Permit NumberBLD14-01825
StatusFinaled
Name ESI
Site Address 501 E PARKCENTER BLVD
Project NameThe District at Parkcenter
Customer NumberBLD14-01818 FOR DRAWNGS
ePlanReviewNo
Description
(THE DISTRICT AT PARKCENTER - FITNESS CENTER) (The drawings are filed under permit BLD14-01818 in ePlanReview) This building does not have a fire sprinkler system. To construct a new 2,086 square foot one story building to be used as a fitness building for the apartment occupants on this site. Work is to include 2 restrooms accessible to the disabled, “high” and “low” drinking fountains, interior nonbearing walls, interior doors, exterior windows and doors, insulated exterior walls, exterior siding, exterior manufactured stone, standing seam metal roof coverings, single ply roof coverings, continuous foam plastic insulation installed on top of the roof decks, suspended gypsum board ceilings, millwork, and finishes. Structural work includes concrete footings, concrete stem walls, concrete floor slabs on grade with thickened footings at interior bearing walls, glu-lam beams, glu-lam columns, roof joists, bearing walls, wood columns, wood beams, and shear walls. Special inspection is required for soils, concrete, and wood. A separate permit is required for the swimming pool and the barrier around it. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  6/23/2017 DONE
called JT about the final values-MEC & PLM values are way different-left him a message
Second Notice 5/20/20176/13/2017 DONE
sent in mail 6-13-17
First Notice 4/16/20175/10/2017 DONE
sent in mail 5-11-17
BLD-Final4/5/20174/6/20174/6/2017APASS
DetailsJim Storey
Matt ###-####
Permanent Occupancy  4/6/2017 DONE
BLD-Final3/30/20173/31/20174/5/2017ADEFR
DetailsJim Storey
Matt ###-####
Zoning Approval4/3/20174/3/20174/3/2017 PASS
DetailsSarah Schafer
BLD-Final3/22/20173/30/20173/31/2017PDEFR
DetailsJim Storey
Matt ###-####
FIRE-Final Inspection3/22/20173/29/20173/29/2017APASS
DetailsJim Page
Exit discharge to pool area is complete, final life fire safety inspection passed/complete.
BLD-Final1/30/20171/31/20171/31/2017PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Corey Hockersmith
Temporary Occupancy1/31/20175/1/20171/31/2017 DONE
DetailsKristal Soland
BLD-Final1/24/20171/27/20171/26/2017ACANC
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Corey Hockersmith Inspection cancelled from web by: Corey Hockersmith
FIRE-Final Inspection1/24/20171/25/20171/25/2017APART
DetailsKatie Marron
Life Safety inspection complete. Left pair of double doors to patio area needs repair, exit will not be allowed through door until patio area is complete.
BLD-Final1/24/20171/25/20171/24/2017ACANC
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Corey Hockersmith Inspection cancelled from web by: Corey Hockersmith
FIRE-Conference1/13/20171/13/20171/13/2017PDONE
DetailsJim Page
Fire conference complete
BLD-Framing/Rough-in10/7/201610/7/201610/7/2016PPART
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Corey Hockersmith. Straping not verified OK to insulate
BLD-Framing/Rough-in9/28/201610/4/201610/4/2016ANR
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Corey Hockersmith. Missing nails in hangers at entery Check on straping.
BLD-Wall Bracing7/7/20167/11/20167/11/2016APASS
DetailsJim Storey
Wall and roof sheer Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Wall Bracing7/6/20167/7/20167/7/2016AFAIL
DetailsJim Storey
Wall and roof sheer Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Wall Bracing6/28/20166/29/20166/29/2016PFAIL
DetailsJim Storey
Roof and wall sheer Phone #: ###-#### Inspection requested via web by Corey Hockersmithc/n
BLD-Wall Bracing5/31/20166/1/20166/1/2016APASS
DetailsJim Storey
Roof and wall sheer Phone #: ###-#### Inspection requested via web by Corey Hockersmithc/n made ok
BLD-Aging Inspection2/16/20162/16/20162/16/2016 NR
DetailsJim Storey
BLD-Aging Inspection2/15/20162/15/20162/16/2016 NR
DetailsJim Storey
Print Occupancy Form  4/2/2015 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  4/2/2015 DONE
Permit Ready to Issue  4/1/2015 DONE
need gc form, updated values, ACHD receipt, RP
Routing - PLAN CHECK2/25/2015 3/31/2015 PASS
DetailsCarl Westfall
All agencies approved
PLANS/APPL TAKEN TO FRONT DESK  3/31/2015 DONE
Plan assigned to (CJW)7/22/2014 3/31/2015 PASS
DetailsCarl Westfall
FITNESS CENTER (1st review done)
Routing Off Site - STRUCTURAL2/26/2015 3/30/2015 PASS
DetailsCarl Westfall
Routing PW Flood Plain2/26/2015 3/30/2015 PASS
DetailsJim Wyllie
Routing - MECHANICAL3/10/2015 3/10/2015 PASS
DetailsTroy James
Routing - MECHANICAL2/26/2015 2/27/2015 FAIL
DetailsTroy James
Routing - Design Review2/26/2015 2/27/2015 PASS
DetailsSarah Schafer
Sarah - Approved per DRH12-00038 and DRH15-00030.
Routing - PLAN CHECK2/25/2015 2/26/2015  
DetailsCarl Westfall
Plan resubmittals received  2/25/2015 DONE
Plan resubmittals requested  2/11/2015 DONE
Routing Off Site - STRUCTURAL1/26/2015 2/11/2015 FAIL
DetailsCarl Westfall
Jan Welch
Routing - PLAN CHECK1/23/2015 2/11/2015 FAIL
DetailsCarl Westfall
Routing - Design Review1/26/2015 1/30/2015 FAIL
DetailsSarah Schafer
Routing - MECHANICAL1/26/2015 1/27/2015 FAIL
DetailsTroy James
Routing - PLANNING1/26/2015 1/26/2015 PASS
DetailsCody Riddle
Plan resubmittals received  1/23/2015 DONE
Routing Off Site - STRUCTURAL12/9/2014 12/29/2014 FAIL
DetailsCarl Westfall
Routing - PLAN CHECK12/13/2014 12/29/2014 FAIL
DetailsCarl Westfall
Waiting for the resolution of the structural issues.
Plan resubmittals requested  12/29/2014 DONE
DetailsCarl Westfall
Routing - PLAN CHECK12/9/2014 12/13/2014 PASS
DetailsCarl Westfall
For the building review, the structural issues have not been resolved.
Plan resubmittals received  12/11/2014 DONE
DetailsCarl Westfall
Routing PW Street Lights12/9/2014 12/10/2014 PASS
DetailsMike D Hedge
Routing - MECHANICAL12/9/2014 12/10/2014 FAIL
DetailsTroy James
Routing - Design Review12/9/2014 12/10/2014 FAIL
DetailsSarah Schafer
Routing - PLANNING12/9/2014 12/9/2014 FAIL
DetailsCody Riddle
One outstanding condition of approval:

Condition #22-The Army Corps required an updated wetland delineation. (We need final written approval from the Corps before we can issue the permit)

Emailed applicant today. (Note: I updated activity from the master permit BLD14-01818.)
Plan resubmittals received  12/8/2014 DONE
DetailsCarl Westfall
Routing Off Site - STRUCTURAL10/22/2014 11/7/2014 FAIL
DetailsCarl Westfall
Jan Welch
Plan resubmittals requested  11/7/2014 DONE
Routing - PLAN CHECK10/16/2014 10/29/2014 FAIL
DetailsCarl Westfall
Some items not resolved
Routing PW Drainage10/22/2014 10/29/2014 PASS
DetailsBrian Murphy
Routing - FIRE10/22/201410/22/201410/28/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review Rev 1 10-28-14
Routing - Design Review10/22/2014 10/22/2014 FAIL
DetailsSarah Schafer
A Design Review modification is required. An e-mail has been sent to Taylor and Chris Stephens with a copy of the application and requirements.
Routing - MECHANICAL10/22/2014 10/22/2014 FAIL
DetailsTroy James
Routing PW Street Lights10/22/2014 10/22/2014 FAIL
DetailsMike D Hedge
Routing - Erosion and Sediment10/22/2014 10/22/2014 PASS
DetailsEvan Jenkins
Routing - PLANNING10/22/2014 10/22/2014 FAIL
DetailsCody Riddle
Plan resubmittals received  10/16/2014  
Routing - PLAN CHECK7/22/2014 8/30/2014 FAIL
DetailsCarl Westfall
Plan resubmittals requested  8/30/2014 DONE
1st review completed  8/29/2014 FAIL
Routing Off Site - STRUCTURAL7/22/2014 8/27/2014 FAIL
DetailsCarl Westfall
Since the submittal was incomplete, a structural review could not be done.
Routing - MECHANICAL8/11/2014 8/14/2014 FAIL
DetailsTroy James
Routing - FIRE7/29/20147/29/20148/12/2014 FAIL
DetailsCraig D. Hanson
See Fire Plan Review 08-12-14
Route to Impact Fee Review7/22/2014 8/1/2014 PASS
DetailsCindy M. Gould
Routing PW Drainage7/22/2014 7/29/2014 FAIL
DetailsBrian Murphy
Routing - PLUMBING7/22/2014 7/28/2014 PASS
DetailsBill VanDegrift
Routing - PLANNING7/22/2014 7/24/2014 FAIL
DetailsCody Riddle
Routing PW Solid Waste7/22/2014 7/24/2014 PASS
DetailsPeter J. McCullough
Routing - Design Review7/22/2014 7/24/2014 FAIL
DetailsSarah Schafer
Routing - Addressing7/24/2014 7/24/2014 PASS
DetailsEmily Dixon
Routing PW Sewer Design7/24/2014 7/24/2014 PASS
DetailsKyle S. Rosenmeyer
Private Sewer System
Routing - PUBLIC WORKS7/23/2014 7/23/2014 PASS
DetailsBeverly Mountain
Routing PW Street Lights7/22/2014 7/23/2014 FAIL
DetailsMike D Hedge
Routing - PLANNING Land Div7/22/2014 7/23/2014 PASS
DetailsDave Abo
Routing PW Sewer Rating7/22/2014 7/23/2014 PASS
DetailsBeverly Mountain
Routing - Erosion and Sediment7/22/2014 7/23/2014 FAIL
DetailsEvan Jenkins
Intake Approval  7/22/2014 PASS
DetailsJohn Menard
Pending Assignment by JCM7/22/2014 7/22/2014 DONE
DetailsJohn Menard
Intake Approval  7/2/2014 FAIL
DetailsTim L. Woodard
Application received  6/30/2014 DONE
Application submitted via PDS Online on Jun 30 2014 6:44AM