Second Notice | | 5/20/2017 | 6/13/2017 | | DONE |
|
|
|
sent in mail 6-14-17
|
First Notice | | 4/16/2017 | 5/10/2017 | | DONE |
|
|
|
sent in mail 5-11-17
|
BLD-Final | 4/5/2017 | 4/6/2017 | 4/6/2017 | A | PASS |
Jim Storey
|
|
|
Matt ###-####
|
Permanent Occupancy | | | 4/6/2017 | | DONE |
|
|
|
|
BLD-Final | 3/30/2017 | 3/31/2017 | 4/5/2017 | A | DEFR |
Jim Storey
|
|
|
Matt ###-####
|
Zoning Approval | 4/3/2017 | 4/3/2017 | 4/3/2017 | | PASS |
Sarah Schafer
|
|
|
|
BLD-Final | 3/22/2017 | 3/30/2017 | 3/31/2017 | P | DEFR |
Jim Storey
|
|
|
Matt ###-####
|
Telephone call | | | 3/30/2017 | | DONE |
|
|
|
emailed Sarah Schafer-customer says she did the inspection but there is nothing in Tidemark-i asked her to sign off if the inspection passed
|
FIRE-Final Inspection | 3/22/2017 | 3/29/2017 | 3/29/2017 | A | PASS |
Jim Page
|
|
|
Exit discharge to pool area is complete, final life fire safety inspection passed/complete.
|
PubWorks Occupancy Approval | 3/14/2017 | 3/14/2017 | 3/14/2017 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Framing/Rough-in | 3/6/2017 | 3/7/2017 | 3/7/2017 | A | PASS |
Jim Storey
|
|
|
Corey Phone #: ###-####
|
Temporary Occupancy | 1/31/2017 | 5/1/2017 | 1/31/2017 | | DONE |
Kristal Soland
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/31/2017 | | DONE |
|
|
|
|
FIRE-Final Inspection | 1/26/2017 | 1/30/2017 | 1/30/2017 | A | CANC |
Jim Page
|
|
|
|
BLD-Final | 1/24/2017 | 1/27/2017 | 1/27/2017 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
FIRE-Conference | 1/25/2017 | 1/26/2017 | 1/26/2017 | P | DONE |
Jim Page
|
|
|
Fire conference complete
|
FIRE-Final Inspection | 1/18/2017 | 1/20/2017 | 1/20/2017 | A | PART |
Jim Page
|
|
|
Partial final inspection for life fire safety complete, no fire sprinklers, fire alarm inspection is complete, fire extinguishers are in place with current inspection tags, knox box will be mounted in discussed location. Life safety will not be completed until pool area is complete and the life safety inspection for that permit is complete.
|
FIRE-Conference | 1/13/2017 | 1/13/2017 | 1/13/2017 | P | DONE |
Jim Page
|
|
|
Fire conference complete
|
OVERRIDE | | | 11/7/2016 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/7/2016 | | DONE |
|
|
|
Plan Mod
|
(F) Reprint permit | | | 11/7/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/7/2016 | | DONE |
|
|
|
DO NOT RE ISSUE PLAN MOD
|
Plan assigned to (CJW) | 11/3/2016 | 11/3/2016 | 11/4/2016 | | PASS |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 11/3/2016 | | 11/4/2016 | | PASS |
Carl Westfall
|
|
|
Plan mod completed - no charge)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/4/2016 | | DONE |
|
|
|
Plan mod completed - no charge
|
Plan Modification Accepted | | | 11/3/2016 | | DONE |
|
|
|
plan mod accepted in e plan
|
BLD-Wall cover | 10/25/2016 | 10/26/2016 | 10/26/2016 | A | PASS |
Jim Storey
|
|
|
Insulation inspection Phone #: ###-#### Inspection requested via web by Corey Hockersmith truss with in 6 inches bearing aproved by truss mfg.
|
BLD-Framing/Rough-in | 10/20/2016 | 10/21/2016 | 10/21/2016 | A | PART |
Jim Storey
|
|
|
Club House Framing Phone #: ###-#### Inspection requested via web by Corey Hockersmith truss bearing at restarm/ header at hvac duct/ ok to insulate
|
BLD-Framing/Rough-in | 10/20/2016 | 10/20/2016 | 10/20/2016 | P | NR |
Jim Storey
|
|
|
Club House Framing Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Framing/Rough-in | 10/17/2016 | 10/18/2016 | 10/18/2016 | A | FAIL |
Jim Storey
|
|
|
Club House Framing Phone #: ###-#### Inspection requested via web by Corey Hockersmith c/n
|
(F) Reprint permit | | | 10/17/2016 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/17/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 10/12/2016 | | |
|
|
|
|
Permit Ready to Issue | | | 10/12/2016 | | DONE |
|
|
|
PLAN MOD DO NOT RE-ISSUE
|
Plan assigned to (CJW) | 10/7/2016 | 10/7/2016 | 10/11/2016 | | PASS |
Carl Westfall
|
|
|
|
Plan Modification Accepted | | | 10/11/2016 | | DONE |
|
|
|
Upload completed
|
Routing - PLAN CHECK | 10/11/2016 | | 10/11/2016 | | PASS |
Carl Westfall
|
|
|
7th plan mod approved
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/11/2016 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 10/10/2016 | | DONE |
|
|
|
Jamie had not uploaded all revised drawings. Returned the workflow back to him so that he could finish.
|
CHANGE STATUS TO (ISS) | | | 10/7/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/7/2016 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 10/7/2016 | | DONE |
|
|
|
Plan modification as requested by Architect, I have several ASI’s I’m uploading this morning. These represent changes the owner requested as well as changes due to inspector comments.
The last couple of drawings I uploaded for review were the changes to the Club House and the pull down rated attic stair in all In-Town Buildings.
This next set of changes have to do with…
Final coordination with electrical and pool design. (minor changes to coordinate electrical switches, outlets, etc… from our electrical drawings and the final approved pool drawings)
Bike storage and maintenance rooms. (This was added by the owner as another amenity for the residence, since the clientele is going to be the young, active, outdoors type. We are playing “catch up” with the drawings.)
Lighting package. (Our Electrical drawings updated their fixture schedule to match the lighting fixtures selected and installed by the Interior Designer.)
Mechanical corrections. (Transfer grills were added in all bedrooms, fire damper was added at mechanical room at the In-Town corridors per inspector’s comments. Our mechanical drawings have been updated.)
Attic Hatch Change. (Per our discussion a few days ago, we are locating the rated attic access hatch into the wall of the flat roof access way)
|
OVERRIDE | | | 9/7/2016 | | |
|
|
|
|
Permit Ready to Issue | | | 9/7/2016 | | DONE |
|
|
|
plan mod fees due - DO NOT RE-ISSUE
|
Plan assigned to (CJW) | 8/29/2016 | 8/29/2016 | 9/6/2016 | | PASS |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 8/29/2016 | | 9/6/2016 | | PASS |
Carl Westfall
|
|
|
6th plan mod
|
Routing - MECHANICAL | 8/31/2016 | | 9/6/2016 | | PASS |
Troy James
|
|
|
|
Routing PW Drainage | 9/6/2016 | | 9/6/2016 | | PASS |
Brian Murphy
|
|
|
Looks like a change to the storm water
|
Routing - PUBLIC WORKS | 9/6/2016 | | 9/6/2016 | | PASS |
Rachael Beierle
|
|
|
For drainage to review plan mod
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/6/2016 | | DONE |
|
|
|
|
Routing - Design Review | 8/31/2016 | | 9/1/2016 | | PASS |
Sarah Schafer
|
|
|
|
Plan Modification Accepted | | | 8/29/2016 | | DONE |
Christina Prado
|
|
|
changes from the last couple of weeks, parts of ASI 55, 56, and 57.
The last ASI 57 is very critical, sheets A3.4, A3.5 and A6.5 have a new detail for a rated pull-down attic access ladder as required by the mechanical inspector. This is critical for receiving a TCO.
|
CHANGE STATUS TO (ISS) | | | 8/16/2016 | | DONE |
|
|
|
Plan Mod
|
(F) Reprint permit | | | 8/16/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 8/9/2016 | | |
|
|
|
|
Plan assigned to (CJW) | 7/27/2016 | 7/27/2016 | 8/9/2016 | | PASS |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 8/1/2016 | | 8/9/2016 | | PASS |
Carl Westfall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/9/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/9/2016 | | DONE |
|
|
|
plan mod fees due - DO NOT RE-ISSUE
|
Routing - PLUMBING | 8/1/2016 | | 8/2/2016 | | PASS |
Daryl Spivey
|
|
|
vent required on sink trap
|
Plan Modification Accepted | | | 7/27/2016 | | DONE |
Christina Prado
|
|
|
As requested by Jamie to update pluming shhets to match pool submittal
|
(F) Reprint permit | | | 7/11/2016 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/11/2016 | | DONE |
|
|
|
plan mod fees paid
|
OVERRIDE | | | 7/5/2016 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/5/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/5/2016 | | DONE |
Christina Prado
|
|
|
Plan Mod fees due, DO NOT RE-ISSUE
|
Plan assigned to (CJW) | 5/16/2016 | | 7/5/2016 | | PASS |
Carl Westfall
|
|
|
(May 24 - 5 days) plan mod
|
Routing Off Site - STRUCTURAL | 6/28/2016 | | 7/1/2016 | | PASS |
Carl Westfall
|
|
|
(Jan Welch was the Consultant Structural Engineer) A plan mod was submitted to create a large opening in the exterior wall between the swimming pool and the club building. Sliding door panels were to be placed in the large opening. Drawings for the structural changes were reviewed by the Consultant Structural Engineer and by the IBC Plans Examiner and the required corrections were noted. It was determined that doors in a pool enclosure are requried to be self closing and self latching. The exterior wall between the club building and the swimming pool was determined to be part of the pool enclosure. Since the sliding wall panels were not allowed, the design went back to what was originally approved. CJW
|
Plan resubmittals received | | | 6/28/2016 | | DONE |
|
|
|
Overhead doors and sliding doors were not allowed in the building exterior walls between the building and the swimming pool. Such exterior walls are part of the pool enclosure and doors must be self-closing and self-latching. Design reverted back to the original.
|
Routing - PLAN CHECK | 6/28/2016 | | 6/28/2016 | | PASS |
Carl Westfall
|
|
|
Overhead doors and sliding doors were not allowed in the building exterior walls between the building and the swimming pool. Such exterior walls are part of the pool enclosure and doors must be self-closing and self-latching. Design changed back to the original.
|
Routing - PLAN CHECK | 5/17/2016 | | 6/6/2016 | | FAIL |
Carl Westfall
|
|
|
Provide self-closing and self-latching doors in the pool enclosure that is also the building exterior wall located between the buildings and the pool.
|
Plan resubmittals requested | | | 6/6/2016 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 5/18/2016 | | 5/25/2016 | | FAIL |
Carl Westfall
|
|
|
|
Routing - Design Review | 5/18/2016 | | 5/19/2016 | | PASS |
Sarah Schafer
|
|
|
|
Plan Modification Accepted | | | 5/17/2016 | | DONE |
|
|
|
Workflow in ePlanReview received
|
Plan Modification Accepted | | | 5/16/2016 | | DONE |
Christina Prado
|
|
|
For structural updates to the Clubhouse, to create a new opening onto pool.
|
OVERRIDE | | | 3/4/2016 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 3/4/2016 | | DONE |
Christina Prado
|
|
|
Deferred submittal approved, plans changes to ISS status
|
Routing - PLAN CHECK | 2/29/2016 | | 3/4/2016 | | PASS |
Carl Westfall
|
|
|
(3-1-16) Applicant asked that the plan modification review be on hold until further notice.
(3-3-16) Structural calculations to support the glu-lam beam and colum design were requested via Email.
(3-4-16) Turned out to be a deferred submittal for the glu-lam beam and column design at the clubhouse and fitness buildings. Application approved.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/4/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/4/2016 | | DONE |
Christina Prado
|
|
|
Deferred submittal approved, plans changes to ISS status
|
Plan assigned to (CJW) | 2/29/2016 | | 3/4/2016 | | PASS |
Carl Westfall
|
|
|
Plan Mod.
|
Plan Modification Accepted | | | 3/2/2016 | | DONE |
|
|
|
Revised sheets uploaded and now ready for routing
|
Plan Modification Accepted | | | 2/29/2016 | | DONE |
|
|
|
Workflow in ePlanReview received
|
Plan Modification Accepted | | | 2/23/2016 | | DONE |
|
|
|
started workflow
|
BLD-Aging Inspection | 2/16/2016 | 2/16/2016 | 2/16/2016 | | NR |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 2/15/2016 | 2/15/2016 | 2/16/2016 | | NR |
Jim Storey
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/20/2016 | | DONE |
|
|
|
all fees paid
|
(F) Reprint permit | | | 1/20/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 12/14/2015 | | |
|
|
|
|
Routing - PLAN CHECK | 11/20/2015 | | 12/14/2015 | | PASS |
Carl Westfall
|
|
|
Routing completed
|
Plan assigned to (CJW) | 11/17/2015 | | 12/14/2015 | | PASS |
Carl Westfall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/14/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/14/2015 | | DONE |
Christina Prado
|
|
|
DO NOT RE-ISSUE!!!!
Plan Mod only
|
Routing Off Site - STRUCTURAL | 11/20/2015 | | 12/11/2015 | | PASS |
Carl Westfall
|
|
|
Jan Welch
|
Plan Modification Accepted | | | 11/17/2015 | | DONE |
|
|
|
The 3 structural sheets would not load properly. Something wrong with the files. Spent a lot of time trying to figure out how to get them to load.
|
BLD-Conference | 10/23/2015 | 10/23/2015 | 10/23/2015 | A | PASS |
Jim Storey
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/2/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 8/25/2015 | | |
|
|
|
|
Plan assigned to (CJW) | 8/21/2015 | 8/21/2015 | 8/25/2015 | | PASS |
Carl Westfall
|
|
|
Plan Mod - ePlanReview - The District Club Building
|
Routing - PLAN CHECK | 8/21/2015 | | 8/25/2015 | | PASS |
Carl Westfall
|
|
|
Drawings not versioned correctly and oriented wrong.
(8-25-15) Plan modification to provide exterior expanded polystyrene foundation insulation in compliance with shallow foundation standards at locations where the bottom of the footings will be less than 24 inches below finished grade. The intent is to prevent frost heave. The plan mod only involved the following buildings:
Intown Building A - #1 (537 E. Parkcenter Blvd.) (BLD14-01826 / BLD14-01827)
Intown Building A - #2 (509 E. Parkcenter Blvd.) (BLD14-01828 / BLD14-01829)
Intown Building B - #1 (533 E. Parkcenter Blvd.) (BLD14-01830 / BLD14-01831)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/25/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/25/2015 | | DONE |
|
|
|
plan mod fees need to be paid- DO NOT re-issue (6 other permits need status change along with this one; see attached)
|
Plan Modification Accepted | | | 8/21/2015 | | DONE |
Christina Prado
|
|
|
Per Jamie - Plan mod accepted for minor changes to footing details, perimiter insulation & civil elevations
|
Print Occupancy Form | | | 4/2/2015 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 4/2/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 4/1/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 4/1/2015 | | DONE |
|
|
|
need gc form, updated values, ACHD receipt, RP
|
Routing - PLAN CHECK | 2/25/2015 | | 3/31/2015 | | PASS |
Carl Westfall
|
|
|
All agencies approved
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/31/2015 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 7/22/2014 | | 3/31/2015 | | PASS |
Carl Westfall
|
|
|
CLUB BUILDING (1st review done) (30 days - Sept 1)
|
Routing Off Site - STRUCTURAL | 2/26/2015 | | 3/30/2015 | | PASS |
Carl Westfall
|
|
|
Jan Welch
|
Routing PW Flood Plain | 2/26/2015 | | 3/30/2015 | | PASS |
Jim Wyllie
|
|
|
|
Routing - MECHANICAL | 3/10/2015 | | 3/10/2015 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 2/26/2015 | | 2/27/2015 | | FAIL |
Troy James
|
|
|
Troy
|
Routing - Design Review | 2/26/2015 | | 2/27/2015 | | PASS |
Sarah Schafer
|
|
|
Sarah - Approved per DRH12-00038 and DRH15-00030.
|
Routing - PLAN CHECK | 2/25/2015 | | 2/26/2015 | | |
Carl Westfall
|
|
|
Fixed file names for correct versioning. Several needed to be fixed. Waiting for approval from Structural.
|
Plan resubmittals received | | | 2/25/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/23/2015 | | 2/11/2015 | | FAIL |
Carl Westfall
|
|
|
Failed structural
|
Routing Off Site - STRUCTURAL | 1/26/2015 | | 2/11/2015 | | FAIL |
Carl Westfall
|
|
|
Jan Welch
|
Plan resubmittals requested | | | 2/11/2015 | | DONE |
|
|
|
|
Routing - Design Review | 1/26/2015 | | 1/30/2015 | | FAIL |
Sarah Schafer
|
|
|
Design Review Modification required. Applicant and their attorney have been notified.
|
Routing - MECHANICAL | 1/26/2015 | | 1/27/2015 | | FAIL |
Troy James
|
|
|
|
Routing - PLANNING | 1/26/2015 | | 1/26/2015 | | PASS |
Cody Riddle
|
|
|
|
Plan resubmittals received | | | 1/23/2015 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 12/9/2014 | | 12/29/2014 | | FAIL |
Carl Westfall
|
|
|
Jan Welch
|
Routing - PLAN CHECK | 12/13/2014 | | 12/29/2014 | | FAIL |
Carl Westfall
|
|
|
Waiting for the resolution of the structural issues.
|
Plan resubmittals requested | | | 12/29/2014 | | DONE |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 12/9/2014 | | 12/13/2014 | | PASS |
Carl Westfall
|
|
|
For the building review, the structural issues have not been resolved.
|
Plan resubmittals received | | | 12/11/2014 | | DONE |
|
|
|
More revised drawings were Emailed to me. I uploaded them. The revisions appeared to be minor.
|
Routing - MECHANICAL | 12/9/2014 | | 12/10/2014 | | FAIL |
Troy James
|
|
|
|
Routing PW Street Lights | 12/9/2014 | | 12/10/2014 | | PASS |
Mike D Hedge
|
|
|
|
Routing - Design Review | 12/9/2014 | | 12/10/2014 | | FAIL |
Sarah Schafer
|
|
|
The elevations don't match those approved under the Design Review application. A modification must be processed for the building permit to move forward.
|
Routing - PLANNING | 12/9/2014 | | 12/9/2014 | | FAIL |
Cody Riddle
|
|
|
One outstanding condition of approval:
Condition #22-The Army Corps required an updated wetland delineation. (We need final written approval from the Corps before we can issue the permit)
Emailed applicant today.
|
Plan resubmittals received | | | 12/8/2014 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 10/22/2014 | | 11/7/2014 | | FAIL |
Carl Westfall
|
|
|
Jan Welch
|
Plan resubmittals requested | | | 11/7/2014 | | DONE |
|
|
|
|
Routing PW Drainage | 10/22/2014 | | 10/29/2014 | | PASS |
Brian Murphy
|
|
|
|
Routing - FIRE | 10/22/2014 | | 10/28/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review Rev 1 10-28-14
|
Routing - PLAN CHECK | 10/16/2014 | | 10/23/2014 | | FAIL |
Carl Westfall
|
|
|
Some issues not resolved
|
Routing - Erosion and Sediment | 10/22/2014 | | 10/22/2014 | | PASS |
Evan Jenkins
|
|
|
(CLUB BUILDING) (TOTAL OF 15 PERMITS ARE ASSOCIATED WITH THE DRAWINGS FILED UNDER THIS PERMIT IN EPLANREVIEW) This building does NOT have a fire sprinkler system. To construct a new 3,969 square foot one story building to be used as a club building for the apartment occupants on this site. Work is to include 2 restrooms accessible to the disabled, “high” and “low” drinking fountains, interior nonbearing walls, interior windows and doors, exterior windows and doors, insulated exterior walls, exterior siding, exterior thin-cut stone, standing seam metal roof coverings, single ply roof coverings, continuous foam plastic insulation installed on top of the roof decks, suspended gypsum board ceilings, millwork, and finishes. Structural work includes concrete footings, concrete stem walls, concrete floor slabs on grade with thickened footings at interior bearing walls, glu-lam beams, glu-lam columns, roof trusses, roof joists, bearing walls, wood columns, wood beams, and shear walls. Special inspection is required for soils, concrete, and wood. A separate permit is required for the swimming pool and the barrier around it. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances.
|
Routing PW Street Lights | 10/22/2014 | | 10/22/2014 | | FAIL |
Mike D Hedge
|
|
|
Street lights required, no lighting indicated on drawings.
|
Routing - Design Review | 10/22/2014 | | 10/22/2014 | | FAIL |
Sarah Schafer
|
|
|
A design review modification is required. An e-mail has been sent to Taylor and copied to Chris Stephens with the requirements.
|
Routing - PLANNING | 10/22/2014 | | 10/22/2014 | | FAIL |
Cody Riddle
|
|
|
Two outstanding issues with conditions of approval. Emailed applicant today;
Condition #15-All amenities shall be constructed or bonded for prior to issuance of building permits. (We need the bond before I can sign-off on the permit)
Condition #22-The Army Corps required an updated wetland delineation. (We need final written approval from the Corps before we can issue the permit)
|
Routing - MECHANICAL | 10/22/2014 | | 10/22/2014 | | FAIL |
Troy James
|
|
|
comments have not been addressed
|
Plan resubmittals received | | | 10/16/2014 | | DONE |
|
|
|
Significant issues with the resubmittal. Several hours spent getting the drawings ready to route.
|
Routing Off Site - STRUCTURAL | 7/22/2014 | | 8/27/2014 | | FAIL |
Carl Westfall
|
|
|
Since the submittal was incomplete, a structural review could not be done.
|
Routing - MECHANICAL | 8/11/2014 | | 8/14/2014 | | FAIL |
Troy James
|
|
|
|
Routing - FIRE | 7/22/2014 | | 8/12/2014 | | FAIL |
Craig D. Hanson
|
|
|
Fire Plan Review 08-12-14
|
1st review completed | | | 8/5/2014 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 8/5/2014 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/22/2014 | | 8/5/2014 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
Route to Impact Fee Review | 7/22/2014 | 7/25/2014 | 8/1/2014 | | PASS |
Cindy M. Gould
|
|
|
No impact fees
|
Routing PW Drainage | 7/22/2014 | | 7/29/2014 | | FAIL |
Brian Murphy
|
|
|
need c 33 sand
|
Routing - PLUMBING | 7/22/2014 | | 7/28/2014 | | PASS |
Daryl Spivey
|
|
|
1) 120 degree max. hot water to public lavs.
2) bathroon ceiling plenum, use approved materials.
3) Change R.P.'s on water services to DCVA
4) all water services require a DCVA.
|
Routing - PLANNING | 7/22/2014 | | 7/24/2014 | | FAIL |
Cody Riddle
|
|
|
Condition #6-A 4’ tall fence shall be installed on the south side of the access easement as it abuts the Logger’s creek riparian area…..(The fence is required on the west side of the bridge, up to the property line. This is not reflected on the plans.)
Condition #13-The plans do not identify 25% covered bicycle parking. (Perhaps these are located in the garages for the cottage buildings? This should be identified.)
Condition #15-All amenities shall be constructed or bonded for prior to issuance of building permits. (We need the bond before I can sign-off on the permit)
Condition #22-The Army Corps required an updated wetland delineation. (We need final written approval from the Corps before we can issue the permit)
|
Routing - Design Review | 7/22/2014 | | 7/24/2014 | | FAIL |
Sarah Schafer
|
|
|
An administrative level Design Review modification is needed for the exterior changes to the buildings. The modification should also reflect compliance with the conditions of approval listed in the July 3, 2014 letter.
|
Routing - Addressing | 7/22/2014 | | 7/24/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing PW Solid Waste | 7/22/2014 | | 7/24/2014 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Sewer Design | 7/22/2014 | | 7/24/2014 | | PASS |
Kyle S. Rosenmeyer
|
|
|
Private Sewer System
|
Routing PW Sewer Rating | 7/22/2014 | | 7/23/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Erosion and Sediment | 7/22/2014 | | 7/23/2014 | | FAIL |
Evan Jenkins
|
|
|
Full ESC Narrative Required
|
Routing PW Street Lights | 7/22/2014 | | 7/23/2014 | | FAIL |
Mike D Hedge
|
|
|
No street lighting drawings submitted, street lights are required.
|
Routing - PLANNING Land Div | 7/22/2014 | | 7/23/2014 | | PASS |
Dave Abo
|
|
|
|
Intake Approval | | | 7/22/2014 | | PASS |
John Menard
|
|
|
|
Pending Assignment by JCM | 7/22/2014 | | 7/22/2014 | | DONE |
John Menard
|
|
|
|
Routing - PUBLIC WORKS | 7/22/2014 | | 7/22/2014 | | PASS |
Beverly Mountain
|
|
|
|
Intake Approval | | | 7/2/2014 | | FAIL |
Tim L. Woodard
|
|
|
Taylor,
Attached is the changes needed to your submittal prior to acceptance of the plans for review. All items circled on checklist need uploaded or revised. Please call with any questions.
Best regards,
Tim Woodard
Plans Examiner II / City of Boise
###-####
twoodard@cityofboise.org
|
Application received | | | 6/30/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 30 2014 6:44AM
|