Permanent Occupancy | | | 2/24/2017 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 2/22/2017 | 2/23/2017 | 2/23/2017 | A | PASS |
Jim Storey
|
|
|
Corey Phone #: ###-####
|
BLD-Final | 2/21/2017 | 2/22/2017 | 2/22/2017 | A | CANC |
Dave Hannah
|
|
|
Corey Phone #: ###-####
|
Temporary Occupancy | 2/17/2017 | 5/18/2017 | 2/17/2017 | | DONE |
Candy A. Nichols
|
|
|
Jason Blais ok'd 30 day ext from 2/12/17
|
Meeting | | | 2/17/2017 | | DONE |
|
|
|
Jason Blais ok'd 30 day extension from 2/12/17
|
Telephone call | | | 2/15/2017 | | DONE |
|
|
|
called JT to tell him the temp is expired and that we need the sign off card with the ACHD signature on it so we can issue the perm c of o
|
Telephone call | | | 2/10/2017 | | DONE |
|
|
|
called talked to JT -he will either call the final in or request an extension on the temp c of o
|
BLD-Aging Inspection | 1/2/2017 | 1/2/2017 | 1/4/2017 | | NR |
Jim Storey
|
|
|
|
Temporary Occupancy | 12/19/2016 | 3/19/2017 | 12/19/2016 | | DONE |
Brittany Hill
|
|
|
As per Jason Blais ok to extend for 60 days.
|
Telephone call | | | 12/16/2016 | | DONE |
|
|
|
called Samatha to let know the Temp C of O expired on the 14th of Dec and that she will need to call in her final or req an extension-left message on her phone
|
BLD-Aging Inspection | 10/31/2016 | 10/31/2016 | 10/31/2016 | | PASS |
Jim Storey
|
|
|
|
BLD-Final | 8/30/2016 | 8/31/2016 | 8/31/2016 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
FIRE-Final Inspection | 8/31/2016 | 8/31/2016 | 8/31/2016 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete, final fire sprinkler underground supply inspection complete, final fire alarm inspection complete, fire extinguishers are in place with current inspection tags, final life fire safety inspection passed/complete.
|
BLD-Conference | 8/29/2016 | 8/30/2016 | 8/30/2016 | A | PART |
Jim Storey
|
|
|
Corey Phone #: ###-#### wip
|
BLD-Aging Inspection | 8/17/2016 | 8/17/2016 | 8/17/2016 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Other | 8/2/2016 | 8/2/2016 | 8/2/2016 | A | PASS |
Jim Storey
|
|
|
Electrical penetration fire caulk in bathrooms Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Other | 7/22/2016 | 7/25/2016 | 7/25/2016 | A | PASS |
Jim Storey
|
|
|
Inspect fire extinguisher cabinet openings Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Ceiling Grid Inspection | 5/11/2016 | 5/11/2016 | 5/11/2016 | P | PASS |
Jim Storey
|
|
|
Third floor bathroom ceilings Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Ceiling Grid Inspection | 5/9/2016 | 5/10/2016 | 5/10/2016 | A | PASS |
Jim Storey
|
|
|
Second floor bathroom ceiling inspections Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Ceiling Grid Inspection | 5/9/2016 | 5/9/2016 | 5/9/2016 | P | FAIL |
Jim Storey
|
|
|
Second floor bathroom ceiling inspection Phone #: ###-#### Inspection requested via web by Corey Hockersmith /n postedc
|
BLD-Ceiling Grid Inspection | 5/4/2016 | 5/5/2016 | 5/5/2016 | A | PASS |
Jim Storey
|
|
|
First floor bathroom ceilings Phone #: ###-#### Inspection requested via web by Corey Hockersmith pending mech 1st floor
|
BLD-Ceiling Grid Inspection | 5/4/2016 | 5/4/2016 | 5/4/2016 | P | CANC |
Jim Storey
|
|
|
First floor bathroom ceiling drops Phone #: ###-#### >> Inspection requested via web by Corey Hockersmith Inspection cancelled from web by: Corey Hockersmith
|
BLD-Conference | 4/11/2016 | 4/12/2016 | 4/12/2016 | P | PASS |
Jim Storey
|
|
|
RC inspection third floor Phone #: ###-#### Inspection requested via web by Corey Hockersmith mech rm not done
|
BLD-Wall cover | 4/4/2016 | 4/5/2016 | 4/5/2016 | A | PASS |
Jim Storey
|
|
|
RC inspection second floor Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Wall cover | 3/28/2016 | 3/28/2016 | 3/28/2016 | P | PART |
Mike Jordan
|
|
|
RC inspection first floor ceiling Phone #: ###-#### Inspection requested via web by Corey Hockersmith. Ok, areas above bathrooms not yet insulated.
|
BLD-Framing/Rough-in | 3/22/2016 | 3/22/2016 | 3/22/2016 | P | PASS |
Mike Jordan
|
|
|
3rd floor framing Phone #: ###-#### Inspection requested via web by Corey Hockersmith. All previous coorection items have been resolved at 3rd. floor east, except for extending exterior portion of 2hr. wall.
|
BLD-Framing/Rough-in | 3/18/2016 | 3/21/2016 | 3/21/2016 | A | PART |
Jim Storey
|
|
|
Third floor framing inspection Phone #: ###-#### Inspection requested via web by Corey Hockersmith c/n posted
|
BLD-Framing/Rough-in | 3/18/2016 | 3/18/2016 | 3/18/2016 | P | PASS |
Jim Storey
|
|
|
Second floor framing inspection Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Framing/Rough-in | 3/16/2016 | 3/17/2016 | 3/17/2016 | P | PASS |
Jim Storey
|
|
|
First floor east side Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Framing/Rough-in | 3/10/2016 | 3/14/2016 | 3/14/2016 | A | PART |
Jim Storey
|
|
|
First floor east side and third floor RC west side Phone #: ###-#### Inspection requested via web by Corey Hockersmith russ repairs/ king stud at plm east 1 st floor
|
BLD-Wall Bracing | 1/18/2016 | 1/19/2016 | 1/19/2016 | P | PASS |
Jim Storey
|
|
|
Roof sheathing and strap nailing Phone #: ###-#### Inspection requested via web by Corey Hockersmith ok to cover
|
BLD-Wall Bracing | 1/5/2016 | 1/8/2016 | 1/8/2016 | A | PASS |
Jim Storey
|
|
|
Second and third floor sheer Phone #: ###-#### Inspection requested via web by Corey Hockersmith roof decking ok to cover.
|
CHANGE STATUS TO (ISS) | | | 12/8/2015 | | DONE |
|
|
|
|
Telephone call | | | 12/7/2015 | | DONE |
|
|
|
Spoke with Angila informing her that this permit is going to expire tomorrown and recommend for the to request a 180 day extension if they are not ready to pick the permit up. Informed her on the fee amount that is due
|
Plan assigned to (CJW) | 10/5/2015 | 10/5/2015 | 11/17/2015 | | PASS |
Carl Westfall
|
|
|
The District at Parkcenter - Intown A#2 - Plan Mod
|
Routing - PLAN CHECK | 11/6/2015 | | 11/17/2015 | | PASS |
Carl Westfall
|
|
|
Structural approved
|
Plan Reviewer's activity | | | 11/17/2015 | | DONE |
|
|
|
The Structural Plan Modification was approved. This is a plan modification. The permit is already issued Do not re-issue the permit. See the Plan Modification Review Fees Form for fees due.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/17/2015 | | DONE |
Carl Westfall
|
|
|
|
Permit Ready to Issue | | | 11/17/2015 | | DONE |
Christina Prado
|
|
|
DO NOT REISSUE - PLAN MOD
|
Routing Off Site - STRUCTURAL | 11/9/2015 | | 11/16/2015 | | PASS |
Carl Westfall
|
|
|
Jan Welch
|
Plan resubmittals received | | | 11/6/2015 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 10/23/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/8/2015 | | 10/23/2015 | | FAIL |
Carl Westfall
|
|
|
Revised Structural - Can not approve until the Consultant Structural Engineer approves
|
Routing Off Site - STRUCTURAL | 10/8/2015 | | 10/22/2015 | | FAIL |
Carl Westfall
|
|
|
Jan Welch
|
Plan Modification Accepted | | | 10/8/2015 | | PASS |
|
|
|
Drawings uploaded and accepted
|
Plan Modification Accepted | | | 10/5/2015 | | DONE |
Christina Prado
|
|
|
As requested by CJW
|
CHANGE STATUS TO (ISS) | | | 9/2/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/21/2015 | | 8/25/2015 | | PASS |
Carl Westfall
|
|
|
Plan mod approved
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/25/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/25/2015 | | DONE |
|
|
|
Plan mod fees on BLD14-01818 need to be paid- DO NOT re-issue
|
Plan Modification Accepted | | | 8/21/2015 | | DONE |
|
|
|
|
Telephone call | | | 7/10/2015 | | DONE |
Scott Arellano
|
|
|
Spoke with Kevin Honeycutt with ESI regarding beginning construction of wood framing prior to new fire hydrants being installed due to a delay with United Water and the installation of the new fire hydrants as shown on the approved building plans. There is one existing fire hydrant located at the intersection Park Center Blvd and Highland street, approximately 150 feet from the project site, and a second available fire hydrant located approximately 450 feet from the project site. These two existing fire hydrants will suffice during initial storage of combustible materials and construction thereof until the approved new fire hydrants are installed; as soon as possible. The approved fire hydrants, as shown on plans must be installed as soon as possible.
|
BLD-Foundation | 6/10/2015 | 6/11/2015 | 6/11/2015 | A | PART |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Corey Hockersmith. Pending SI inspection.
|
BLD-Foundation | 6/8/2015 | 6/9/2015 | 6/9/2015 | A | PART |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Corey Hockersmith placed with si pending report
|
BLD-Foundation | 6/1/2015 | 6/2/2015 | 6/2/2015 | A | PART |
Jim Storey
|
|
|
Concrete at 10am. Please call if not able to make it before concrete. Phone #: ###-#### Inspection requested via web by Corey Hockersmith pending si
|
BLD-Footing | 5/27/2015 | 5/28/2015 | 5/28/2015 | A | CANC |
Jim Storey
|
|
|
|
BLD-Footing | 5/27/2015 | 5/28/2015 | 5/27/2015 | A | CANC |
Jim Storey
|
|
|
MTI scheduled for 1:30 PM, Concrete scheduled for 2:00 PM Phone #: ###-#### >> Inspection requested via web by Kevin Honeycutt Inspection cancelled from web by: Kevin Honeycutt
|
BLD-Footing | 5/21/2015 | 5/21/2015 | 5/21/2015 | A | PASS |
Jim Storey
|
|
|
si letter ok/ ft ok to place
|
BLD-Footing | 5/19/2015 | 5/20/2015 | 5/20/2015 | P | PART |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Corey Hockersmith need si contract.
|
BLD-Footing | 5/18/2015 | 5/19/2015 | 5/19/2015 | P | NR |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Corey Hockersmith need aproved plan on site/ need si contract
|
Print Occupancy Form | | | 4/2/2015 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 4/2/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/1/2015 | | DONE |
|
|
|
need gc form, updated values, ACHD receipt, RP
|
Routing - PLAN CHECK | 2/25/2015 | | 3/31/2015 | | PASS |
Carl Westfall
|
|
|
All agencies approved
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/31/2015 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 7/22/2014 | | 3/31/2015 | | PASS |
Carl Westfall
|
|
|
INTOWN BUILDING A - #2 (1st review done)
|
Routing Off Site - STRUCTURAL | 2/26/2015 | | 3/30/2015 | | PASS |
Carl Westfall
|
|
|
|
Routing PW Flood Plain | 2/26/2015 | | 3/30/2015 | | PASS |
Jim Wyllie
|
|
|
|
Routing - MECHANICAL | 3/10/2015 | | 3/10/2015 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 2/26/2015 | | 2/27/2015 | | FAIL |
Troy James
|
|
|
|
Routing - Design Review | 2/26/2015 | | 2/27/2015 | | PASS |
Sarah Schafer
|
|
|
Sarah - Approved per DRH12-00038 and DRH15-00030.
|
Routing - PLAN CHECK | 2/25/2015 | | 2/26/2015 | | |
Carl Westfall
|
|
|
|
Plan resubmittals received | | | 2/25/2015 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 2/11/2015 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 1/26/2015 | | 2/11/2015 | | FAIL |
Carl Westfall
|
|
|
Jan Welch
|
Routing - PLAN CHECK | 1/23/2015 | | 2/11/2015 | | FAIL |
Carl Westfall
|
|
|
|
Routing - Design Review | 1/26/2015 | | 1/30/2015 | | FAIL |
Sarah Schafer
|
|
|
|
Routing - MECHANICAL | 1/26/2015 | | 1/27/2015 | | FAIL |
Troy James
|
|
|
|
Routing - PLANNING | 1/26/2015 | | 1/26/2015 | | PASS |
Cody Riddle
|
|
|
|
Plan resubmittals received | | | 1/23/2015 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 12/9/2014 | | 12/29/2014 | | FAIL |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 12/13/2014 | | 12/29/2014 | | FAIL |
Carl Westfall
|
|
|
Waiting for the resolution of the structural issues.
|
Plan resubmittals requested | | | 12/29/2014 | | DONE |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 12/9/2014 | | 12/13/2014 | | PASS |
Carl Westfall
|
|
|
For the building review, the structural issues have not been resolved.
|
Plan resubmittals received | | | 12/11/2014 | | DONE |
Carl Westfall
|
|
|
|
Routing PW Street Lights | 12/9/2014 | | 12/10/2014 | | PASS |
Mike D Hedge
|
|
|
|
Routing - MECHANICAL | 12/9/2014 | | 12/10/2014 | | FAIL |
Troy James
|
|
|
|
Routing - Design Review | 12/9/2014 | | 12/10/2014 | | FAIL |
Sarah Schafer
|
|
|
|
Routing - PLANNING | 12/9/2014 | | 12/9/2014 | | FAIL |
Cody Riddle
|
|
|
One outstanding condition of approval:
Condition #22-The Army Corps required an updated wetland delineation. (We need final written approval from the Corps before we can issue the permit)
Emailed applicant today. (Note: I updated activity from the master permit BLD14-01818.)
|
Plan resubmittals received | | | 12/8/2014 | | DONE |
Carl Westfall
|
|
|
|
Routing Off Site - STRUCTURAL | 10/22/2014 | | 11/7/2014 | | FAIL |
Carl Westfall
|
|
|
Jan Welch
|
Plan resubmittals requested | | | 11/7/2014 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/16/2014 | | 10/31/2014 | | FAIL |
Carl Westfall
|
|
|
Some items not resolved
|
Routing PW Drainage | 10/22/2014 | | 10/29/2014 | | PASS |
Brian Murphy
|
|
|
|
Routing - FIRE | 10/22/2014 | | 10/28/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review Rev 1 10-29-14
|
Routing - Design Review | 10/22/2014 | | 10/22/2014 | | FAIL |
Sarah Schafer
|
|
|
|
Routing - MECHANICAL | 10/22/2014 | | 10/22/2014 | | FAIL |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 10/22/2014 | | 10/22/2014 | | PASS |
Evan Jenkins
|
|
|
|
Routing - PLANNING | 10/22/2014 | | 10/22/2014 | | FAIL |
Cody Riddle
|
|
|
|
Routing PW Street Lights | 10/22/2014 | | 10/22/2014 | | FAIL |
Mike D Hedge
|
|
|
|
Plan resubmittals received | | | 10/16/2014 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 7/22/2014 | | 8/27/2014 | | FAIL |
Carl Westfall
|
|
|
Since the submittal was incomplete, a structural review could not be done.
|
1st review completed | | | 8/23/2014 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 8/23/2014 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/22/2014 | | 8/23/2014 | | FAIL |
Carl Westfall
|
|
|
|
Routing - MECHANICAL | 8/11/2014 | | 8/14/2014 | | FAIL |
Troy James
|
|
|
|
Routing - FIRE | 7/29/2014 | 7/29/2014 | 8/12/2014 | | FAIL |
Craig D. Hanson
|
|
|
See Fire Plan Review 08-12-14
|
Route to Impact Fee Review | 7/22/2014 | 7/25/2014 | 8/1/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Routing PW Drainage | 7/22/2014 | | 7/29/2014 | | FAIL |
Brian Murphy
|
|
|
|
Routing - PLUMBING | 7/22/2014 | | 7/28/2014 | | PASS |
Bill VanDegrift
|
|
|
|
Routing - Addressing | 7/24/2014 | | 7/24/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing PW Sewer Design | 7/24/2014 | | 7/24/2014 | | PASS |
Kyle S. Rosenmeyer
|
|
|
Private Sewer System
|
Routing PW Solid Waste | 7/22/2014 | | 7/24/2014 | | PASS |
Peter J. McCullough
|
|
|
|
Routing - Design Review | 7/22/2014 | | 7/24/2014 | | FAIL |
Sarah Schafer
|
|
|
|
Routing - PLANNING | 7/22/2014 | | 7/24/2014 | | FAIL |
Cody Riddle
|
|
|
|
Routing PW Sewer Rating | 7/22/2014 | | 7/23/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Erosion and Sediment | 7/22/2014 | | 7/23/2014 | | FAIL |
Evan Jenkins
|
|
|
|
Routing - PLANNING Land Div | 7/22/2014 | | 7/23/2014 | | PASS |
Dave Abo
|
|
|
|
Routing PW Street Lights | 7/22/2014 | | 7/23/2014 | | FAIL |
Mike D Hedge
|
|
|
|
Routing - PUBLIC WORKS | 7/23/2014 | | 7/23/2014 | | PASS |
Beverly Mountain
|
|
|
|
Intake Approval | | | 7/22/2014 | | PASS |
John Menard
|
|
|
|
Pending Assignment by JCM | 7/22/2014 | | 7/22/2014 | | DONE |
John Menard
|
|
|
|
Intake Approval | | | 7/2/2014 | | FAIL |
Tim L. Woodard
|
|
|
|
Application received | | | 6/30/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 30 2014 6:44AM
|
First Notice | | 3/6/2017 | | | |
|
|
|
|
Temporary Occupancy | 9/15/2016 | 12/14/2016 | | | |
|
|
|
|