BLD-Final | 3/9/2016 | 3/10/2016 | 3/10/2016 | A | PASS |
Dave Hannah
|
|
|
Tyler Phone #: ###-#### phase one was done and passed but phase two has been canceled
|
Letter of compliance/Occupancy | | | 3/10/2016 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (FNL) | | | 3/10/2016 | | DONE |
|
|
|
Project completed and all inspections approved
|
FIRE-Final Inspection | 3/9/2016 | 3/9/2016 | 3/9/2016 | P | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alalrms, exterior work so no fire extibguishers. Life fire safety inspection passed/complete.
|
PubWorks Occupancy Approval | 3/9/2016 | 3/9/2016 | 3/9/2016 | | DONE |
Tiffany Lowery
|
|
|
Not required.
|
Zoning Approval | 3/9/2016 | 3/9/2016 | 3/9/2016 | | DONE |
Andrea Tuning
|
|
|
|
Case Summary (BLD) | | | 3/9/2016 | | DONE |
Christina Prado
|
|
|
|
Case Summary (BLD) | | | 1/19/2016 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 1/19/2016 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
BLD-Conference | 6/9/2015 | 6/9/2015 | 6/15/2015 | P | PASS |
Dave Hannah
|
|
|
permit might need to be re-opened; Contact Carlos at permit desk ###-####
|
Reopen Permit (ISS) | | | 6/15/2015 | | DONE |
Christina Prado
|
|
|
Permit closed by mistake after phase 1 was completed. Still have phase 2 to complete. Re-opened per Dave Hannah's approval with original sept 21st expiration date to stay///cdp
|
BLD-Final | 3/25/2015 | 3/25/2015 | 3/25/2015 | P | PART |
Dave Hannah
|
|
|
Please call ahead for access - Richard Phone #: ###-####//Still pending phase 2 improvements
|
DOC - Permit Finaled | 3/25/2015 | 3/25/2015 | 3/25/2015 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 1/14/2015 | 1/14/2015 | 1/15/2015 | P | DONE |
Dave Hannah
|
|
|
Richard Phone #: ###-####
|
Override - Parcel Holds | | | 8/29/2014 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/29/2014 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (AJS) | 6/25/2014 | 6/25/2014 | 8/26/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Due 7/21 Level 3 TI - Paper - One Capitol Center Exterior Plaza
|
Routing - PLAN CHECK | 8/26/2014 | | 8/26/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/26/2014 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 8/26/2014 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
Inspection Record Card- Bld | | | 8/26/2014 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 8/26/2014 | | DONE |
Candy A. Nichols
|
|
|
called Megan and told her the permits were ready and how much is owed. Also told her we need the GC and RP
|
Override - Parcel Holds | | | 8/26/2014 | | |
|
|
|
|
Permit Ready to Issue | | | 8/26/2014 | | DONE |
Candy A. Nichols
|
|
|
called Megan and told her the permits were ready and how much is owed. Also told her we need the GC and RP
|
Plan resubmittals received | | | 8/19/2014 | | DONE |
Candy A. Nichols
|
|
|
resubmitted plans came in today-2 sheets of each: a0.01, c1.1, c1.2, a1.10, a1.11, a1.12-transmittal sheet from erstad architects & response letter -took to Adele
|
Route to Impact Fee Review | 7/30/2014 | 8/2/2014 | 7/30/2014 | | PASS |
Cindy M. Gould
|
|
|
site work only no impact fees
|
Routing - FIRE | 7/22/2014 | 7/22/2014 | 7/23/2014 | | PASS |
Craig D. Hanson
|
|
|
No Report, No corrections required.
|
1st review completed | | | 7/23/2014 | | FAIL |
|
|
|
Failed: Plan Check
|
Routing - PLAN CHECK | 7/10/2014 | | 7/22/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Solid Waste | 6/26/2014 | | 7/10/2014 | | PASS |
Peter J. McCullough
|
|
|
Approved by PJM and signoff by Jennifer Bruner.
|
Routing - PLUMBING | 7/2/2014 | | 7/2/2014 | | PASS |
Bill VanDegrift
|
|
|
No review required..
|
Routing - Erosion and Sediment | 7/1/2014 | | 7/2/2014 | | PASS |
Andy J. Long
|
|
|
ESC site map and SWPPP narrative submitted and approved. Valid PD, RP to be designated.
|
Routing - Design Review | 7/2/2014 | | 7/2/2014 | | PASS |
Josh Wilson
|
|
|
Josh Wilson - DRH14-00214
|
Routing - PUBLIC WORKS | | | 7/1/2014 | | PASS |
|
|
|
|
Routing PW Street Lights | | | 6/30/2014 | | PASS |
Mike D Hedge
|
|
|
|
Routing PW Drainage | 6/26/2014 | | 6/26/2014 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Rating | 6/26/2014 | | 6/26/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Addressing | 6/25/2014 | | 6/26/2014 | | PASS |
Jason C. Taylor
|
|
|
|
Pending Assignment by JCB | 6/23/2014 | | 6/26/2014 | | DONE |
Jason Blais
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/23/2014 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 6/23/2014 | | PASS |
Carl D Madsen
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/23/2014 | | DONE |
Christina Prado
|
|
|
|
Application received | | 6/23/2014 | | | |
|
|
|
|