Sam Zahorka
|
|
|
accidently changed to issue status and changed back to REV status.
|
Case Summary (BLD) | | | 7/7/2014 | | DONE |
Sam Zahorka
|
|
|
|
Meeting | | | 7/7/2014 | | DONE |
Sam Zahorka
|
|
|
Met with a gentleman at the front counter about this T.I. He stated he was the tenants father and needed information on this space his daughter was leasing. I printed out the buildings history from TideMark and identified a building permit was just submitted to convert this space from a tattoo parlor into a nail salon. Also informed the gentleman this permit had failed the intake due to no mechanical or plumbing plans. I gave him the applicants name and requested him to contact him about the status of the needed mechanical and plumbing plans.
|
Telephone call | | | 7/7/2014 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
called and spoke with Bruce Poe, let him know that I would accept the pre screen and route the plumbing scetches to Bill for review. Accepting the pre screen does not negate any of Bill's plumbing requirements including the design professional requirements.
|
Intake Approval | | | 6/23/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Engineered plumbing plans are required for hair salons. Please see check list for this requirement.
Please submitt engineered stamped plumbing plans for this submittal.
|
Application received | | | 6/20/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 20 2014 4:38PM
|