Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD14-01747
StatusFinaled
Name MCALVAIN CONSTRUCTION INC
Site Address 999 W MAIN ST
Project NameOne Capitol Center
Customer Number 
ePlanReviewNo
Description
(ONE CAPITOL CENTER - EXTERIOR PLAZA MAINTENANCE) Special inspections required for new structural work shown in engineering calculations. This building is fire sprinklered for High Rise requirements. Permit for work in the exterior plaza and site upgrades to the existing high-rise building. Work to include a temporary stairs during construction. Site work including retaining wall, stairs, guard rails, hand rails. Site drainage per approved plans. Smoking shelter that is removed will require a new separate permit for re installation. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/9/20163/10/20163/10/2016APASS
DetailsDave Hannah
Tyler Phone #: ###-#### phase one was done and passed but phase two has been canceled
Letter of compliance/Occupancy  3/10/2016 DONE
DetailsChristina Prado
CHANGE STATUS TO (FNL)  3/10/2016 DONE
Project completed and all inspections approved
FIRE-Final Inspection3/9/20163/9/20163/9/2016PPASS
DetailsJim Page
No fire sprinklers, no fire alalrms, exterior work so no fire extibguishers. Life fire safety inspection passed/complete.
PubWorks Occupancy Approval3/9/20163/9/20163/9/2016 DONE
DetailsTiffany Lowery
Not required.
Zoning Approval3/9/20163/9/20163/9/2016 DONE
DetailsAndrea Tuning
Case Summary (BLD)  3/9/2016 DONE
DetailsChristina Prado
Case Summary (BLD)  1/19/2016 DONE
DetailsAdele J Schaffeld-Griffin
Case Summary (BLD)  1/19/2016 DONE
DetailsAdele J Schaffeld-Griffin
BLD-Conference6/9/20156/9/20156/15/2015PPASS
DetailsDave Hannah
permit might need to be re-opened; Contact Carlos at permit desk ###-####
Reopen Permit (ISS)  6/15/2015 DONE
DetailsChristina Prado
Permit closed by mistake after phase 1 was completed. Still have phase 2 to complete. Re-opened per Dave Hannah's approval with original sept 21st expiration date to stay///cdp
BLD-Final3/25/20153/25/20153/25/2015PPART
DetailsDave Hannah
Please call ahead for access - Richard Phone #: ###-####//Still pending phase 2 improvements
DOC - Permit Finaled3/25/20153/25/20153/25/2015PPASS
DetailsDave Hannah
BLD-Conference1/14/20151/14/20151/15/2015PDONE
DetailsDave Hannah
Richard Phone #: ###-####
Override - Parcel Holds  8/29/2014  
Issue PAID IN FULL permit  8/29/2014 DONE
DetailsTisha Gallop
Plan assigned to (AJS)6/25/20146/25/20148/26/2014 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed Due 7/21 Level 3 TI - Paper - One Capitol Center Exterior Plaza
Routing - PLAN CHECK8/26/2014 8/26/2014 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  8/26/2014 DONE
Case Summary (BLD)  8/26/2014 DONE
DetailsAdele J Schaffeld-Griffin
Inspection Record Card- Bld  8/26/2014 DONE
DetailsChristina Prado
Telephone call  8/26/2014 DONE
DetailsCandy A. Nichols
called Megan and told her the permits were ready and how much is owed. Also told her we need the GC and RP
Override - Parcel Holds  8/26/2014  
Permit Ready to Issue  8/26/2014 DONE
DetailsCandy A. Nichols
called Megan and told her the permits were ready and how much is owed. Also told her we need the GC and RP
Plan resubmittals received  8/19/2014 DONE
DetailsCandy A. Nichols
resubmitted plans came in today-2 sheets of each: a0.01, c1.1, c1.2, a1.10, a1.11, a1.12-transmittal sheet from erstad architects & response letter -took to Adele
Route to Impact Fee Review7/30/20148/2/20147/30/2014 PASS
DetailsCindy M. Gould
site work only no impact fees
Routing - FIRE7/22/20147/22/20147/23/2014 PASS
DetailsCraig D. Hanson
No Report, No corrections required.
1st review completed  7/23/2014 FAIL
Failed: Plan Check
Routing - PLAN CHECK7/10/2014 7/22/2014 FAIL
DetailsAdele J Schaffeld-Griffin
Routing PW Solid Waste6/26/2014 7/10/2014 PASS
DetailsPeter J. McCullough
Approved by PJM and signoff by Jennifer Bruner.
Routing - PLUMBING7/2/2014 7/2/2014 PASS
DetailsBill VanDegrift
No review required..
Routing - Erosion and Sediment7/1/2014 7/2/2014 PASS
DetailsAndy J. Long
ESC site map and SWPPP narrative submitted and approved. Valid PD, RP to be designated.
Routing - Design Review7/2/2014 7/2/2014 PASS
DetailsJosh Wilson
Josh Wilson - DRH14-00214
Routing - PUBLIC WORKS  7/1/2014 PASS
Routing PW Street Lights  6/30/2014 PASS
DetailsMike D Hedge
Routing PW Drainage6/26/2014 6/26/2014 PASS
DetailsBrian Murphy
Routing PW Sewer Rating6/26/2014 6/26/2014 PASS
DetailsJennifer Bruner
Routing - Addressing6/25/2014 6/26/2014 PASS
DetailsJason C. Taylor
Pending Assignment by JCB6/23/2014 6/26/2014 DONE
DetailsJason Blais
Plans ACCEPTED BY PLAN TECH  6/23/2014 DONE
DetailsChristina Prado
Intake Approval  6/23/2014 PASS
DetailsCarl D Madsen
Recd Pcfee & Taken To Pln CK  6/23/2014 DONE
DetailsChristina Prado
Application received 6/23/2014