Information based on query as of Sunday, June 23, 2024.
Permit Information
Permit NumberBLD14-01827
StatusFinaled
Name ESI
Site Address 537 E PARKCENTER BLVD
Project NameThe District at Parkcenter
Customer NumberBLD14-01818 FOR DRAWNGS
ePlanReviewNo
Description
(THE DISTRICT AT PARKCENTER - INTOWN BUILDING A - #1) (The drawings are filed under permit BLD14-01818 in ePlanReview) (11-17-15 PLAN MODIFICATION TO RE-DESIGN THE STRUCTURAL SYSTEM FROM THE FOUNDATION UP. REVISED STRUCTURAL DRAWINGS ARE FILED UNDER BLD14-01826 IN EPLANREVIEW.) (8-25-15 PLAN MODIFICATION TO PROVIDE EXTERIOR EXPANDED POLYSTYRENE FOUNDATION INSULATION IN COMPLIANCE WITH SHALLOW FOUNDATION STANDARDS AT LOCATIONS WHERE THE BOTTOM OF THE FOOTINGS WILL BE LESS THAN 24 INCHES BELOW FINISHED GRADE. THE INTENT IS TO PREVENT FROST HEAVE.) Because there is a fire wall in this building, two permits were created. See BLD14-01826 for a full description of the work proposed. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  1/31/2017 DONE
BLD-Final1/27/20171/30/20171/30/2017PPASS
DetailsJim Storey
cory Phone #: ###-####
FIRE-Final Inspection1/30/20171/30/20171/30/2017APASS
DetailsJim Page
Final life fire safety inspection passed/complete
BLD-Final12/13/201612/14/201612/14/2016PPART
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Corey Hockersmithtemp ok
FIRE-Final Inspection12/14/201612/14/201612/14/2016APART
DetailsJim Page
Partial final life fire safety inspection complete, final fire sprinkler inspection is complete, partial final fire alarm inspection is complete (fire alarm inspection complete for occupancy requested area's), knox box is in place, fire extinguishers are in place with current inspection tags. Building fire sub-panel reports to clubhouse main fire panel, life fire safety will be a partial pass until clubhouse is done as well as completion of fire alarm inspection for remaining area's of builiding including water damaged area's.
Temporary Occupancy12/14/20163/14/201712/14/2016 DONE
DetailsCandy A. Nichols
pending all permit finals
BLD-Final12/9/201612/14/201612/13/2016ADEFR
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Corey Hockersmith pm
FIRE-Final Inspection12/9/201612/13/201612/13/2016PCANC
DetailsJim Page
Area of building being requested for occupancy is not ready for occupancy, inspection request will need to be rescheduled when work is complete.
FIRE-Final Inspection12/9/201612/9/201612/9/2016PCANC
DetailsJim Page
Phone #: ###-#### >> Inspection requested via web by Corey Hockersmith Inspection cancelled from web by: Corey Hockersmith
BLD-Other8/24/20168/25/20168/25/2016APASS
DetailsJim Storey
Third floor bathroom ceilings Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Other8/24/20168/24/20168/24/2016APART
DetailsJim Storey
Third floor bathroom cilings Phone #: ###-#### Inspection requested via web by Corey Hockersmith c/n posted
BLD-Other8/10/20168/10/20168/10/2016PPASS
DetailsJim Storey
Second floor bathroom ceilings Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Ceiling Grid Inspection8/4/20168/5/20168/5/2016APASS
DetailsJim Storey
First floor bathroom ceilings Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Ceiling Grid Inspection7/21/20167/22/20167/22/2016PPASS
DetailsJim Storey
Third floor RC ceiling inspection Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Ceiling Grid Inspection7/18/20167/19/20167/19/2016APASS
DetailsJim Storey
Second floor RC inspection Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Ceiling Grid Inspection7/18/20167/18/20167/18/2016PDEFR
DetailsJim Storey
Second floor RC inspection Phone #: ###-#### Inspection requested via web by Corey Hockersmith. out of time
BLD-Wall cover7/15/20167/15/20167/15/2016PNR
DetailsJim Storey
Second floor RC Inspection Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Framing/Rough-in7/14/20167/15/20167/15/2016APART
DetailsJim Storey
Third floor framing inspection Phone #: ###-#### Inspection requested via web by Corey Hockersmith ok to insulate
BLD-Ceiling Grid Inspection7/11/20167/11/20167/11/2016PPASS
DetailsJim Storey
First floor RC inspection Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Framing/Rough-in7/7/20167/8/20167/8/2016APART
DetailsJim Storey
Third floor framing inspection Phone #: ###-#### Inspection requested via web by Corey Hockersmithc/n
BLD-Framing/Rough-in7/6/20167/6/20167/6/2016PPASS
DetailsPhil Shearer
Second floor reinsection Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Framing/Rough-in6/29/20167/1/20167/1/2016APART
DetailsJim Storey
First and second floor framing Phone #: ###-#### Inspection requested via web by Corey Hockersmith 1st ok to insulate/c/n posted
BLD-Framing/Rough-in6/27/20166/29/20166/29/2016PPART
DetailsJim Storey
1st floor framing Phone #: ###-#### Inspection requested via web by Corey Hockersmithc/n
BLD-Wall Bracing5/9/20165/10/20165/10/2016APASS
DetailsJim Storey
Fire rated plywood inspection Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Wall Bracing5/6/20165/9/20165/9/2016APASS
DetailsJim Storey
Roof sheer inspection Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Wall cover5/5/20165/5/20165/5/2016PNR
DetailsJim Storey
Roof nailing and strapping inspection Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Wall Bracing5/4/20165/5/20165/5/2016ANR
DetailsJim Storey
Roof nailing and strapping inspection Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Aging Inspection2/16/20162/16/20162/16/2016 NR
DetailsJim Storey
BLD-Aging Inspection2/15/20162/15/20162/16/2016 NR
DetailsJim Storey
BLD-Conference10/23/201510/26/201510/26/2015APASS
DetailsJim Storey
Meeting with Jim Phone #: ###-#### Inspection requested via web by Corey Hockersmith
CHANGE STATUS TO (ISS)  9/2/2015 DONE
Routing - PLAN CHECK8/21/2015 8/25/2015 PASS
DetailsCarl Westfall
Plan mod approved
PLANS/APPL TAKEN TO FRONT DESK  8/25/2015 DONE
Permit Ready to Issue  8/25/2015 DONE
Plan mod fees on BLD14-01818 need to be paid- DO NOT re-issue
Plan Modification Accepted  8/21/2015 DONE
Print Occupancy Form  4/2/2015 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  4/2/2015 DONE
Permit Ready to Issue  4/1/2015 DONE
need gc form, updated values, ACHD receipt, RP
Routing - PLAN CHECK2/25/2015 3/31/2015 PASS
DetailsCarl Westfall
All agencies approved
PLANS/APPL TAKEN TO FRONT DESK  3/31/2015 DONE
Plan assigned to (CJW)7/22/2014 3/31/2015 PASS
DetailsCarl Westfall
INTOWN BUILDING A - #1 (1st review done)
Routing Off Site - STRUCTURAL2/26/2015 3/30/2015 PASS
DetailsCarl Westfall
Routing PW Flood Plain2/26/2015 3/30/2015 PASS
DetailsJim Wyllie
Routing - MECHANICAL3/10/2015 3/10/2015 PASS
DetailsTroy James
Routing - MECHANICAL2/26/2015 2/27/2015 FAIL
DetailsTroy James
Routing - Design Review1/26/2015 2/27/2015 PASS
DetailsSarah Schafer
Sarah - Approved per DRH12-00038 and DRH15-00030.
Routing - PLAN CHECK2/25/2015 2/26/2015  
DetailsCarl Westfall
Plan resubmittals received  2/25/2015 DONE
Plan resubmittals requested  2/11/2015 DONE
Routing Off Site - STRUCTURAL1/26/2015 2/11/2015 FAIL
DetailsCarl Westfall
Jan Welch
Routing - PLAN CHECK1/23/2015 2/11/2015 FAIL
DetailsCarl Westfall
Routing - Design Review1/26/2015 1/30/2015 FAIL
DetailsSarah Schafer
Routing - MECHANICAL1/26/2015 1/27/2015 FAIL
DetailsTroy James
Routing - PLANNING1/26/2015 1/26/2015 PASS
DetailsCody Riddle
Plan resubmittals received  1/23/2015 DONE
Routing Off Site - STRUCTURAL12/9/2014 12/29/2014 FAIL
DetailsCarl Westfall
Jan Welch
Routing - PLAN CHECK12/13/2014 12/29/2014 FAIL
DetailsCarl Westfall
Waiting for the resolution of the structural issues.
Plan resubmittals requested  12/29/2014 DONE
DetailsCarl Westfall
Routing - PLAN CHECK12/9/2014 12/13/2014 PASS
DetailsCarl Westfall
For the building review, the structural issues have not been resolved.
Plan resubmittals received  12/11/2014 DONE
DetailsCarl Westfall
Routing - PLANNING12/9/2014 12/10/2014 FAIL
DetailsCody Riddle
One outstanding condition of approval:

Condition #22-The Army Corps required an updated wetland delineation. (We need final written approval from the Corps before we can issue the permit)

Emailed applicant today. (Note: I updated activity from the master permit BLD14-01818.)
Routing PW Street Lights12/9/2014 12/10/2014 PASS
DetailsMike D Hedge
Routing - MECHANICAL12/9/2014 12/10/2014 FAIL
DetailsTroy James
Routing - Design Review12/9/2014 12/10/2014 FAIL
DetailsSarah Schafer
Plan resubmittals received  12/8/2014 DONE
DetailsCarl Westfall
Routing Off Site - STRUCTURAL10/22/2014 11/7/2014 FAIL
DetailsCarl Westfall
Jan Welch
Plan resubmittals requested  11/7/2014 DONE
Routing - PLAN CHECK10/16/2014 10/31/2014 FAIL
DetailsCarl Westfall
Some items not resolved
Routing PW Drainage10/22/2014 10/29/2014 PASS
DetailsBrian Murphy
Routing - FIRE10/22/2014 10/28/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review Rev 1 10-29-14
Routing - Design Review10/22/2014 10/22/2014 FAIL
DetailsSarah Schafer
Routing - MECHANICAL10/22/2014 10/22/2014 FAIL
DetailsTroy James
Routing - Erosion and Sediment10/22/2014 10/22/2014 PASS
DetailsEvan Jenkins
Routing - PLANNING10/22/2014 10/22/2014 FAIL
DetailsCody Riddle
Routing PW Street Lights10/22/2014 10/22/2014 FAIL
DetailsMike D Hedge
Plan resubmittals received  10/16/2014  
Routing Off Site - STRUCTURAL7/22/2014 8/27/2014 FAIL
DetailsCarl Westfall
Since the submittal was incomplete, a structural review could not be done.
1st review completed  8/23/2014 FAIL
Plan resubmittals requested  8/23/2014 DONE
Routing - MECHANICAL8/11/2014 8/14/2014 FAIL
DetailsTroy James
Routing - FIRE7/29/20147/29/20148/12/2014 FAIL
DetailsCraig D. Hanson
See Fire Plan Review 08-12-14
Routing - PLAN CHECK7/22/2014 8/5/2014 FAIL
DetailsCarl Westfall
Route to Impact Fee Review7/22/20147/25/20148/1/2014 PASS
DetailsCindy M. Gould
Routing PW Drainage7/22/2014 7/29/2014 FAIL
DetailsBrian Murphy
Routing - PLUMBING7/22/2014 7/28/2014 PASS
DetailsBill VanDegrift
Routing - Design Review7/22/2014 7/24/2014 FAIL
DetailsSarah Schafer
Routing - PLANNING7/22/2014 7/24/2014 FAIL
DetailsCody Riddle
Routing - Addressing7/24/2014 7/24/2014 PASS
DetailsEmily Dixon
Routing PW Sewer Design7/24/2014 7/24/2014 PASS
DetailsKyle S. Rosenmeyer
Private Sewer System
Routing PW Solid Waste7/22/2014 7/24/2014 PASS
DetailsPeter J. McCullough
Routing PW Sewer Rating7/22/2014 7/23/2014 PASS
DetailsBeverly Mountain
Routing - PUBLIC WORKS7/23/2014 7/23/2014 PASS
DetailsBeverly Mountain
Routing - Erosion and Sediment7/22/2014 7/23/2014 FAIL
DetailsEvan Jenkins
Routing - PLANNING Land Div7/22/2014 7/23/2014 PASS
DetailsDave Abo
Routing PW Street Lights7/22/2014 7/23/2014 FAIL
DetailsMike D Hedge
Intake Approval  7/22/2014 PASS
DetailsJohn Menard
Pending Assignment by JCM7/22/2014 7/22/2014 DONE
DetailsJohn Menard
Intake Approval  7/2/2014 FAIL
DetailsTim L. Woodard
Application received  6/30/2014 DONE
Application submitted via PDS Online on Jun 30 2014 6:44AM
First Notice 2/10/2017