Second Notice | | 5/14/2015 | 5/18/2015 | | DONE |
|
|
|
This permit finaled on the web by Tony O'Neil
|
First Notice | 4/13/2015 | 4/13/2015 | 5/4/2015 | | DONE |
Mike Jordan
|
|
|
|
BLD-Final | 4/10/2015 | 4/13/2015 | 4/13/2015 | P | PASS |
Mike Jordan
|
|
|
Doug Phone #: ###-####
|
DOC - Permit Finaled | 4/13/2015 | 4/13/2015 | 4/13/2015 | P | PASS |
Mike Jordan
|
|
|
|
Zoning Approval | 4/10/2015 | 4/10/2015 | 4/10/2015 | | DONE |
Josh Wilson
|
|
|
|
PubWorks Occupancy Approval | 4/10/2015 | 4/10/2015 | 4/10/2015 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 4/8/2015 | 4/9/2015 | 4/9/2015 | A | NR |
Mike Jordan
|
|
|
doug Phone #: ###-####. needs zoning and public works.
|
FIRE-Final Inspection | 4/9/2015 | 4/9/2015 | 4/9/2015 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Repair and demostrate exit discharge lights on front of building for building inspector
|
FIRE-Final Inspection | 4/7/2015 | 4/9/2015 | 4/8/2015 | A | CANC |
Troy Cobbley
|
|
|
Overbooked. Rescheduled for tomorrow morning.
|
BLD-Energy code compliance | 2/6/2015 | 2/6/2015 | 2/6/2015 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Other | 2/5/2015 | 2/6/2015 | 2/6/2015 | A | PASS |
Mike Jordan
|
|
|
Doug-puddle welding deck on the roof Phone #: ###-####
|
BLD-Other | 1/21/2015 | 1/21/2015 | 1/21/2015 | P | PART |
Mike Jordan
|
|
|
top out// special inspection for grout at 2pm ///Doug ###-####. pending special inspection. Also reviewed special inspection reports to date.
|
BLD-Other | 12/22/2014 | 12/22/2014 | 12/22/2014 | P | PASS |
Mike Jordan
|
|
|
Doug// masonry top out Phone #: ###-####
|
BLD-Foundation | 12/9/2014 | 12/9/2014 | 12/9/2014 | P | CANC |
Mike Jordan
|
|
|
Doug-pour time 2:00-would like to meet you so can you call him, Phone #: ###-####
|
BLD-Other | 12/9/2014 | 12/9/2014 | 12/9/2014 | P | PART |
Mike Jordan
|
|
|
Doug-pour time 2:00-would like to meet you so can you call him, Phone #: ###-####. Masonry inspection, 0 elev. to 4ft. elev. at north and east walls. Special inspector on site.
|
BLD-Energy code compliance | 10/17/2014 | 10/20/2014 | 10/20/2014 | A | PASS |
Mike Jordan
|
|
|
Doug Phone #: ###-####. rigid insulation on interior side of stemwall under slab on grade.
|
BLD-Foundation | 10/14/2014 | 10/16/2014 | 10/16/2014 | A | PASS |
Phil Shearer
|
|
|
request 8-9 am// stem wall // Doug Phone #: ###-####. pending MTI inspetion and test report.
|
BLD-Footing | 10/9/2014 | 10/9/2014 | 10/9/2014 | P | PART |
Jim Sly
|
|
|
Steve Phone #: ###-#### Perimeter and trash enclosure footings OK pending MTI special insp, tests and approvals.
|
Issue PAID IN FULL permit | | | 10/9/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 10/9/2014 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 10/7/2014 | | |
|
|
|
|
Routing - PLAN CHECK | 10/6/2014 | | 10/7/2014 | | PASS |
John Menard
|
|
|
|
Routing Off Site - STRUCTURAL | 10/6/2014 | | 10/7/2014 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/7/2014 | | DONE |
John Menard
|
|
|
|
Permit Ready to Issue | | | 10/7/2014 | | DONE |
Christina Prado
|
|
|
minus ACHD
|
Plan assigned to (JCM) | 6/30/2014 | | 10/7/2014 | | PASS |
John Menard
|
|
|
1st Review Complete 7/16/2014
|
Routing - Design Review | 9/17/2014 | | 9/23/2014 | | PASS |
Josh Wilson
|
|
|
Ok per DRH14-00360
|
Routing Off Site - STRUCTURAL | 9/17/2014 | | 9/22/2014 | | FAIL |
John Menard
|
|
|
|
Routing - PLAN CHECK | 9/19/2014 | | 9/19/2014 | | PASS |
John Menard
|
|
|
|
Plan resubmittals requested | | | 9/17/2014 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the second plan review requesting revisions. JCM
|
Routing - PLAN CHECK | 9/17/2014 | | 9/17/2014 | | FAIL |
John Menard
|
|
|
|
1st review completed | | | 7/16/2014 | | FAIL |
John Menard
|
|
|
|
Routing - PLAN CHECK | 6/30/2014 | | 7/16/2014 | | FAIL |
John Menard
|
|
|
|
Routing Off Site - STRUCTURAL | 6/30/2014 | | 7/11/2014 | | FAIL |
John Menard
|
|
|
|
Routing PW Drainage | 7/1/2014 | | 7/10/2014 | | PASS |
Brian Murphy
|
|
|
|
Routing - FIRE | 6/30/2014 | 6/30/2014 | 7/8/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review 07-08-14
|
Routing PW Sewer Design | 7/1/2014 | | 7/7/2014 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Route to Impact Fee Review | 6/30/2014 | 7/3/2014 | 7/3/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Routing PW Solid Waste | 7/1/2014 | | 7/2/2014 | | PASS |
Peter J. McCullough
|
|
|
|
Routing - Design Review | 6/30/2014 | | 7/2/2014 | | PASS |
Josh Wilson
|
|
|
|
Routing - PLUMBING | 6/30/2014 | | 7/2/2014 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - PLANNING Land Div | 6/30/2014 | | 7/1/2014 | | PASS |
Dave Abo
|
|
|
ROS14-00019 has been recorded.
|
Routing - PUBLIC WORKS | 6/30/2014 | | 7/1/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Sewer Rating | 7/1/2014 | | 7/1/2014 | | PASS |
Beverly Mountain
|
|
|
|
Intake Approval | | | 6/30/2014 | | PASS |
John Menard
|
|
|
|
Routing - Erosion and Sediment | 6/30/2014 | | 6/30/2014 | | PASS |
Andy J. Long
|
|
|
ESC plan submitted and approved for new retail building. Waiver submitted for parking lot TI (BLD14-01856)
|
Routing - Addressing | 6/30/2014 | | 6/30/2014 | | PASS |
Emily Dixon
|
|
|
|
Intake Approval | | | 6/30/2014 | | PASS |
|
|
|
|
Pending Assignment by JCM | 6/30/2014 | | 6/30/2014 | | DONE |
John Menard
|
|
|
|
Intake Approval | | | 6/25/2014 | | FAIL |
|
|
|
(6-25-14) ESC narrative, building envelope COMcheck, and heating and cooling load calculations are required.
|
Application received | | | 6/23/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 23 2014 10:33AM
|